Sub topic 17
Keeping the gains: standard work, audits, and continuous improvement
This chapter assumes you can already name the eight wastes, run a 5 Whys analysis, and pick a countermeasure such as 5S, kanban, or poka-yoke. Here the question is what happens after the fix. Many improvements fade within months. People drift back to old habits, new staff are never taught the new way, and the process slowly returns to its old state. This chapter covers how to stop that.
Why gains fade
A fix that depends on people remembering it is fragile. Common causes of backsliding are:
- The new method lives only in the heads of the team that designed it.
- The fix adds a small burden for someone, and that person quietly skips it.
- Nobody checks, so deviations go unseen until the old problem returns.
- Demand rises, the team is under pressure, and shortcuts feel justified.
- A new manager or new hire arrives who was never told why the change was made.
Lean treats this as a process problem, not a discipline problem. If the improved method is easy to forget, the system around it is weak. The tools below make the new method the default way of working.
Standard work
Standard work is the current best-known way to do a task, written down so that everyone does it the same way. It is not a fixed rule for all time. It is the baseline you improve from. Without a baseline, you cannot tell whether a change helped.
A useful standard work document usually has three parts:
- Takt time: the pace of customer demand, calculated as available working time divided by customer demand. It sets how fast the work must flow.
- Work sequence: the exact steps, in order, with the key points that affect safety, quality, or timing.
- Standard inventory: the minimum work in progress needed at each step so the process can run smoothly.
Notice that the third part connects directly to Little's Law. If you cap the work in progress, you cap lead time.
Good standard work is written by the people who do the job, with photos or short videos rather than long text. It states the reason for each key point. A step that says "check the label" is weaker than one that says "check the label against the order, because mismatches caused 40% of last quarter's returns."
Standard work in office and software settings
Standard work is not only for factories. Examples include:
- A quote checklist that lists the required fields, so quotes are not sent back for missing data (defects).
- A definition of done for software tickets, covering tests, review, and documentation.
- A limit on work in progress on a kanban board, such as three active items per person.
- A runbook for a recurring operational task.
Making the change visible
People follow standards more reliably when deviations are obvious. Visual management puts the standard and the current status where the work happens. Examples are marked floor locations (5S), kanban cards showing the inventory limit, a board showing which tickets are blocked, and an andon signal that anyone can trigger when something is wrong.
The goal is that a person walking past can tell within a few seconds whether the process is normal or abnormal. If it takes a report to find out, the problem will be found late.
Auditing the standard
An audit checks whether the standard is being followed. In Lean, audits are frequent, short, and focused on the process, not on blaming people. A layered process audit is a common pattern, where different levels of the organization check at different frequencies.
| Level | Typical frequency | What they check |
|---|---|---|
| Team leader | Daily | Is the standard followed at each station or in each queue? |
| Supervisor or manager | Weekly | Are the team leader checks happening, and are open problems being closed? |
| Senior leader | Monthly | Are results holding, and do the standards still match reality? |
A good audit asks two kinds of question. The first is "Is the standard followed?" If not, ask why. The second is "Is the standard still right?" If people cannot follow it because it is impractical, the standard needs to change, not the people.
What to measure
Audit results alone say little. Pair them with the process measures you used to find the waste in the first place. For the quote process from the earlier chapter on metrics, you might track lead time, process cycle efficiency, and the number of quotes returned for correction. The code below computes process cycle efficiency for each week and flags when it falls below the target set after the improvement.
weekly_results = [
{"week": 1, "lead_time_min": 160, "value_added_min": 35},
{"week": 2, "lead_time_min": 170, "value_added_min": 35},
{"week": 3, "lead_time_min": 210, "value_added_min": 35},
{"week": 4, "lead_time_min": 320, "value_added_min": 35},
]
TARGET_PCE = 0.18 # agreed after the improvement
for row in weekly_results:
pce = row["value_added_min"] / row["lead_time_min"]
status = "OK" if pce >= TARGET_PCE else "BELOW TARGET - investigate"
print(f"Week {row['week']}: PCE {pce:.1%} {status}")Weeks 1 and 2 hold above 18%. Week 3 falls to 16.7% and week 4 to 10.9%. A trend like this is an early warning. It lets you start a 5 Whys before the process is back to its original 8.8%.
Reaction plans
A measure is useful only if someone acts when it moves. For each key measure, agree on a reaction plan in advance. It answers three questions: what counts as abnormal, who responds, and what they do first. For example, "If PCE drops below 18% for two weeks, the process owner runs a 5 Whys with the team within three days and reports at the weekly review."
Continuous improvement
Holding the gain is the floor, not the ceiling. Once a standard is stable, the next improvement starts from it. This cycle is often drawn as PDCA (Plan, Do, Check, Act), and in Lean it is also called kaizen, meaning small, continuous change by the people who do the work.
Two kinds of change flow through the loop. A deviation means the standard was not followed or was not workable, so you find out why and correct either the practice or the document. A new improvement means the team found a better way, so you test it and, if it works, rewrite the standard.
Use the wastes as a checklist
Each review is a chance to look again through the TIMWOODS lens. After the first round of improvement, the largest waste is often replaced by another that was previously hidden. Cutting inventory may expose waiting. Fixing defects may reveal over-processing, where extra checks were added to catch the errors that no longer occur. Walk the process again and ask where the wastes are now.
Involve the people
The eighth waste, unused talent, matters most here. Improvements stick when the people doing the work helped design them. Practical ways to involve them include:
- Short daily huddles at the board to raise problems.
- A simple route for suggestions, with a reply within a few days.
- Rotating who leads the audit.
- Cross-training so more people can do and improve each step.
If suggestions vanish without response, people stop making them, and the improvement system itself becomes a source of waste.
Common errors
- Writing the standard once and filing it. A standard nobody reads or updates becomes fiction.
- Audits that only look for blame. People then hide problems, and you lose the data you need.
- No owner. Every process and standard needs a named person responsible for it.
- Measuring only the result. A result can hold for a while while the practice behind it decays. Check both.
- Declaring victory at the first good week. Wait for a stable trend over several weeks before closing the project.
- Training only the original team. Include new hires and people from adjacent teams who touch the process.
A sustaining plan
Before you close an improvement, write down the following:
- The new standard work and where it is stored.
- The measures and targets, and who reviews them.
- The audit schedule and who performs each level.
- The reaction plan for abnormal results.
- The training plan for new staff.
- The date of the first review after the project closes, for example 30 and 90 days later.
Exercise
A team cut the quote process lead time from 400 to 160 minutes and set a PCE target of 18%. Two months later, lead time is 300 minutes with the same 35 minutes of value-added time. Calculate the current PCE, say whether it is below target, and describe the first two actions the process owner should take.
Show answer
PCE is 35 / 300 = 11.7%, which is below the 18% target (and near the original 8.8%). First, trigger the reaction plan and run a 5 Whys with the team to find why lead time grew, for example whether the approval queue limit was dropped or staff were not trained. Second, check the audit records and the standard work to see whether the standard is being followed, and correct the practice or the standard accordingly.
Exercise
An audit finds that operators routinely skip step 4 of a standard work sheet. Give one reason to change the standard and one reason to retrain, and say what question decides between them.
Show answer
Change the standard if step 4 is impractical, redundant, or adds no value, for example it requires a tool that is not at the station. Retrain if step 4 protects quality or safety and people skip it because they do not know why it matters. The deciding question is "Why do people skip it?", answered with a 5 Whys and by asking the operators.