Sub topic 10
Calculating the baseline: DPMO, sigma level and capability
This chapter assumes you know mean, standard deviation and defect rates. It also assumes you have met the Measure phase: the data collection plan is executed and the measurement system has passed its check. The baseline is the last Measure deliverable before the tollgate. It states how the process performs today, in numbers that the Improve and Control phases can be compared against.
What a baseline is for
A baseline answers one question: what is the current performance of the Y, the project's key output measure, over a defined period and scope? Without it, a project cannot show that an improvement happened. The baseline also tells the tollgate reviewers whether the goal in the charter is realistic.
Which metric you use depends on the data type.
| Data type | Example Y | Typical baseline metrics |
|---|---|---|
| Discrete (counts of defects) | Errors on an invoice | DPU, DPMO, sigma level, yield |
| Discrete (pass/fail units) | Orders shipped late | Proportion defective, first-pass yield |
| Continuous (measured) | Delivery time in hours | Mean, standard deviation, Cp, Cpk, Pp, Ppk |
Defects, units and opportunities
Three counts feed every discrete baseline. A defect is any single failure to meet a CTQ requirement. A unit is the item you inspect, such as an invoice or a call. An opportunity is a distinct chance for a defect to occur on that unit.
- DPU (defects per unit) is defects divided by units.
- DPO (defects per opportunity) is defects divided by units times opportunities per unit.
- DPMO (defects per million opportunities) is DPO multiplied by 1,000,000.
DPMO exists so that processes of different complexity can be compared. A form with 40 fields and a form with 4 fields cannot be compared by defects per form, but they can be compared by DPMO.
A defect is not the same as a defective unit. One invoice can carry three defects and still counts as one defective unit. Mixing the two is the most common baseline error.
Computing DPMO and sigma level
Suppose an audit of 500 order forms found 27 defects. Each form has 4 opportunities: customer, item code, quantity and delivery date.
- DPU = 27 / 500 = 0.054
- DPMO = 27 / (500 × 4) × 1,000,000 = 13,500
The code below does the same calculation and converts DPMO to a sigma level.
from statistics import NormalDist
defects = 27
units = 500
opportunities_per_unit = 4
dpmo = defects / (units * opportunities_per_unit) * 1_000_000
# Long-term yield converted to a short-term sigma level using the conventional 1.5 sigma shift
yield_rate = 1 - dpmo / 1_000_000
sigma_level = NormalDist().inv_cdf(yield_rate) + 1.5
print(f"DPMO: {dpmo:.0f}")
print(f"Sigma level: {sigma_level:.2f}")The output is a DPMO of 13,500 and a sigma level of 3.71.
The conversion works in two steps. First, inv_cdf finds the z-score that leaves a tail of 13,500 per million, which is about 2.21. Second, the code adds 1.5. That addition is the conventional shift. It assumes that over the long run a process drifts about 1.5 standard deviations from its target, so data collected over a short period is assumed to look better than the long-term truth. Use this conversion consistently and state that you used it.
The table shows the standard reference points under the same convention.
| Sigma level | DPMO | Yield |
|---|---|---|
| 2 | 308,538 | 69.1% |
| 3 | 66,807 | 93.3% |
| 4 | 6,210 | 99.38% |
| 5 | 233 | 99.977% |
| 6 | 3.4 | 99.99966% |
Defining opportunities honestly
DPMO depends directly on the number of opportunities you declare. Declare 40 opportunities on a form where only 4 are meaningful and the DPMO falls by a factor of ten. The process has not improved. The measure has been diluted.
Use these rules to keep the count honest:
- Count only opportunities that tie to a CTQ requirement from the Define phase.
- Count only opportunities that can fail independently and that you can actually detect.
- Fix the count in the operational definitions before collecting data, and do not change it afterward.
- If opportunities are disputed, report DPU and proportion defective alongside DPMO.
Capability for continuous data
When the Y is measured, such as cycle time or fill weight, you compare the spread of the data with the specification limits. The limits are the LSL (lower) and USL (upper). Two indices matter most:
- Cp = (USL − LSL) / (6 × standard deviation). It shows whether the spread could fit inside the limits if the process were centered.
- Cpk = min((USL − mean), (mean − LSL)) / (3 × standard deviation). It also penalizes an off-center mean.
A Cpk of 1.33 or higher is a common minimum target. A Cpk of 1.0 means the nearer limit sits only three standard deviations from the mean. The indices Pp and Ppk use the same formulas, but with the standard deviation of all data over a long period. Cp and Cpk use a within-subgroup standard deviation, which reflects short-term variation only.
lsl = 9.0
usl = 11.0
mean = 10.2
std_dev = 0.5
cp = (usl - lsl) / (6 * std_dev)
cpk = min(usl - mean, mean - lsl) / (3 * std_dev)
print(f"Cp: {cp:.2f}")
print(f"Cpk: {cpk:.2f}")This prints a Cp of 0.67 and a Cpk of 0.53. The gap shows that the process is off-center toward the upper limit, and its spread is also too wide.
Common errors
- Computing the baseline from data the measurement system analysis rejected. A baseline is only as good as the gauge.
- Using a sample that is too small or from too short a period, which hides shifts and seasonality.
- Reporting sigma level with no stated DPMO, opportunity count, period or sample size.
- Confusing defects with defective units, or DPU with DPMO.
- Changing the opportunity definition after the baseline was set, which makes later gains impossible to compare.
- Reporting Cpk for unstable or strongly non-normal data.
What goes into the baseline statement
A reviewer at the Measure tollgate should find these items in one place: the metric and its operational definition, the data source, the period and sample size, the opportunity count, the DPMO or Cpk, the sigma level with the convention used, and a comparison with the charter goal. If the baseline shows the goal is already met or is unreachable, the charter is revised at this point, before the Analyze phase begins.
Exercise
An audit of 800 loan applications finds 64 defects. Each application has 5 opportunities for a defect. Calculate DPU and DPMO. Then state what happens to the DPMO if the team recounts and decides the form has 10 opportunities, and why that change should not be allowed after data collection.
Show answer
DPU = 64 / 800 = 0.08. DPMO = 64 / (800 × 5) × 1,000,000 = 16,000. With 10 opportunities, DPMO = 64 / (800 × 10) × 1,000,000 = 8,000, half the original figure. The process has not changed, so the lower number is an artifact of the new count. Opportunities must be fixed in the operational definitions before collecting data. Otherwise the baseline cannot be compared fairly with later results.
Exercise
A process has LSL = 50, USL = 60, mean = 58 and standard deviation = 1. Calculate Cp and Cpk, and explain what the difference tells you.
Show answer
Cp = (60 − 50) / (6 × 1) = 1.67. Cpk = min(60 − 58, 58 − 50) / (3 × 1) = 2 / 3 = 0.67. The spread is narrow enough to fit well inside the limits, but the mean sits close to the upper limit. Centering the process would raise Cpk toward Cp without needing to reduce variation.