Sub topic 2
Anatomy of a Garment BOM
A bill of materials (BOM) is the controlled list of everything needed to make one garment style. It connects the technical design to purchasing and costing. This chapter assumes you understand basic garment construction, can work with percentages, and have seen a style or tech pack.
The BOM answers a practical question: what must the factory buy, and how much of each item does one finished garment require? A tech pack describes how the garment should be made. The BOM identifies the physical inputs. The cost sheet then uses the BOM quantities and supplier prices to calculate material cost.
The structure of a BOM
A useful BOM normally has one row for each material or component. Do not combine unrelated items into a single row. For example, “buttons and labels” is too vague because those items have different suppliers, units, prices, and order requirements.
| Category | Example | Unit of measure | Quantity per garment |
|---|---|---|---|
| Main fabric | Cotton twill | metre | 1.40 |
| Pocketing | Polyester lining | metre | 0.25 |
| Closure | Metal zip | piece | 1 |
| Branding | Woven size label | piece | 1 |
| Packaging | Polybag | piece | 1 |
Common BOM fields include:
- Line number: A stable reference such as FAB-001 or TRM-004.
- Category: Fabric, lining, trim, label, packaging, or other component group.
- Description: A specific material description, such as “10 mm black elastic.”
- Specification: Details that affect function or appearance, including composition, width, weight, finish, colour, and construction.
- Supplier or source: The approved supplier, supplier code, or sourcing status.
- Unit of measure: The basis for purchasing and pricing, such as metre, kilogram, piece, set, or roll.
- Quantity per garment: The planned consumption before or after wastage, depending on the company’s convention.
- Wastage allowance: An additional percentage for cutting loss, defects, or process loss.
- Unit price: The supplier’s price in a named currency.
- Revision and approval status: The version that production should use.
Keep the unit consistent with the supplier quotation. If fabric is priced per kilogram but consumption is recorded in metres, add the conversion information or use a separate calculation. Otherwise, the cost sheet can appear precise while using incompatible units.
Grouping the garment components
The main fabric usually has the largest cost impact. Record its fibre content, fabric name, usable width, weight, finish, colour, and consumption. A fabric row may also reference a marker or cut plan because the marker affects how much fabric the style consumes.
Linings and interlinings should have separate rows. They may use different widths, prices, and suppliers. Interlining also needs an application method, such as fusible or sew-in, because that affects production requirements.
Trims include functional and decorative components:
- Zips, buttons, snaps, hooks, and elastic
- Thread, drawcords, cord ends, and tapes
- Buckles, rivets, patches, and decorative hardware
Labels need their own rows when they have different specifications. Include the main brand label, size label, care label, fibre-content label, and country-of-origin label where applicable.
Packaging can include a polybag, carton, tissue, hangtag, barcode sticker, carton label, and spare-button bag. Packaging is part of the product cost even though it is not sewn into the garment.
bom = [
{"code": "FAB-001", "category": "fabric", "item": "Cotton twill",
"unit": "m", "quantity": 1.40},
{"code": "TRM-001", "category": "closure", "item": "Metal zip",
"unit": "pc", "quantity": 1},
{"code": "LBL-001", "category": "label", "item": "Woven size label",
"unit": "pc", "quantity": 1},
{"code": "PKG-001", "category": "packaging", "item": "Polybag",
"unit": "pc", "quantity": 1},
]
for row in bom:
print(f"{row['code']}: {row['quantity']} {row['unit']} "
f"{row['item']} ({row['category']})")How the BOM relates to the tech pack
The tech pack provides the evidence for each BOM line. A pocket drawing supports the pocketing entry. The construction page supports the thread and closure entries. The label-placement page supports label quantities and locations. The packaging specification supports packing materials.
Use the BOM to check the tech pack for omissions. If the tech pack shows two chest snaps but the BOM lists one, production and costing will disagree.
Exercise
Exercise
A shirt BOM lists one row called “labels” with a quantity of three pieces. What should you check before approving it?
Show answer
Check whether the three pieces are different label types, such as brand, size, and care labels. If their specifications, suppliers, prices, or placement differ, record them as separate BOM rows.