What a BOM is and why it drives cost
Prerequisites
Assume you understand basic garment parts and construction, such as seams, linings, and closures. You should also be comfortable with percentages and simple spreadsheet arithmetic. The examples use one garment style, one currency, and one production quantity.
The BOM as a product list
A bill of materials (BOM) is a structured list of everything needed to make one finished garment. It includes the main fabric, secondary fabrics, trims, labels, packaging, and sometimes processing items such as embroidery or washing.
A BOM answers the question: “What must we buy or use to produce this style?”
The tech pack describes how to make the garment. It contains measurements, construction instructions, artwork, and quality requirements. The BOM extracts the physical inputs from that information. The cost sheet then assigns prices to those inputs and adds labour and other costs.
A BOM is therefore both a production reference and a costing foundation. If an item is missing, the factory may not order it, or the cost sheet may understate the true cost.
A BOM’s basic structure
Each BOM line should identify an item, its unit of measure, the quantity needed, the supplier or specification, and the applicable price. Keep the unit consistent. Fabric may be priced per metre, while buttons may be priced per piece.
| Category | Example | Unit | Quantity per garment |
|---|---|---|---|
| Main fabric | Cotton twill | m | 1.40 |
| Trim | Metal zip | pc | 1 |
| Label | Main brand label | pc | 1 |
| Packaging | Polybag | pc | 1 |
The quantity is the amount consumed by one garment before any additional allowance. The BOM may also include size, colourway, supplier, minimum order quantity, currency, and revision number.
How the BOM connects to cost
The cost of a BOM line is:
line cost = quantity × (1 + wastage rate) × unit priceFor example, 1.40 metres of fabric with 5% wastage requires 1.47 metres to buy. The same logic applies to trims when defects, cutting loss, or supplier packing requirements create an allowance.
The following example calculates material cost and adds CMT. Cut-make-trim (CMT) is the factory charge for cutting, sewing, and finishing the garment.
bom = [
("Cotton twill", "m", 1.40, 0.05, 6.00),
("Pocketing", "m", 0.25, 0.03, 2.00),
("Zip", "pc", 1, 0.02, 0.40),
("Button", "pc", 1, 0.02, 0.15),
]
material_cost = 0.0
for item, unit, qty, wastage, price in bom:
gross_qty = qty * (1 + wastage)
line_cost = gross_qty * price
material_cost += line_cost
print(f"{item:<14} {gross_qty:6.3f} {unit:<2} x {price:5.2f} = {line_cost:6.3f}")
cmt = 4.50
fob = material_cost + cmt
print(f"Materials {material_cost:.2f} CMT {cmt:.2f} FOB {fob:.2f}")This produces material cost of about 9.90 and FOB cost of about 14.40. FOB means free on board. In this context, it is the price covering the garment and agreed factory costs up to the export point, before later freight, duty, and selling costs.
Common errors
Check these points before approving a cost:
- The BOM includes every component shown in the tech pack.
- Units match the supplier quotation. Do not mix metres, yards, kilograms, and pieces without conversion.
- Quantities describe one garment, not an entire order, unless the column says otherwise.
- Wastage is based on production evidence rather than an arbitrary percentage.
- Prices use the same currency and price basis.
- The revision of the BOM matches the sample or production version being costed.
A reliable BOM makes later landed-cost and price calculations traceable. When a price changes, you can identify whether the cause was consumption, wastage, supplier pricing, or labour.
Exercise
A jacket uses 2.00 metres of fabric at $8.00 per metre and has a 10% wastage allowance. What is the fabric cost per jacket before labour?
Show answer
Buy 2.20 metres, so the fabric cost is 2.20 × $8.00 = $17.60.