Sub topic 7
CMT and Labour Costing
Assume you already understand garment parts, seams, closures, tech packs, percentages, and basic spreadsheet arithmetic. This chapter focuses on the factory work needed to turn cut materials into a finished garment and on how that work enters the cost sheet.
What CMT includes
CMT means cut, make, and trim. It is a production charge for factory work, separate from the fabric and component prices in the bill of materials.
- Cut: spreading fabric, placing markers, cutting panels, bundling parts, and recording cut quantities.
- Make: sewing and assembling the garment.
- Trim: trimming threads, pressing, finishing, inspecting, and sometimes packing.
The exact scope varies by supplier. One factory may include pressing and individual polybags in CMT. Another may quote them separately. Always record the quote scope before comparing factories.
A CMT quote can be:
- A price per garment.
- A price by operation.
- A labour-minute calculation.
- A bundle price for a production order.
The quote may also include factory overhead, such as supervision, equipment, rent, electricity, maintenance, and quality control. Do not add these costs again if they are already included.
Estimating labour from operations
A useful internal estimate starts with the standard allowed minute, or SAM. SAM is the expected time in minutes for a trained operator to complete an operation at the planned production method.
List the operations from the tech pack and sample, then estimate or measure their SAM values.
| Operation | SAM (minutes) | Labour rate per minute | Direct labour cost |
|---|---|---|---|
| Spreading and cutting | 5 | $0.16 | $0.80 |
| Sewing and assembly | 18 | $0.16 | $2.88 |
| Thread trimming and finishing | 4 | $0.16 | $0.64 |
| Inspection and pressing | 5 | $0.16 | $0.80 |
| Total | 32 | $0.16 | $5.12 |
The direct labour cost is:
total SAM × labour cost per minute
A labour rate of $0.16 per minute equals $9.60 per paid labour hour. The factory might calculate this rate from wages, paid hours, attendance, and expected production efficiency.
Production efficiency matters because operators are not productive for every paid minute. Meetings, machine changes, rework, breaks, and material delays reduce output. A factory may therefore adjust its rate or add an efficiency allowance.
operations = [
("Spreading and cutting", 5),
("Sewing and assembly", 18),
("Thread trimming and finishing", 4),
("Inspection and pressing", 5),
]
labour_rate_per_minute = 0.16
overhead_rate = 0.27 # factory overhead as a share of direct labour
direct_labour = 0.0
for name, sam in operations:
cost = sam * labour_rate_per_minute
direct_labour += cost
print(f"{name:<28} {sam:>2} min ${cost:>5.2f}")
factory_overhead = direct_labour * overhead_rate
cmt = direct_labour + factory_overhead
print(f"\nDirect labour: ${direct_labour:.2f}")
print(f"Factory overhead: ${factory_overhead:.2f}")
print(f"CMT estimate: ${cmt:.2f}")This example produces $5.12 of direct labour, $1.38 of factory overhead, and a CMT estimate of $6.50 per garment.
Connecting CMT to the cost sheet
The cost sheet should show what each amount includes. A simple FOB calculation is:
FOB cost = materials + CMT + included factory charges
For example, if materials cost $9.90 and CMT is $6.50, the FOB cost is $16.40. Freight, import duty, and the brand's overhead may be added later to calculate landed cost.
Check these items before approving the number:
- Is cutting included?
- Are pressing, inspection, and rework included?
- Are labels, buttons, and packaging supplied by the buyer or factory?
- Does the price assume a particular order quantity?
- Does a complex style need extra operations or special machines?
- Is the CMT price valid for every size and colourway?
Managing changes
A change to construction changes SAM and may change CMT. Adding a lining, changing a closure, or introducing many small panels can increase handling and sewing time. Record the old and new operation lists, the reason for the change, and the effective BOM or tech-pack revision.
Exercise
A style requires 40 SAM minutes. The labour rate is $0.15 per minute and factory overhead is 25% of direct labour. What is the estimated CMT cost?
Show answer
Direct labour is 40 × $0.15 = $6.00. Overhead is $6.00 × 0.25 = $1.50. Estimated CMT is $7.50.