Sub topic 6
Motion: Unnecessary Movement of People
This chapter assumes you know the Lean definition of value and waste, the three Ms (muda, mura, muri), and the TIMWOODS list from earlier chapters. It also assumes you can read simple time figures. Here you will learn what counts as motion waste, how to tell it apart from transportation, how to find and measure it, and how to remove it without creating new problems.
What motion waste is
Motion is any movement of people that does not add value for the customer. It includes walking, reaching, bending, searching, clicking, scrolling and switching between tools. The movement may be physical or digital.
Motion is easy to confuse with transportation, so use this rule:
- Motion is about people moving or moving their own body or attention.
- Transportation is about the work item, material or information moving from place to place.
A technician walking to a far cabinet for a torque wrench is motion. A pallet carried by forklift to the next building is transportation. Both can occur in the same step, and each has its own fix.
Motion is also different from effort. A worker who lifts a heavy part is doing necessary work if the lift transforms the product. The same worker walking 20 metres to fetch the part is doing motion waste. The test is whether the movement changes the product or service in a way the customer values.
Motion in three settings
| Setting | Typical motion waste | What it looks like |
|---|---|---|
| Manufacturing | Walking to tool cribs, reaching across a bench, bending to low bins, searching for fixtures | Operator leaves the station several times per cycle |
| Office | Walking to a shared printer, searching for files, hand-carrying forms for signatures | Staff spend minutes per task looking for the current version of a document |
| Software | Switching between tools, retyping data between systems, hunting for credentials, waiting on manual environment setup | A developer opens five tabs and three consoles to release one change |
The pattern is the same in all three. The person spends time getting ready to work, instead of working.
Why it matters
Motion waste rarely looks dramatic. A walk of 30 seconds is trivial once. It becomes significant when it repeats. If an operator makes 12 extra trips per hour and each takes 30 seconds, that is 6 minutes per hour, or 10% of the hour. Across a 7.5-hour shift, it is 45 minutes.
Motion also has effects beyond time:
- Ergonomic strain. Repeated reaching, twisting and bending contribute to injury and fatigue.
- Quality risk. Searching for the right tool or document raises the chance of using the wrong one.
- Variation. People find different routes and habits, so cycle time varies from person to person.
- Mental load. Context switching in digital work breaks concentration and slows recovery after each interruption.
Finding motion waste
Motion hides in plain sight because people have adapted to it. Three methods help.
Observe in place
Go to the place where work happens (the gemba) and watch a full cycle. Do not ask people to describe the work. Watch what they do. Note every time a person leaves their station, reaches beyond a comfortable range, or stops to look for something.
Draw a spaghetti diagram
A spaghetti diagram is a floor plan with a line tracing the path a person takes during one cycle. Tangled lines show repeated trips and crossing paths. For digital work, the equivalent is a list or screen recording of the applications and windows visited in order.
Time the movement
Record how long each non-working movement takes. Sum them per cycle and compare against total cycle time. This gives the share of the cycle spent on motion and helps you rank where to start.
The following script turns a log of timed observations into a ranked list.
observations = [
{"activity": "Walk to tool crib", "seconds": 40, "per_cycle": 2},
{"activity": "Search for fixture", "seconds": 25, "per_cycle": 1},
{"activity": "Reach across bench", "seconds": 6, "per_cycle": 8},
{"activity": "Walk to printer", "seconds": 50, "per_cycle": 1},
]
cycle_seconds = 420
rows = []
for o in observations:
total = o["seconds"] * o["per_cycle"]
rows.append((o["activity"], total))
rows.sort(key=lambda r: r[1], reverse=True)
motion_total = sum(t for _, t in rows)
for name, total in rows:
print(f"{name}: {total} s per cycle")
print(f"Motion per cycle: {motion_total} s")
print(f"Share of cycle: {motion_total / cycle_seconds:.1%}")With these numbers the motion total is 203 seconds, which is 48.3% of a 420-second cycle. The tool crib walk is the largest item at 80 seconds per cycle, so it is the first target.
A diagram of the cycle
The flow below shows how a cycle with motion waste differs from one where the work is brought to the person.
Removing motion waste
The usual order is to eliminate the movement, then reduce it, then make what remains easier.
- Bring the work to the person. Place frequently used tools, parts and documents at the point of use.
- Organise the space with 5S. Sort out what is not needed, set a fixed place for each item, shine (clean and inspect), standardise the layout, and sustain the habit. Shadow boards, marked locations and labelled bins make a missing item obvious at once.
- Arrange by frequency. Put the most-used items within easy reach and the rarely used ones farther away.
- Re-layout the process. Place sequential steps next to each other, often in a U-shaped cell, so the operator moves a short distance between them.
- Cut digital motion. Integrate systems, remove double entry, use templates and automation, and keep one source of truth for each document.
- Apply ergonomic principles. Keep items between waist and shoulder height and limit twisting.
Edge cases and common errors
- Treating all walking as waste. Some movement is necessary, such as moving between process stages that must be separate. Reduce it, but do not assume it can reach zero.
- Confusing motion with transportation. If you move the material, you may fix transportation but leave the operator walking to fetch it, or the reverse.
- Speeding people up instead of fixing the layout. Asking workers to walk faster treats the symptom and adds muri, or overburden. Change the system instead.
- Moving waste around. Placing every tool at one station can crowd the space and cause reaching and bending. Test the new layout with the operator.
- Ignoring digital motion. Teams often fix the physical workplace and leave a developer or clerk switching among many screens.
- Cutting useful movement. Short breaks, stretching, and talking to colleagues can protect health and collaboration. Remove waste, not people's wellbeing.
- Skipping the operator. The person doing the job knows which reach hurts and which search wastes time. Involve them in the redesign; otherwise the new layout may fail and old habits return.
Link to other wastes
Motion often points to deeper causes. Searching for tools can reveal disorganised inventory. Walking to an approval station can reveal a waiting problem. Frequent trips to fetch missing parts can reveal an overproduction or supply issue upstream. Treat motion as a clue and trace it back with the 5 Whys, covered in a later chapter.
Summary
Motion is the movement of people that adds no value. Find it by watching the work, mapping paths and timing the movement. Fix it by moving the work and tools to the person, organising the space, and reducing digital switching, while checking that the change does not simply shift the waste elsewhere.
Exercise
An assembler makes 10 trips per hour to a parts shelf 15 metres away. Each round trip takes 45 seconds. A redesign puts the parts in a bin at the station, which removes 8 of the 10 trips. How many minutes per 8-hour shift does this save? Also, is a forklift bringing the parts to the shelf motion or transportation?
Show answer
Trips removed per hour: 8. Time saved per hour: 8 x 45 s = 360 s = 6 minutes. Over 8 hours: 48 minutes per shift. The forklift moving the parts is transportation, because the material moves. The assembler's walk to the shelf is motion, because the person moves.
Exercise
A team lead says, "Our people walk to the printer all day, so let's tell them to walk faster and take shorter breaks." Give two reasons this is a poor response and name one better action.
Show answer
First, it treats the symptom and adds overburden (muri) instead of removing the cause. Second, cutting breaks can harm health and quality. Better action: reduce the need for printing by digitising the documents, or place a printer near the work area. Observing a full cycle first, with a spaghetti diagram, would show how often the trips occur.