Assembling the Garment Cost Sheet
Assume you understand garment components, basic construction, percentages, and spreadsheet arithmetic. You should also know how a style, tech pack, and sample move through development. This chapter shows how to turn a BOM and factory labour charge into an FOB cost.
What a cost sheet contains
A cost sheet records the cost of making one garment. It normally separates:
- Materials, such as fabric, pocketing, zippers, and buttons
- CMT, meaning cut, make, and trim labour
- Other factory charges, such as testing, embroidery, or special finishing
- FOB cost, meaning the price for the finished garment loaded for export
The cost sheet should use the same style number, size basis, colourway, currency, and revision as the BOM. Otherwise, the numbers may look precise while describing different products.
Build the material section
Start with each BOM line. For every item, record its unit, quantity per garment, wastage allowance, unit price, and extended cost.
The extended cost is:
quantity × (1 + wastage) × unit price
For example, 1.40 metres of fabric with 5% wastage requires 1.47 metres to buy. At $6.00 per metre, the line costs $8.82.
| BOM item | Buy quantity | Unit price | Extended cost |
|---|---|---|---|
| Cotton twill | 1.470 m | $6.00 | $8.820 |
| Pocketing | 0.258 m | $2.00 | $0.515 |
| Zip | 1.020 pc | $0.40 | $0.408 |
| Button | 1.020 pc | $0.15 | $0.153 |
Add the extended costs to get the material subtotal. In this example, the subtotal is $9.896, usually displayed as $9.90.
Keep calculation precision internally and round only the displayed values. Rounding every line first can create a small difference between the visible subtotal and the true total.
Add CMT and factory charges
CMT is the factory’s charge for cutting, sewing, and trimming the garment. It may be quoted as one amount per piece or separated into cutting, sewing, finishing, and packing labour.
Add any agreed charges that are not already included in CMT. Check for duplicated costs. For example, polybag packing might appear in both the packaging BOM and the factory’s finishing charge.
With $9.896 in materials and $4.50 in CMT:
FOB = materials + CMT
FOB = $9.896 + $4.50 = $14.396
The displayed FOB cost is $14.40 per garment.
bom = [
("Cotton twill", "m", 1.40, 0.05, 6.00),
("Pocketing", "m", 0.25, 0.03, 2.00),
("Zip", "pc", 1, 0.02, 0.40),
("Button", "pc", 1, 0.02, 0.15),
]
material_cost = 0.0
for item, unit, qty, wastage, price in bom:
gross_qty = qty * (1 + wastage)
line_cost = gross_qty * price
material_cost += line_cost
print(f"{item:<14} {gross_qty:6.3f} {unit:<2} x {price:5.2f} = {line_cost:6.3f}")
cmt = 4.50
fob = material_cost + cmt
print(f"Materials {material_cost:.2f} CMT {cmt:.2f} FOB {fob:.2f}")Review the cost before approval
A useful review compares the cost sheet with the approved tech pack and sample.
- Confirm that every BOM item has a supplier price and unit.
- Confirm that fabric consumption matches the marker or approved estimate.
- Check whether prices include dyeing, printing, finishing, or testing.
- Confirm the currency and exchange-rate date.
- Record the factory quotation date and BOM revision.
- Compare the total with the target cost before approving the purchase order.
The cost sheet is also a control document. If a zipper changes, update the BOM revision and the affected cost line. Do not overwrite the old approved version without recording the reason and effective date.
Exercise
A style has material costs of $11.25, CMT of $4.10, and a finishing charge of $0.35. What is its FOB cost?
Show answer
Add the three components: $11.25 + $4.10 + $0.35 = $15.70 per garment.