Sub topic 4
Mapping Symbols and How the Map Is Laid Out
This chapter assumes you know what a value stream is and why you map one product family at a time. It also assumes you can do simple arithmetic on time and rates. Here you learn the standard symbols, where each one goes on the page, and the layout conventions that make a current-state map readable to someone who did not draw it.
Why a Fixed Notation Matters
A value stream map is a communication tool. A team in another plant, a new engineer, or a customer auditor should be able to read your map without a guide. That works only if everyone uses the same symbols and puts them in the same places.
The notation does not need to be perfect. Teams often draw maps in pencil on paper or on a whiteboard first. Use the standard symbols so the map says the same thing to every reader. Add your own symbols only when the standard set has nothing for what you need, and write them in a legend.
The Core Symbols
Most current-state maps use a small set of symbols. The names below follow the common Lean convention. Some software tools draw the shapes slightly differently, but the meaning is the same.
| Symbol | What it represents | What you write in or next to it |
|---|---|---|
| Factory-shaped icon | An outside party: the customer or a supplier | Name, and for the customer, demand per day or month |
| Process box | One step where work is done and material or information flow continuously | Process name and the person or department that owns it |
| Data box | Facts about the process directly below it | Cycle time, changeover time, uptime, operators, available time |
| Inventory triangle (with "I") | Material waiting between steps | Quantity, and the time that quantity represents |
| Truck icon | Shipment to or from an outside party | Frequency and transport method |
| Push arrow (striped) | Material moved forward without a downstream request | Nothing, or the batch size moved |
| Production control box | The place that plans and schedules work | Name of the function or system |
| Thin straight arrow | Manual information flow, such as a paper schedule | Short label, for example "Weekly forecast" |
| Zigzag (lightning) arrow | Electronic information flow | Short label, for example "EDI order" |
| Kaizen burst | A problem or improvement opportunity | A few words naming the problem |
| Operator icon | A person at a step | Count of operators in the data box |
Pull-system symbols exist too, such as supermarkets, kanban cards, and FIFO lanes. You use them when you draw the future state, or when the current process already has a pull element. A current-state map of a mostly push process will have few or none.
Process Boxes Versus Departments
A process box is not a department. It stands for a stretch of work where material moves without stopping. If parts move one at a time from a cutting machine to a bender and nothing waits between them, they can share one box. If parts pile up between the machines, draw two boxes with an inventory triangle between them.
This rule keeps the map honest. The places where work stops are where lead time hides, so each stop needs its own symbol.
Data Boxes
A data box sits directly under its process box. It holds the facts you collected while walking the process. The usual entries are:
- C/T (cycle time): how long one unit takes at this step.
- C/O (changeover time): time to switch from one product type to another.
- Uptime: the share of scheduled time the equipment is available and running.
- Operators: how many people work at the step.
- Available time: working seconds per shift, after breaks.
Use the same entries in every data box, in the same order. The next chapter covers how to fill them in. For now, the layout rule is consistency, so the reader can scan across all the boxes and compare one value.
Inventory Triangles
Draw a triangle between two process boxes wherever material waits. Under it, write the quantity and, when you know it, the time it represents. For example, 1,350 units in front of Welding at 450 units per day is 3 working days. Never leave a gap without a triangle if you saw material sitting there. A missing triangle hides the largest source of delay on most maps.
How the Map Is Laid Out
The layout follows a fixed pattern. A reader who knows it can find any fact in seconds.
- Customer at the top right. The customer is the reason the stream exists. Write demand here, such as "450 units per day."
- Supplier at the top left. Raw material enters from the left.
- Production control at the top center. It sits between supplier and customer because it receives orders from one and sends schedules to the other.
- Process boxes in a row along the middle, left to right, in the order the work happens. Do not reorder them to fit the page.
- Data boxes directly below each process box.
- Material flow along the middle row, with inventory triangles between boxes.
- Information flow in the upper band, drawn between customer, production control, supplier, and the processes.
- The timeline along the bottom, a stepped line of wait times and process times.
So material flows left to right along the middle, information flows through the top, and the timeline summarizes everything at the bottom.
The diagram is a flowchart, so it shows connections but not the exact page positions a hand-drawn map has. On paper, the supplier, production control, and customer sit in a row across the top, and the process boxes sit below them in a second row.
Direction and Order
Draw the process boxes in the order the work actually happens, even if the plant floor is laid out differently. Material may move back and forth between buildings, and that travel is itself a finding. Keep the map in sequence, and note the distance or transport in the arrow label.
Information arrows can go in any direction, since they show who tells whom what to do. Material arrows should only go forward. If material goes back for rework, draw a separate loop and label it with the rework rate. Do not hide it in a cycle time.
Parallel Paths
Some products split into two routes and rejoin, for example two machines doing the same operation. Draw the paths one above the other with a merge point afterward. Keep the main product flow on the center line. Keep it to one product family, so branches stay few. If the map has more than a handful of branches, the scope is probably too wide.
The Timeline Band
The timeline runs under the data boxes as a stepped line. The upper steps are wait times, which come from the inventory triangles. The lower steps are process times, which come from the cycle times. Each step lines up with the process box above it. At the right end, write two totals: total lead time and total process time.
Line the steps up horizontally with the boxes they belong to. A reader should be able to look up from a high wait step and see the triangle that caused it. The arithmetic for the timeline is covered in its own chapter.
Information Flow Conventions
Draw information arrows in the upper band so they do not cross the material row. Label each one with what it carries and how often. "Weekly forecast," "Daily ship list," and "Faxed order" tell the reader more than a bare arrow. Use a thin straight arrow for paper, verbal, or manual information, and a zigzag arrow for electronic information. This difference matters. A paper schedule that is printed on Monday and used all week is a different kind of control from a live system update.
If several steps each receive their own schedule from production control, draw one arrow per step. That picture, many separate schedules sent to many steps, is a clear sign of push scheduling. It is easy to see on a map and hard to see on the floor.
Common Layout Errors
- Mixing steps that stop. Putting two steps in one box when material waits between them removes a triangle and understates lead time.
- Reordering for tidiness. Rearranging boxes to fit the page changes the story the flow tells.
- Unlabeled arrows. An information arrow with no frequency cannot be checked.
- Data boxes with different entries. If Welding shows uptime and Assembly does not, the reader cannot compare them.
- Too many symbols of your own. Custom icons without a legend make the map unreadable to outsiders.
- Crowding. If the map does not fit on one page, tape sheets together or use a larger board. Do not shrink the text until it cannot be read.
Putting It Together
Take the four-step stream from the diagram. The layout checklist for it looks like this:
- Customer at top right, labeled 450 units per day.
- Supplier at top left, with a weekly shipment truck to Stamping.
- Production control at top center, with a forecast arrow from the customer and schedule arrows to Stamping, Assembly, and Shipping.
- Four process boxes in order: Stamping, Welding, Assembly, Shipping, each with a data box showing cycle time.
- Inventory triangles between the boxes: 4,500, 1,350, and 900 units, with 450 units at Shipping.
- Push arrows between each pair of boxes.
- A timeline along the bottom, with wait steps matching each triangle.
If you can tick all seven, the layout is complete. The numbers can still change as you verify them.
Exercise
A map shows Welding and Assembly in one process box. During your walk you saw 1,350 parts stacked in front of Assembly, waiting for the next shift. What is wrong with the map, and how do you fix it?
Show answer
The map hides a point where work stops. Material waits between Welding and Assembly, so the two steps are not a continuous flow. Split them into two process boxes, draw an inventory triangle between them with 1,350 units (3 working days at 450 units per day), and add a push arrow. Give each box its own data box, and add the wait step to the timeline.
Exercise
In the standard layout, where do you draw the customer, the supplier, and production control, and what kind of arrow connects production control to a process step that receives a printed weekly schedule?
Show answer
The customer goes at the top right, the supplier at the top left, and production control at the top center. A printed weekly schedule is manual information, so the arrow is a thin straight arrow labeled "Weekly schedule." A zigzag arrow would be used only for an electronic signal.