Sub topic 3
TIMWOODS: the eight wastes at a glance
This chapter assumes you know the basic Lean idea of value (what a customer will pay for) and the terms muda, mura, and muri from earlier chapters. It gives you the working model of the eight wastes. Later chapters cover each waste in detail.
Why a checklist of wastes helps
Waste (muda) is activity that consumes resources without adding value the customer will pay for. In practice, people stop seeing waste in their own work because it has become routine. A named list gives you categories to look for, so you can ask "Is there any waiting here?" instead of "Is anything wrong?"
TIMWOODS is a memory aid for the eight categories. Each letter stands for one waste.
| Letter | Waste | Short definition |
|---|---|---|
| T | Transportation | Moving material or information farther or more often than needed |
| I | Inventory | Stock, or work in progress, that waits to be used |
| M | Motion | Unnecessary movement of people |
| W | Waiting | Idle people, machines, or work |
| O | Overproduction | Making more, or sooner, than the next step needs |
| O | Over-processing | More effort or quality than the customer values |
| D | Defects | Rework, scrap, and errors |
| S | Skills | Unused talent, knowledge, and ideas |
Older lists have seven wastes and leave out the final S. Many teams added it because ignoring people's ideas wastes a resource that is already paid for.
The three kinds of activity
Before you label something as waste, sort each step into one of three types.
- Value-added: the customer would pay for it, it changes the product or service, and it is done right the first time.
- Necessary non-value-added: the customer does not value it, but the process cannot yet work without it. Examples are legal compliance checks, safety inspections, and data backups.
- Pure waste: neither of the above. You can remove it now.
The TIMWOODS wastes describe the second and third types. The distinction affects what you do about them. You can often eliminate pure waste outright. Necessary non-value-added work usually needs a redesign, because removing it today would break something.
The eight wastes, one at a time
Each entry gives a manufacturing, office, and software example, so you can recognize the same waste in different settings.
Transportation
Moving items between places adds no value, and each move risks damage or loss.
- Manufacturing: parts travel across the plant between distant workstations.
- Office: a form is passed through five inboxes before it reaches the decision maker.
- Software: a large dataset is copied between systems or regions for each build.
Inventory
Inventory is any stock or work in progress (WIP) that is waiting. It ties up money and space, and it hides problems.
- Manufacturing: pallets of parts waiting between operations.
- Office: 300 unanswered emails or 80 unreviewed applications.
- Software: a backlog of finished but unreleased code, or a long queue of open pull requests.
Motion
Motion is movement of people that does not add value. Transportation concerns things, and motion concerns people.
- Manufacturing: an operator walks to a shelf for a tool used every minute.
- Office: searching shared drives for the current version of a file.
- Software: switching between five tools to complete one deployment.
Waiting
Waiting is time when people, machines, or work are idle because the previous step has not finished.
- Manufacturing: a machine stops until a changeover is done.
- Office: a quote waits 120 minutes for approval.
- Software: a build waits in a queue for a shared test environment.
Overproduction
Overproduction means making more than needed, or making it earlier than needed. Lean treats it as the most serious waste because it creates the others.
- Manufacturing: running a batch of 1,000 when the order is for 200.
- Office: producing a weekly report that nobody reads.
- Software: building features that no user asked for.
Over-processing
Over-processing is doing more work, or work to a higher standard, than the customer values.
- Manufacturing: polishing a surface that is hidden inside the product.
- Office: three signatures on a low-value purchase.
- Software: tuning performance far beyond the requirement, or collecting data fields that nothing uses.
Defects
A defect is any output that is not right the first time. It causes rework, scrap, or a customer complaint.
- Manufacturing: a part that fails inspection and is scrapped.
- Office: an invoice sent with the wrong address.
- Software: a bug that escapes to production and needs a hotfix.
Skills (unused talent)
This waste appears when you do not use people's abilities, ideas, and judgment. It includes poor task matching, no training, and ignoring suggestions.
- Manufacturing: a skilled machinist spends the shift moving boxes.
- Office: an analyst only copies numbers between spreadsheets.
- Software: a senior engineer is never asked about a design that they know will not scale.
How to read the list
The eight wastes overlap, and one problem can fit more than one category. A pile of unreviewed pull requests is inventory and also causes waiting. This is acceptable. The goal is to see the waste and remove it, not to classify it perfectly.
A useful grouping is by what is being wasted.
- Flow of things and information: Transportation, Inventory, Waiting.
- Work effort: Motion, Overproduction, Over-processing.
- Quality and people: Defects, Skills.
Common errors when using TIMWOODS
- Treating every step as waste. Necessary non-value-added work, such as a safety check, needs a redesign. Cutting it can create defects or risk.
- Blaming people. Waste usually comes from how the process is designed. Using the list to criticize individuals stops people from reporting waste.
- Confusing motion with transportation. Ask whether a person or a thing is moving.
- Stopping at the label. Naming a waste is only the first step. You still need to measure it and find its cause, which later chapters cover.
- Looking only at the factory floor. Offices and software teams have the same wastes, and they are harder to see because the work is invisible.
Seeing waste in numbers
You can see how much of a process is waste by measuring time. Here, process cycle efficiency (PCE) is the value-added time divided by the total lead time.
steps = [
{"name": "Receive request", "minutes": 5, "value_added": False},
{"name": "Wait in queue", "minutes": 240, "value_added": False},
{"name": "Prepare quote", "minutes": 30, "value_added": True},
{"name": "Wait for approval", "minutes": 120, "value_added": False},
{"name": "Send quote", "minutes": 5, "value_added": True},
]
lead_time = sum(s["minutes"] for s in steps)
value_added_time = sum(s["minutes"] for s in steps if s["value_added"])
pce = value_added_time / lead_time
print(f"Lead time: {lead_time} min")
print(f"Value-added time: {value_added_time} min")
print(f"Process cycle efficiency: {pce:.1%}")The output is a lead time of 400 minutes, 35 minutes of value-added time, and a PCE of 8.8%. Of the 400 minutes, 360 are two waits (240 and 120 minutes), so the largest waste is Waiting. The typical fix is to reduce the queue, not to make the quote preparer work faster. A later chapter covers these measures in more depth.
Exercise
A purchasing team receives requests by email. A clerk prints each one, walks it to a manager for a signature, scans it, and then enters the data by hand into a system. Orders over $50 need three signatures, and the average order is $30. Name at least three TIMWOODS wastes present and say which step shows each.
Show answer
Transportation or motion: printing and walking each request to the manager (the clerk, a person, is moving, so motion fits best; the paper moving is transportation). Over-processing: three signatures on orders whose average value is $30, which is more control than the value justifies. Waiting: the request sits until the manager is available to sign. Duplicate handling: scanning and retyping the data also fits over-processing, and typing errors would add defects. Any three with a correct justification are acceptable.