Walking the Process and Collecting Data
Assume you already understand basic lean terms, can perform simple rate and time calculations, and know the process you are mapping. This chapter uses a production example, but the same method applies to service work and software delivery. In each case, observe the work where it happens instead of relying on reports or memory.
Start at the Point of Delivery
A current-state map describes the process as it operates now. Begin with the customer or the point where completed work leaves the stream. Then walk upstream through every step that contributes to the selected product family.
This direction helps you ask a useful question at each step: what does this process need, and where does that input wait? Record both the work and the delays between work steps.
Observe Before You Measure
At the point of work, first understand the flow and the local vocabulary. Ask the operator or worker to explain the normal sequence, but treat the explanation as a hypothesis to verify.
Collect data for each process step, including:
- Cycle time, which is the elapsed time to complete one unit or one transaction.
- Changeover time, which is the time required to switch from one product or work type to another.
- Available working time, excluding planned breaks and known downtime.
- Uptime or availability, when equipment reliability affects output.
- Batch size and transfer quantity.
- Number of people or machines involved.
- Work in process, or WIP, which is unfinished work waiting or being processed.
- Defects, rework, and interruptions that affect normal flow.
Do not confuse cycle time with touch time. Touch time measures how long a person actively works on an item. Cycle time measures the interval between completed units and may include automatic processing or operator waiting.
Use a Consistent Observation Sheet
Choose a clear unit, such as seconds per unit or minutes per case. Record timestamps rather than estimates when possible. Observe several consecutive units and note the range, not only the average. A single fast cycle can hide the constraint that controls the whole stream.
| Field | Example | Why it matters |
|---|---|---|
| Cycle time | 46 seconds | Compare capacity with demand |
| Queue before step | 900 units | Estimate waiting time |
| Batch size | 50 units | Detect transfer delays |
| Defects or rework | 2 of 100 units | Explain lost capacity |
Write down abnormal conditions separately. A machine stopped for maintenance, an urgent order, or a missing component may be important, but it should not silently become the “normal” cycle time.
Validate the Numbers
After collecting observations, review the data with the people who perform and schedule the work. Ask whether the selected period represents a typical day. Compare physical counts with system records, but do not replace physical observation with system data.
Use these checks:
- Count WIP at a defined location and time.
- Confirm whether queue counts include rejected, reserved, or completed items.
- Check that all times use the same unit.
- Compare output with the actual working time available.
- Mark uncertain values with a note instead of presenting them as facts.
A useful current-state map makes uncertainty visible. You can return to the process and improve the measurement before designing the future state.
A Practical Walking Sequence
Walk the stream more than once if needed. On the first pass, trace the physical and information flow. On the second pass, measure times, queues, batches, and interruptions. On the final pass, check whether the numbers agree with actual output.
For a service or software process, replace physical inventory with waiting cases, tickets, queued changes, or work awaiting review. Record handoff time, active work time, queue age, and rework. The principle is the same: observe the work at its source and define each measurement clearly.
Exercise
You observe 20 units. The cycle times are mostly 40–45 seconds, but three units take 90 seconds because an operator searches for parts. What should the current-state data record show?
Show answer
Record the observed range and the three interruptions. Do not report only the average. Investigate the part-search problem because it may explain recurring delay and excess WIP.