Sub topic 13
Target Costing and Cost Reduction
Assume you know how to read a garment BOM, estimate fabric consumption, calculate CMT, and assemble a landed cost. You should also be comfortable with percentages and basic spreadsheet arithmetic. This chapter uses those skills to decide whether a style can meet its planned price and how to reduce cost without damaging the product.
Start with a target cost
Target costing starts with the selling price and works backward. A buyer or brand may set a wholesale price and a required gross margin. The maximum acceptable landed cost is:
Target landed cost = Wholesale price × (1 − required margin)For example, a $30 wholesale price with a 50% gross margin allows a landed cost of:
$30 × (1 − 0.50) = $15If the current landed cost is $16.20, the style has a $1.20 cost gap. The team must remove at least $1.20 per garment or change the price, margin, or product specification.
A cost gap is more useful than a general instruction to “make it cheaper.” It gives design, sourcing, and production teams a measurable target.
Locate the cost gap
Break the gap into cost categories before changing the product. A $1.20 gap may come from fabric, trims, CMT, duty, or freight. Each category needs a different response.
First, check the BOM for errors:
- Is the fabric quantity based on the correct size range?
- Is wastage applied once, rather than twice?
- Are units consistent, such as metres versus yards?
- Are supplier prices current and quoted in the correct currency?
- Are freight, duty, and overhead assumptions still valid?
Then rank the largest costs. A small saving on a major fabric may be more valuable than eliminating a low-cost label.
Compare reduction levers
Every reduction changes the product or the business risk. Record the saving, the assumption behind it, and the approval needed.
| Cost lever | Possible action | Main risk or trade-off | Validation |
|---|---|---|---|
| Fabric consumption | Improve marker efficiency or remove unnecessary fullness | Fit, drape, or comfort may change | Re-marker and review the sample |
| Fabric price | Negotiate volume, compare mills, or revise construction | Lower performance, shade, or lead-time reliability | Test fabric and confirm supplier capacity |
| Trims | Standardise buttons, zips, or labels across styles | The design may lose a distinctive detail | Review appearance and function |
| CMT | Simplify seams or reduce operation count | Lower durability or slower operator learning | Make a pilot and inspect workmanship |
| Packaging | Reduce inserts or use a standard pack | Retail presentation or compliance may suffer | Confirm buyer and shipping requirements |
| Freight and duty | Consolidate shipments or change origin | Longer lead times or different duty treatment | Confirm landed quotations and customs rules |
A cost reduction is real only when it survives sampling and production. Do not count a saving based on a supplier promise until the revised price, specification, and minimum order quantity are documented.
Use a controlled calculation
The following example calculates the allowable cost and tests proposed savings. It treats margin as a percentage of wholesale price, not as a percentage added to cost.
wholesale_price = 30.00
required_margin = 0.50
current_landed_cost = 16.20
allowable_cost = wholesale_price * (1 - required_margin)
cost_gap = current_landed_cost - allowable_cost
savings = {
"marker improvement": 0.45,
"trim standardisation": 0.25,
"freight consolidation": 0.30,
}
total_savings = sum(savings.values())
revised_cost = current_landed_cost - total_savings
remaining_gap = revised_cost - allowable_cost
print(f"Allowable landed cost: ${allowable_cost:.2f}")
print(f"Current cost gap: ${cost_gap:.2f}")
print(f"Revised landed cost: ${revised_cost:.2f}")
print(f"Remaining gap: ${remaining_gap:.2f}")The proposed savings total $1.00, so the revised cost is $15.20. It still exceeds the $15.00 target by $0.20. The team must find another validated saving or make a commercial decision.
Make the decision explicit
For each proposed change, document:
- The old and new BOM or construction detail.
- The unit saving and expected annual volume.
- Any change to quality, fit, appearance, compliance, or lead time.
- The person who approved the change.
- The BOM and cost-sheet revision that contains it.
Target costing is a repeated review, not a one-time calculation. Recheck the result when the size range, colourway, supplier, order quantity, or shipping plan changes.
Exercise
A style has a $16.20 landed cost, a $30 wholesale price, and a required 50% gross margin. A validated trim change saves $0.25. Does the style meet target?
Show answer
No. The allowable landed cost is $15.00. After the saving, the cost is $15.95, so a further $0.95 saving is required.