This chapter assumes you can do simple arithmetic on time and rates. It also assumes you have already chosen a product family and walked the process to collect observations. This chapter covers what goes on the page. Takt time and the timeline come in later chapters, so here we only use takt time as a reference number.
What a process box represents
A process box stands for one area of continuous flow. It is not one machine, one person, or one department. Draw one box for each stretch of work where material moves from step to step without stopping to wait in a queue. When material stops and waits, a new box begins.
This rule keeps the map small. A welding cell with three stations that pass parts directly from one to the next is one box. If parts pile up between two stations, those stations belong in separate boxes with an inventory triangle between them.
Name each box by what happens, using a verb or a short noun phrase, such as "Weld frame" or "Pack and ship". Avoid names that point to a department ("Building 2"), because they hide what the work is.
Boxes run left to right in the order material moves. A data box sits directly under each process box and holds the measurements for that box.
What goes in a data box
Each data box holds a few numbers. Use the same set for every box on the map, so the boxes can be compared.
| Field | Meaning | Unit | Where it comes from |
|---|---|---|---|
| C/T (cycle time) | Time between one good unit leaving the process and the next | seconds | Stopwatch observation at the point of work |
| C/O (changeover time) | Time to switch from one product or variant to another | minutes | Observed changeovers, from last unit of A to first good unit of B |
| Uptime | Share of scheduled time the equipment is available to run | percent | Maintenance or downtime records, checked against observation |
| FPY (first-pass yield) | Share of units that are good the first time, with no rework or scrap | percent | Quality records, checked against observation |
| Operators | People working in the box | count | Direct observation |
| Available time | Working time per shift or day, minus breaks and meetings | seconds | Shift schedule |
| Batch size | Units processed or moved together | units | Observation |
Include only fields you can measure. A blank field is honest, and an invented value misleads everyone who reads the map. Add other fields when your process needs them, such as number of variants or scrap rate. Keep the set identical across boxes.
Cycle time versus processing time
Cycle time is how often a finished unit comes out of the box. Processing time is how long one unit spends in the box from start to finish. In a single-operator station they are the same. In a cell with several stations in sequence, the processing time is longer than the cycle time, because several units are in the cell at once.
Choose one definition and use it for the whole map. This tutorial uses cycle time as the time between consecutive units leaving the box, and this chapter uses it in every data box.
Drawing the example map
The running example is a metal bracket with four process boxes. Daily demand is 450 units and available time is 27,000 seconds per day, so takt time is 60 seconds. The map below shows the flow with inventory between the boxes.
On paper, each process box has its data box attached beneath it. The queues are drawn as inventory triangles with the count written below. The queue size goes beside the triangle and is not part of the data box.
Recording the data in a structure
Writing data boxes as a table or a small program keeps the map consistent and lets you check the numbers. The program below stores each data box and computes how many units each box can produce per day. That check tells you which boxes can keep up with demand.
from dataclasses import dataclass
AVAILABLE_S = 27000 # seconds per day
DEMAND = 450 # units per day
@dataclass
class DataBox:
name: str
cycle_s: float
uptime_pct: float
fpy_pct: float
operators: int
def capacity(self) -> float:
"""Units per day the box can run, given uptime."""
return AVAILABLE_S * (self.uptime_pct / 100) / self.cycle_s
def good_capacity(self) -> float:
"""Units per day that are good the first time."""
return self.capacity() * (self.fpy_pct / 100)
boxes = [
DataBox("Stamping", 1, 85, 98, 1),
DataBox("Welding", 39, 90, 98, 2),
DataBox("Assembly", 46, 95, 99, 3),
DataBox("Shipping", 62, 100, 100, 2),
]
for b in boxes:
flag = "" if b.good_capacity() >= DEMAND else " <-- below demand"
print(f"{b.name:9} capacity {b.capacity():8.1f} good {b.good_capacity():8.1f}{flag}")Running it shows that Stamping, Welding, and Assembly all have good capacity above 450 per day. Shipping produces about 435 units per day, which is below demand. Its 62-second cycle time is longer than the 60-second takt time, so it cannot keep up. This is the kind of question the data boxes are meant to answer.
Common mistakes with data boxes
Using the best observed value
Operators and supervisors often quote the speed a machine can reach on a good day. The data box should hold the typical value you observed. If cycle time varies, record several observations and take the middle value, then note the range beside it.
Mixing units
Cycle time in seconds, changeover in minutes, and available time in seconds are easy to mix up. Write the unit in each field. The program above divides seconds by seconds, and a changeover in minutes would break that if it were used in the same formula without conversion.
Ignoring uptime and yield
A box with a 39-second cycle time looks fast, but at 90% uptime and 98% yield its good output is lower than 27,000 / 39 = 692 units. If you leave those fields out, the map overstates capacity and hides the reason queues form in front of the next step.
Splitting or merging boxes wrongly
Two failure patterns are common.
- Drawing one box per machine produces a map that is too detailed to read. If parts flow directly from machine to machine, merge them.
- Drawing one box for a whole department hides queues. If a pile of work forms inside the department, split it there.
Copying data from a system
Data from an ERP system or a ticketing tool often reflects planned values: routing times, standard times, or ticket status changes. These can differ greatly from real work. Use system data to guide where to look, and confirm it at the point of work.
Handling variation and several products
Within one product family, products may have different cycle times. Choose one of these approaches and apply it to the whole map:
- Use the most common variant and note the others in a comment.
- Use a weighted average, weighting by share of demand.
- Draw a separate data box line for each major variant, if the differences are large.
Whatever you choose, write it on the map. The reader needs to know whether the 46 seconds is "typical" or "weighted".
When changeover time is long, also record batch size. A box that changes over in 30 minutes and runs batches of 500 behaves very differently from one that changes over in 2 minutes and runs batches of 20. Large batches are one reason inventory builds up in front of the next box.
Checking the finished boxes
Before moving on to the timeline, check each box against these questions:
- Does the process box represent a continuous flow, with a queue before and after it?
- Is every field filled in with an observed value, or deliberately left blank?
- Are the units written down?
- Is cycle time defined the same way in every box?
- Is the cycle time compared with takt time, and is any box slower than takt marked?
If the answers are yes, the boxes are ready for the timeline and for reading the map, which later chapters cover.
Exercise
The Assembly box has a cycle time of 46 seconds, uptime of 92%, and a first-pass yield of 95%. Available time is 27,000 seconds per day and demand is 450 units per day. How many units can it run per day, how many are good first time, and does it meet demand?
Show answer
Capacity is 27,000 × 0.92 / 46 = 540 units per day. Good first-time output is 540 × 0.95 = 513 units per day. Both exceed 450, so Assembly meets demand with a margin of 63 good units.
Exercise
A cell has three stations in a row. Parts pass directly from one station to the next with no waiting area. The second station has a 3-unit pile in front of it that is never empty. Should the cell be drawn as one process box or more?
Show answer
Draw it as at least two boxes. A pile that is always present is a queue, and a queue marks the end of one continuous flow and the start of the next. The first station is one box, with an inventory triangle of 3 units, followed by a box for the second and third stations if those two still pass parts directly.