Who attends a tollgate and the possible decisions
This chapter assumes you know the five DMAIC phases and why a project pauses for a tollgate review between them. It also assumes you know the usual Lean Six Sigma roles by name: Champion, Black Belt, Green Belt and Process Owner. Here you learn who sits in the review, what each person is responsible for, and the four decisions the review can reach.
Why the attendee list matters
A tollgate is a decision meeting. A decision needs people who can judge the evidence, people who can commit resources, and people who will live with the result. If any of these is missing, the meeting turns into a status update. If too many people attend, nobody feels accountable.
A useful rule is that every attendee has a stated reason to be there. If you cannot say what a person will decide, challenge or supply, consider leaving them off the invitation and sending them the minutes.
The core roles
| Role | Responsibility at the tollgate | Typical question they ask |
|---|---|---|
| Champion (sponsor) | Holds decision authority. Releases resources and removes barriers. Signs the decision. | Is this still worth our investment? |
| Process Owner | Owns the process day to day. Confirms the findings match reality and later accepts the control plan. | Will this work on my shop floor or in my queue? |
| Project leader (Black Belt or Green Belt) | Presents the evidence, the findings and the proposed next step. Records actions. | What did we learn, and what do we need next? |
| Master Black Belt or coach | Reviews the method. Checks that the statistics and tools were applied correctly. | Do the data support this conclusion? |
| Finance representative | Validates savings or cost claims against company rules. | Are these benefits real and countable? |
| Team members and subject matter experts | Answer detailed questions about data, process steps or technical limits. | What happened when we tested this? |
Roles vary by organization. Some companies merge the coach and the reviewer. Small projects may have a single manager acting as both Champion and Process Owner. When that happens, check that the person still receives the challenge the separate roles would have given.
Facilitator and scribe
Two practical roles are often forgotten. The facilitator keeps the meeting on the agenda and makes sure a decision is reached before it ends. The scribe writes the decision, the conditions and the actions with owners and due dates. The project leader should not do both jobs while also presenting.
Roles versus decision rights
Only some attendees vote. Decide this before the meeting.
- The Champion decides. In some organizations a small steering group decides together.
- The Process Owner has a strong voice and often an effective veto, because a solution the owner will not run will not last.
- The coach and finance representative advise. They report whether the evidence meets the standard, but they do not approve the project's direction.
- The project leader presents and answers. The leader does not approve their own phase.
Write the decision rule into the charter or the governance plan, for example: "The Champion decides after hearing the Process Owner, coach and finance." Then there is no argument about who decided.
The four decisions
A tollgate review ends in one of four outcomes.
- Go. The evidence for the phase is complete and sound. The team moves to the next phase.
- Conditional go. The evidence is mostly complete. The team moves ahead while closing named gaps by agreed dates.
- Hold. Important evidence is missing or weak. The team stays in the current phase and returns for another review.
- Stop. The project should end, or be re-chartered. The business case has gone, the problem is solved by other means, or the goal cannot be reached.
Choosing between them
The key question is whether the gap puts the next phase at risk.
- A missing signature or a formatting issue in a document is a good reason for a conditional go, if the gap does not change any findings.
- A measurement system that failed its check is a reason for a hold. Every later number would rest on data you cannot trust.
- A priority shift, a process being retired, or a baseline already at goal is a reason to consider a stop.
A conditional go needs discipline. Each condition must have an owner, a due date and a defined way to confirm it. Decide in advance what happens if a condition is not met. The usual answer is that the project drops back to hold.
flowchart TD
A[Evidence presented] --> B{Business case still valid?}
B -- No --> S[Stop or re-charter]
B -- Yes --> C{Critical evidence missing?}
C -- Yes --> H[Hold: repeat the review]
C -- No --> D{Minor gaps remain?}
D -- Yes --> CG[Conditional go with owners and dates]
D -- No --> G[Go to next phase]The diagram above must follow the required format, so the version below is the one to use.
Encoding the decision rule
The Measure checklist from the earlier chapter returned only go or hold. You can extend that idea to all four outcomes by separating critical items from minor ones and by checking the business case first.
def decide(critical_missing, minor_missing, case_valid):
"""Return a decision and the list of gaps behind it."""
if not case_valid:
return "stop", []
if critical_missing:
return "hold", critical_missing
if minor_missing:
return "conditional go", minor_missing
return "go", []
decision, gaps = decide(
critical_missing=[],
minor_missing=["Sign-off on the data collection plan"],
case_valid=True,
)
print(decision, gaps)The code only supports the conversation. People still decide which items count as critical. Agree on that split before the review, not during it.
Running the meeting
A workable structure for a 60-minute review:
- Confirm the purpose and the decision rule (5 minutes).
- Restate the problem, goal and scope in one slide (5 minutes).
- Present the phase evidence against the checklist (20 minutes).
- Questions and challenge from the Process Owner, coach and finance (20 minutes).
- Decision, conditions and actions read back by the scribe (10 minutes).
Ask for the decision out loud and have each decision-maker state it. Silence is not approval.
Recording the outcome
Record these items after every review:
- The decision and the date.
- The name and role of each decision-maker.
- Conditions, each with an owner and due date.
- Risks raised and who owns them.
- The date of the next review, when the decision is hold or conditional go.
A project leader who starts the next phase without this record has no proof of authority. Later reviewers also cannot see why a gap was accepted.
Common errors
- The Champion is absent and a delegate who cannot commit resources attends. The decision then has to be taken again later.
- The Process Owner is invited but sees the findings for the first time in the meeting. Share material beforehand and brief the owner separately.
- Conditional go is used to avoid a hard conversation. If most of the checklist is a condition, the correct decision is hold.
- Stop is treated as a failure. A project that ends early because the case has gone has saved the company the cost of the later phases.
Exercise
A Measure tollgate shows a complete data collection plan and a baseline sigma level, but the measurement system analysis found that two inspectors disagree on 30% of defect calls, and no fix has been made. The Champion wants to keep the schedule. Which decision is most appropriate, and why?
Show answer
Hold. The disagreement means the defect counts, and therefore the baseline, cannot be trusted, and every later phase would depend on them. A conditional go is wrong because the gap is critical, not minor. The team should retrain or redefine the defect criteria, repeat the measurement system check, recalculate the baseline and return for another review.
Exercise
Name two attendees at a tollgate who advise but do not decide, and one who must be briefed before the meeting rather than hearing the findings there for the first time.
Show answer
The coach (Master Black Belt) and the finance representative advise. The Process Owner must be briefed beforehand, because the owner has an effective veto and must accept the solution and the control plan later.