Sub topic 11
Testing changes in small trials
This chapter assumes you have already found root causes with 5 Whys and a fishbone, and that you have a list of countermeasures. It also assumes you have a baseline for the process (lead time, cycle time, and similar measures). Here you will learn how to try those countermeasures on a small scale before you commit to them.
Why trial before you commit
A countermeasure is a hypothesis. It says: "If we change X, then measure Y will improve, because root cause Z goes away." A hypothesis can be wrong. Trials are how you find out cheaply.
Kaizen events fail in a few predictable ways when teams skip trials:
- The team rebuilds the whole process on paper, rolls it out on Thursday, and discovers a flaw in front of leadership.
- A change that looks good in the meeting room breaks on night shift, with a rare product, or with a customer who does not fit the usual pattern.
- The team cannot say whether the change helped, because it never compared results with the baseline.
A small trial limits the damage if the idea is wrong. It also produces evidence you can show at the report-out.
What counts as a small trial
A trial is a deliberate, short test of one change, with a defined scope and a way to measure the result. Keep it small along four dimensions:
- Volume. Run a handful of orders, parts, or cases, not a full day's work.
- Time. Run for minutes or hours, not weeks.
- Place. Use one workstation, one person, or one product family.
- Reversibility. You can go back to the old method within minutes.
Teams often call this a PDCA cycle, which stands for Plan, Do, Check, Act. You plan the test, run it, compare the result with what you expected, and then adopt, adjust, or drop the change.
Planning a trial
Write a short trial plan before you start. A plan on a flip chart is enough. It should answer these questions:
- What exactly is changing? Describe it so that two people would run it the same way.
- Which root cause does it address? This links the trial back to your fishbone or 5 Whys.
- What will you measure? Choose a measure that matches a charter goal, such as lead time or the number of status-inquiry calls.
- What result do you expect? Write the number down before you run the trial. Otherwise you will be tempted to call any result a success.
- Who runs it, and who observes? The person doing the work should not also be the only person timing it.
- What is the stop rule? Decide in advance what result, or what problem, ends the trial early.
Example: order-entry trial plan
Suppose the root cause analysis for the order-entry process found that orders wait because staff must search the shared inbox for missing information. The team proposes a required-fields order form. Here is a trial plan for it.
trial_id: T1
change: Customers submit orders through a form with required fields instead of free-text email
root_cause_addressed: Missing order information causes follow-up emails and waiting
scope:
where: One order-entry clerk, morning shift
volume: 10 orders
duration: 2 hours
measure: Time from order received to confirmation sent, per order
baseline: Median 4 hours
expected_result: Median under 2 hours
observer: Facilitator with a stopwatch and a tally sheet
stop_rule: Stop if 3 orders in a row cannot be completed from the form data
rollback: Return to the shared inbox methodNotice that the trial changes one thing, has a number to beat, and has a rollback. Those three features are what make it a trial and not an improvisation.
Running a trial
Run the trial where the work happens, not in the meeting room. This is the gemba, the Japanese word for "the real place." Real equipment, real materials, and real people reveal problems that a discussion cannot.
Follow these practices:
- Brief the people involved. Tell them what you are testing and that you are testing the method, not judging them.
- Use a simple data sheet. Record start time, end time, and any problems for each unit. A paper tally sheet works well.
- Observe without helping. If the observer fixes problems silently, the result will look better than the method really is. Write down each problem instead.
- Run several units. One unit tells you little because of normal variation. Aim for at least five to ten when the process allows it.
- Note the conditions. Record anything unusual, such as a system outage or a very large order.
Calculating the result
After the trial, compare the numbers with the baseline and the expected result. A small script can keep this honest, especially when you have several trials.
from statistics import median
baseline_median_minutes = 240
expected_median_minutes = 120
# Minutes from order received to confirmation, one value per order
trial_minutes = [95, 110, 150, 85, 130, 105, 200, 90, 115, 100]
trial_median = median(trial_minutes)
improvement = (baseline_median_minutes - trial_median) / baseline_median_minutes
print(f"Trial median: {trial_median} minutes")
print(f"Improvement over baseline: {improvement:.0%}")
print("Met expected result:", trial_median <= expected_median_minutes)This prints a trial median of 107.5 minutes, an improvement of 55%, and True for the expected result. The median is used here because the data contains an outlier (200 minutes), and one slow order should not hide the typical result.
Reading the results honestly
Ten orders in one morning do not prove a change works everywhere. Treat the trial as evidence, not as proof. Watch for these problems:
- The Hawthorne effect. People work differently when they know they are being watched. Performance may drop back later. This is one reason the 30-60-90 day follow-up exists.
- Cherry-picked units. If the clerk chose the easy orders, the result is biased. Choose the units by a rule, such as the next ten that arrive.
- Mixed changes. If you change the form and the staffing at the same time, you cannot tell which one helped.
- Different measures. If the baseline measured lead time from the first email and the trial measured from the form submission, the comparison is invalid. Use the same start and end points as the charter.
- Ignoring side effects. A change may speed up one step and slow another. Check the steps downstream of the change too.
| Trial outcome | What it tells you | Typical next step |
|---|---|---|
| Met or beat the expected result, no new problems | The change likely works at small scale | Repeat once, then adopt |
| Improved but fell short | The idea has merit but is incomplete | Adjust and run a second trial |
| No change | The root cause may be wrong, or the change does not address it | Revisit the root cause analysis |
| Got worse | The change creates a new problem | Stop, record why, and try another countermeasure |
A failed trial is a useful result. It cost a few hours and told you something true about the process.
Iterating within the week
An event week is short, so plan for two or three rounds of trials, not one. A common pattern is:
- Day 2 or 3: run first trials of the top countermeasures, one at a time or in parallel on separate parts of the process.
- Day 3 or 4: refine the ones that showed promise and run them again.
- Day 4: choose the winning method and move it into standard work.
When you run trials in parallel, make sure they do not touch the same step. Otherwise their effects mix together.
Keep a trial log so the report-out has a record. One line per trial is enough.
| Trial | Change | Result | Decision |
|---|---|---|---|
| T1 | Required-fields order form | Median 107.5 min vs 240 baseline | Adopt, with small wording changes |
| T2 | Auto-reply with order number | Calls dropped on 3 of 5 sample orders | Adjust, rerun |
| T3 | Batch confirmations every hour | Lead time worse for urgent orders | Drop |
Handling trials that cannot be run in full
Some changes are too risky or too slow to test live, such as a change to a regulated step or a rarely occurring case. Options include:
- Simulating the process with sample documents or a dummy order.
- Running the trial on a copy of the system in a test environment.
- Walking through the new method step by step with the people who do the work, timing each step.
- Testing only the part you can safely test, and listing what remains unproven.
Be honest in the report-out about what was tested live and what was simulated.
Edge cases and common errors
- Trial too big. Rolling out to the whole department "as a trial" is a launch. Keep a rollback and a small scope.
- No baseline for the measure. If you did not record the baseline, you cannot compare. Take a quick measurement of the old method alongside the trial.
- Ownership gaps. If the people who do the work did not design the change, they may quietly work around it. Involve them in the trial plan.
- Stopping at the first success. One good run can be luck. Repeat the winning trial at least once before standardizing.
Summary
Trials turn countermeasures from opinions into evidence. Plan each one with a single change, a measure, an expected result, and a stop rule. Run it at the real work location with an observer, record every unit, and compare with the baseline using the charter's definitions. Adopt what works, adjust what partly works, and drop what does not. The winning method then goes into standard work, which is the next chapter.
Exercise
Your team tests a new intake checklist with one clerk on 3 easy orders. Lead time drops from a median of 4 hours to 1 hour. A teammate wants to adopt it department-wide immediately. List three weaknesses in this trial and describe a better next trial.
Show answer
Weaknesses: (1) three units is too few to separate the change from normal variation; (2) the orders were easy, so the sample is biased and may hide the cases where the checklist fails; (3) a single clerk may be affected by being observed or by personal skill, so the result may not carry over to others. A better next trial: select the next 10 orders that arrive by a fixed rule, not by choice; run them with at least two clerks, including one on a different shift if possible; record start and end times using the same points as the baseline; note side effects such as extra work downstream; and compare the median with the written expected result before deciding to adopt.
Exercise
A trial plan says: "Change the order form and add a second reviewer. Expect things to get faster." Rewrite it so it is a testable plan.
Show answer
Split it into two trials, since changing both at once hides which change caused any effect. For the form trial: "Change: required-fields order form. Measure: median minutes from order received to confirmation. Scope: 10 orders, one clerk, 2 hours. Expected result: median under 120 minutes (baseline 240). Stop rule: stop if 3 orders in a row cannot be completed from the form data. Rollback: shared inbox method." Write a similar plan for the second-reviewer trial, with its own measure and expected number, and run the two on separate parts of the process or at different times.