Sub topic 6
Pricing Materials: Suppliers, MOQs and Currency
Assume you already understand garment parts, basic construction, percentages, and simple spreadsheet arithmetic. You should also know how a style, tech pack, and sample move through development. This chapter focuses on turning supplier quotations into usable BOM prices.
Read a supplier quotation correctly
A supplier quotation gives a price under specific conditions. Record those conditions with the BOM line instead of copying only the unit price.
Important fields include:
- Supplier and quotation date
- Material description, composition, width, weight, finish, and color
- Unit of measure, such as metre, kilogram, piece, or set
- Currency
- Price basis, such as EXW, FOB, or another agreed Incoterm
- Minimum order quantity, or MOQ
- Price breaks for larger quantities
- Lead time and payment terms
- Validity period of the quote
An MOQ is the smallest quantity the supplier accepts for an order. It can apply to fabric, color, print, trim, or a custom label. A fabric supplier might require 500 metres per color, while a button supplier might require 10,000 pieces per finish.
The MOQ may be larger than the number needed for the production order. That difference affects cash use, leftover stock, and the real cost of a style.
| BOM item | Quote unit | Price | MOQ | Main risk |
|---|---|---|---|---|
| Cotton twill | metre | USD 6.00 | 500 m per color | Leftover fabric |
| Custom zipper | piece | USD 0.42 | 2,000 pieces | Unused trim |
| Woven label | piece | USD 0.08 | 5,000 pieces | Design revision |
Compare prices on the same basis
Two quotes are comparable only when their specifications and price bases match. A USD 6.00 per metre quote for 150 cm fabric is not equivalent to USD 5.50 for 110 cm fabric. A lower price may require more consumption because the fabric is narrower.
Check whether the quote includes:
- Dyeing, printing, or finishing
- Testing and certification
- Packing
- Local transport
- Export documentation
- Freight to the destination
- Taxes or duties
EXW usually leaves more transport responsibility with the buyer. FOB generally includes delivery to the named export port, but it does not include international freight, import duty, or destination charges. Keep the price basis visible in the cost sheet so these charges are not counted twice or omitted.
Account for MOQ and price breaks
For a production order, first calculate the quantity required:
order quantity = quantity per garment × order units × (1 + wastage rate)
Then compare that quantity with the supplier's MOQ. If the required quantity is below the MOQ, record the purchase quantity separately from the consumed quantity.
For example, a style needs 180 metres of a fabric, including wastage, but the MOQ is 500 metres. The material consumed by the order costs 180 × price. The cash purchase is 500 × price. The remaining 320 metres are inventory, not automatically a loss. Allocate that stock to future styles only when its color, specification, and usable shelf life make that realistic.
required_m = 180
moq_m = 500
price_usd = 6.00
purchase_m = max(required_m, moq_m)
cash_cost = purchase_m * price_usd
consumed_cost = required_m * price_usd
leftover_m = purchase_m - required_m
print(f"Purchase: {purchase_m} m, cash cost: USD {cash_cost:.2f}")
print(f"Consumed: {required_m} m, allocated cost: USD {consumed_cost:.2f}")
print(f"Leftover inventory: {leftover_m} m")Do not spread the entire MOQ cost across one style unless the business cannot use the leftover stock. Show both the style allocation and the cash requirement.
Convert currency consistently
Choose one costing currency, often the buyer's reporting currency. Store the supplier currency, exchange rate, rate date, and conversion direction.
If the quote is USD 6.00 and the rate is 1 USD = 0.92 EUR:
EUR price = USD price × 0.92 = EUR 5.52
Use a planning rate for early costing and update it with the actual invoice rate when purchasing. A rate buffer can protect the margin, but it should be documented rather than hidden in the unit price.
Exercise
Exercise
A trim costs USD 0.40 per piece, has an MOQ of 2,000 pieces, and the style needs 1,200 pieces. What should the BOM record separately?
Show answer
Record 1,200 pieces as the style's expected consumption, 2,000 pieces as the purchase quantity, USD 800 as the MOQ cash requirement, and 800 pieces as potential leftover inventory.