Sub topic 14
From Current State to Future State
This chapter covers the last step of current-state mapping: handing the map to the people who will design the future state. It assumes you can already draw a current-state map and compute takt time, lead time, and process cycle efficiency (PCE) from it. It also assumes you know what a product family is and can read inventory triangles and push arrows. The running example is the four-step stream from earlier chapters: Stamping, Welding, Assembly, and Shipping, with demand of 450 units per day and 27,000 available seconds per day.
Why the handoff is a separate step
A current-state map has no value until someone uses it to decide what to change. The handoff turns a drawing into a baseline and a short list of questions. It is a step of its own because teams often skip it. They finish the map, feel they have learned something, and go straight to fixing whatever looks worst. The result is a set of local improvements that do not reduce lead time for the customer.
Handing off well means three things:
- The map and its numbers are trustworthy enough that others can build on them.
- The findings are written as observations tied to data, not as solutions.
- The future-state team knows which questions the map is meant to answer.
What goes in the handoff package
Give the future-state team one package, not a loose drawing. It should contain:
- The one-page current-state map, dated, with the product family and the start and end points written on it.
- The data behind every box: where each number came from, who measured it, and when.
- The timeline totals: lead time, total process time, and PCE.
- Takt time and the demand figure it was computed from.
- A list of findings, each pointing to a place on the map.
- A list of known gaps, such as a step you could not observe on night shift.
Item 6 matters more than it looks. A team that knows a cycle time is an estimate will check it before sizing a pull system around it. A team that does not know will trust it.
Turning findings into future-state questions
Findings are only useful if they map to design decisions. The standard future-state questions (takt time, whether to build to a supermarket or straight to shipping, where to use continuous flow, where to use pull, which single point schedules the stream, how to level the mix, how much work to release at a time, and which process improvements are needed) each connect to something you measured.
| Finding on the current-state map | Data that supports it | Future-state question it feeds |
|---|---|---|
| Shipping cycle time (62 s) is above takt (60 s) | Cycle time and takt time | What process improvements are needed at Shipping to meet takt? |
| 4,500 units wait in front of Welding's upstream step, Stamping | Inventory count, 10 days of demand | Where should a supermarket with pull replace this queue? |
| Every step is scheduled separately from a central plan | Information flow arrows | Which single point should schedule the stream (the pacemaker)? |
| 16 days of lead time against 148 s of process time | Timeline, PCE of about 0.03% | Where can continuous flow remove waiting between steps? |
| Push arrows between all four steps | Material flow symbols | Where can pull replace push? |
Note the wording of the first column. Each finding states what you saw. None says "buy a faster machine" or "add a second shipping line." Solutions belong to the next phase, where the team can compare options against takt time and demand.
Freezing the baseline in code
Before anyone changes the process, record the baseline in a form you can recompute. The script below reuses the example data, then compares an illustrative target. The target total of 1,350 units of work in process is a made-up goal for demonstration, not a recommendation.
AVAILABLE_SECONDS_PER_DAY = 27000
DAILY_DEMAND = 450
steps = [
{"name": "Stamping", "cycle_s": 1, "queue_units": 4500},
{"name": "Welding", "cycle_s": 39, "queue_units": 1350},
{"name": "Assembly", "cycle_s": 46, "queue_units": 900},
{"name": "Shipping", "cycle_s": 62, "queue_units": 450},
]
takt_s = AVAILABLE_SECONDS_PER_DAY / DAILY_DEMAND
wip_units = sum(s["queue_units"] for s in steps)
process_s = sum(s["cycle_s"] for s in steps)
# Little's Law: lead time (days) = WIP / throughput
lead_days = wip_units / DAILY_DEMAND
lead_s = lead_days * AVAILABLE_SECONDS_PER_DAY + process_s
pce = process_s / lead_s
print(f"Baseline takt: {takt_s:.0f} s")
print(f"Baseline WIP: {wip_units} units")
print(f"Baseline lead time: {lead_days:.2f} days")
print(f"Baseline PCE: {pce:.4%}")
# Steps that must be improved before any flow redesign can meet takt
for s in steps:
if s["cycle_s"] > takt_s:
print(f"Gap: {s['name']} is {s['cycle_s'] - takt_s:.0f} s over takt")
# Illustrative target, to be replaced by the future-state team
target_wip = 1350
target_days = target_wip / DAILY_DEMAND
print(f"Target lead time at {target_wip} units WIP: {target_days:.2f} days")Running it prints a baseline of 7,200 units in process, a lead time of about 16 days, a PCE of about 0.0342%, and one gap: Shipping is 2 s over takt. The target line shows that 1,350 units of WIP at the same demand would mean a 3-day lead time.
The script does two jobs. It gives the team a number to beat. It also shows that the lead time on the timeline and the WIP-based figure agree, which is the Little's Law cross-check from the previous chapters. If those two disagree on your own map, resolve that before handing off.
How the handoff flows
The loop at the end is deliberate. After changes go in, you map again and compare with the baseline. Without a frozen baseline, that comparison is impossible.
Check the map before handing it off
A short review catches most problems that would otherwise surface weeks into design work.
- Arithmetic: Recompute takt, lead time, and PCE from the data boxes. The timeline total must equal the sum of waits and process times.
- Cross-check: Lead time from the timeline should agree with total WIP divided by daily throughput. In the example both give 16 days.
- Units: Every inventory count should be convertible to days of demand using the same demand figure.
- Coverage: Each process box should have a data source noted. Flag any that came from a standard rather than observation.
- Walk-through: Have someone who works in the stream read the map aloud. Corrections at this stage cost minutes.
Common handoff errors
- Handing over a solution disguised as a finding. "Shipping needs a second operator" is a design choice. "Shipping cycle time is 62 s against a 60 s takt" is a finding.
- Treating the largest queue as the biggest problem. The 4,500-unit queue at Stamping is the largest inventory, but Shipping is the only step that cannot meet takt. Large queues are a symptom of batching and push. A step over takt is a capacity constraint. The future state must address both, in different ways.
- Mixing demand figures. If the map used 450 units per day but sales expects growth, say so. A future state sized to today's demand may not survive next year's.
- Dropping the known gaps. An estimated cycle time that is never flagged gets treated as fact.
- Improving before agreeing the target state. Fixing Welding in isolation may do nothing for lead time if the queues stay.
- Losing the baseline. If the map is redrawn or edited after changes begin, you cannot show what improved.
Setting expectations for the future state
A future-state map is not a wish list. It is a design for one stream that can be reached in a defined period, usually in steps. Set expectations early:
- The future state targets the same product family and the same boundaries, so the comparison with the baseline is fair.
- Lead time, PCE, and inventory are the headline measures, with takt time as the pacing figure.
- A reduction from 16 days to 3 days is the kind of result a team might aim for. It will not be reached in one change, and the plan should say which changes come first.
Exercise
Using the example stream (takt 60 s, cycle times 1, 39, 46 and 62 s, queues of 4,500, 1,350, 900 and 450 units, demand 450 units per day), write two findings for the handoff package. One must be a capacity finding and one an inventory finding. Each must cite its data and must not propose a solution. Then state what total WIP a 4-day lead time would imply at the same demand.
Show answer
Capacity finding: Shipping has a cycle time of 62 s against a takt time of 60 s, so it is 2 s over takt and cannot meet demand at current performance. Inventory finding: Stamping has 4,500 units waiting, which is 10 days of demand (4,500 / 450), and the stream holds 7,200 units in total, which is 16 days of demand. A 4-day lead time at 450 units per day implies a WIP of 4 × 450 = 1,800 units, from Little's Law (WIP = lead time × throughput).
Exercise
A teammate edits the current-state map after the first improvement is installed, changing the Shipping cycle time from 62 s to 58 s so that the map "stays current." Explain why this is a problem for the future-state effort.
Show answer
The map was the baseline. Changing it removes the record of the starting condition, so the team can no longer show what the improvement achieved or check whether the lead time and PCE moved as expected. The correct approach is to keep the original dated map, then draw a new current-state map after the change and compare the two.