Sub topic 5
Adding Wastage and Allowances
Assume you understand garment parts, basic construction terms, the tech pack, and percentage calculations. This chapter focuses on converting the nominal quantity in a bill of materials (BOM) into the quantity a supplier or factory must actually buy.
Why nominal quantities are not enough
A BOM may say that one jacket needs 1.40 metres of outer fabric. Production usually needs more than 1.40 metres. Fabric can contain defects, cutting layouts leave unused spaces, and some materials are lost during handling or processing.
Wastage is the extra material expected to be lost during production. An allowance is an additional quantity added for a known reason, such as shrinkage or testing. Record the reason separately instead of hiding every adjustment in one large percentage.
A basic formula is:
gross quantity = nominal quantity × (1 + wastage rate) + fixed allowanceUse the same unit throughout the calculation. If fabric is priced per metre, calculate metres. If buttons are priced per piece, calculate pieces.
Separate the main types of adjustment
The correct rate depends on the material and the production process.
| Adjustment | Typical cause | How to model it |
|---|---|---|
| Cutting wastage | Marker gaps, curved edges, small offcuts | Percentage of fabric consumption |
| Defect allowance | Weaving, dyeing, or printing defects | Percentage, based on supplier history |
| Shrinkage allowance | Fabric becomes shorter or narrower after washing | Apply the tested shrinkage rate |
| Process allowance | Extra pieces needed for testing or setup | Fixed quantity or percentage |
| Replacement allowance | Buttons, labels, or trims lost during sewing | Small percentage or fixed pieces |
Do not automatically add every possible rate. For example, a tested fabric shrinkage rate may already be included in the approved consumption. Adding it again would overstate the requirement.
Calculate a material requirement
Suppose a style needs 1.40 metres of cotton twill per garment. The production plan uses a 5% wastage rate. The gross requirement is:
1.40 × (1 + 0.05) = 1.47 metresFor a 500-piece order, the requirement is 735 metres before considering supplier minimum order quantities.
Different BOM lines can use different rates. Fabric may need 5% cutting wastage, while a zip may need only 2% replacement allowance. A fixed allowance is useful when the quantity does not scale exactly with the base quantity.
# Each line: item, unit, nominal quantity, wastage rate, fixed allowance
bom = [
("Cotton twill", "m", 1.40, 0.05, 0.00),
("Pocketing", "m", 0.25, 0.03, 0.00),
("Zip", "pc", 1.00, 0.02, 0.00),
("Button", "pc", 1.00, 0.00, 2.00), # two spare buttons per order
]
for item, unit, nominal, wastage, fixed in bom:
gross_per_garment = nominal * (1 + wastage)
print(f"{item}: {gross_per_garment:.3f} {unit} per garment")
order_quantity = 500
fabric_nominal = 1.40
fabric_wastage = 0.05
fabric_to_buy = order_quantity * fabric_nominal * (1 + fabric_wastage)
print(f"Fabric to buy: {fabric_to_buy:.1f} m")The button allowance in this example is an order-level quantity, not two extra buttons for every garment. Label the calculation clearly so production does not interpret it incorrectly.
Validate the rate before costing
Use evidence whenever possible:
- Compare the proposed rate with consumption from a marker.
- Check the supplier's defect and shrinkage reports.
- Review cutting-room records from a previous order.
- Confirm whether the rate applies to all colourways and fabric widths.
- Record the rate, source, date, and BOM revision.
A dark solid fabric, a large check, and a one-way print may require different cutting assumptions. A printed fabric may also need matching at seams, which increases effective consumption even when the pattern pieces are unchanged.
Rounding belongs at the purchasing stage. For example, if a supplier sells fabric in whole rolls, round according to the supplier's roll size rather than rounding every garment's consumption.
Exercise
A shirt needs 1.80 m of fabric. Cutting wastage is 4%, and shrinkage is 3%. If both rates are independent and applied sequentially, how much fabric is needed per shirt before rounding?
Show answer
1.80 × 1.04 × 1.03 = 1.92744 m, or about 1.927 m per shirt. Document the sequence because applying 7% once gives a slightly different result.