Preparing tollgate evidence and checklists
This chapter assumes you know the five DMAIC phases, why tollgate reviews exist, and who attends them. It covers what goes into a tollgate package and how to check it before the meeting.
Evidence answers the exit question
Each phase ends with a question the reviewers must be able to answer "yes" to. Evidence is whatever lets them answer without taking your word for it.
- Define: Do we agree on the problem, the scope, and the goal?
- Measure: Do we trust the data, and do we know today's performance?
- Analyze: Have we verified the causes with data?
- Improve: Did a pilot show the solution works?
- Control: Will the gains hold after the team leaves?
A slide that says "we analyzed the data" is a claim. A stratified chart, a hypothesis test result, and a note on what was tested are evidence. Reviewers can challenge evidence, which is why they trust it more.
What each phase package contains
| Phase | Typical evidence | What the reviewer checks |
|---|---|---|
| Define | Signed charter, CTQ statements, SIPOC, stakeholder list | The problem statement has a measure, a baseline target, and a scope boundary |
| Measure | Operational definitions, MSA results, executed data collection plan, baseline DPMO or capability | The baseline comes from data the team showed to be reliable |
| Analyze | Stratified data, verified root causes with test results, ranked list of vital few Xs | Each cause is supported by data, not by a fishbone diagram alone |
| Improve | Solution selection matrix, pilot plan and results, risk review | The pilot result is compared with the baseline, using the same measure |
| Control | Control plan, updated procedures, monitoring charts, training records, signed handover | The process owner has accepted ownership |
Keep the package small. Put the one or two key charts on the slides and move supporting detail to an appendix that reviewers can open if they ask.
Build the checklist from the exit criteria
A tollgate checklist is a list of required items per phase. Write the items so each one can be answered "done" or "not done" with a document you can point to. "Data quality considered" is vague. "Measurement system assessed and acceptable" has a clear test and an artifact (the MSA result).
Good checklist items share three traits:
- They name a deliverable, not an activity ("Baseline performance calculated", not "work on baseline").
- They state the acceptance condition where one exists, such as the MSA being acceptable.
- They are tied to a phase, so you can reuse the list across projects and compare projects fairly.
Your organization may already have a standard checklist. Start from it, then add project-specific items, such as a regulatory sign-off, and record why you added them.
The checklist as code
Teams that track many projects sometimes keep checklists in a script or a tracker. The model is small: a list of required items, a set of completed items, and a decision.
MEASURE_TOLLGATE = [
"Operational definitions written for the Y and key Xs",
"Measurement system assessed and acceptable",
"Data collection plan executed",
"Baseline performance calculated",
"Goal in the charter confirmed or revised",
]
def review(checklist, completed):
missing = [item for item in checklist if item not in completed]
if not missing:
return "go", []
return "hold", missing
decision, gaps = review(MEASURE_TOLLGATE, set(MEASURE_TOLLGATE[:4]))
print(decision, gaps)With four of five items complete, this prints hold ['Goal in the charter confirmed or revised']. The function returns the list of gaps, so the team leaves the review knowing what to finish.
This model has limits. It treats all items as equal and ignores quality. A completed item with weak evidence still counts as done. The checklist is a screening step before the review, and the reviewers still judge the evidence.
Making the baseline number defensible
The baseline is the most scrutinized evidence at the Measure tollgate. Show how you got it. For a defect-based measure, state the defect count, the number of units, and the opportunities per unit.
from statistics import NormalDist
defects = 27
units = 500
opportunities_per_unit = 4
dpmo = defects / (units * opportunities_per_unit) * 1_000_000
# Long-term yield converted to a short-term sigma level using the conventional 1.5 sigma shift
yield_rate = 1 - dpmo / 1_000_000
sigma_level = NormalDist().inv_cdf(yield_rate) + 1.5
print(f"DPMO: {dpmo:.0f}")
print(f"Sigma level: {sigma_level:.2f}")This gives 13,500 DPMO, which is about 3.70 sigma. Put the inputs and the formula in the appendix. If a reviewer asks "what counts as an opportunity?", the answer should come from the operational definitions you wrote earlier. If the definition changed between data collection and the baseline calculation, the number cannot be trusted.
The preparation flow
Preparation works best as a loop that ends before the meeting, not inside it.
The dry run with a Black Belt or coach catches the issues reviewers would raise. Ask the coach to play the Champion and challenge each chart.
Handling gaps honestly
Sometimes an item cannot be finished. Perhaps a measurement system study needs a second shift of data that does not exist yet. Do not tick the box. Record the gap, its impact, and a plan with a date. This lets the reviewers choose a conditional go with a clear condition, which is better than discovering the gap later.
Common evidence errors
- Evidence from a different scope. The data covers one site, while the charter covers three.
- Missing units or time period on charts, so reviewers cannot compare with the baseline.
- Averages only. A mean that meets the goal can hide a wide spread or an unstable process, so show a run chart or control chart where it matters.
- Opinions presented as findings. "Operators said training is the cause" needs a verification step.
- A package sent the same morning. Send it early enough for reviewers to read it, typically a few days ahead.
Exercise
A team's Measure checklist shows every item as complete. At the review, the Champion asks how the baseline of 13,500 DPMO was produced, and the team cannot say how an "opportunity" was defined. What went wrong in preparation, and what should the team do now?
Show answer
The checklist was ticked without checking the evidence behind it. The item "Operational definitions written" was marked done, but the definition was not traceable to the baseline calculation. The team should state the gap, confirm or rewrite the definition of an opportunity, recalculate the baseline if the definition changed, and ask for a conditional go or hold until the revised baseline is shown. In future, add the inputs and the formula to the appendix and rehearse the review with a coach.