Sub topic 9
Standard Work and Documentation
This chapter covers how the Control phase turns an improved method into written, shared standard work. It assumes you know the DMAIC phases, can read a control chart, and have seen a control plan like the one in the earlier chapter on control plan structure.
Why standard work matters in Control
An improvement lives in people's heads until someone writes it down. If the new method is not documented, each operator slowly goes back to the way they learned the job. Different shifts do the work in different ways. Variation returns, and the gains erode.
Standard work is the current best-known method for doing a task, written clearly enough that any trained person can follow it and get the same result. It is not a rigid rule for all time. It is the baseline that everyone follows today, and the baseline you improve from tomorrow.
Standard work does three jobs in a Control phase:
- It fixes the improved method as the one official way to do the work.
- It gives trainers and auditors something concrete to teach and check against.
- It gives the process owner a reference when the process drifts and someone asks, "What is supposed to happen here?"
In the concept graph for this tutorial, standard work sits between the control plan and training. The control plan says what to watch. Standard work says how to do the work. Training then passes the standard work to the people who run the process.
What goes into standard work
Lean uses three core elements to describe standard work. Write down each one for every task you document.
| Element | What it states | Example (invoice approval) |
|---|---|---|
| Takt or target time | The pace the customer demand requires | One invoice every 6 minutes, to meet the 3-day approval limit |
| Work sequence | The ordered steps, with who does each | 1. Match invoice to purchase order. 2. Check amount against approval limit. 3. Route to approver. |
| Standard inventory | The materials, inputs, or work in progress allowed at any point | No more than 20 invoices waiting at the approval step |
For office and service processes, the work sequence is the most important element. Takt time and standard inventory still apply, but you may express them as service levels and queue limits.
Key points inside each step
A step list alone is not enough. For each step, add the details that decide whether the result is good:
- Key points: the things that make the step succeed, such as "confirm the purchase order number matches before routing."
- Safety or quality points: what could go wrong and how to avoid it.
- Reasons: a short explanation of why the step is done this way. People follow a step more reliably when they understand its purpose.
Keep each step to one action. "Review and approve" is two actions and hides a decision. Split it into "Review the invoice against the purchase order" and "Approve or reject in the workflow system."
Types of process documents
Teams often produce too many documents or the wrong kind. Choose the lightest format that does the job.
| Document | Best for | Typical length |
|---|---|---|
| Process map | Showing the flow and handoffs across roles | One page |
| Standard operating procedure (SOP) | Describing a full process with scope, roles, and rules | Two to five pages |
| Work instruction | Showing exactly how to do one task | One page, often with photos or screenshots |
| Checklist | Making sure steps are not missed | Half a page |
| Visual aid or job aid | Giving a quick reference at the point of work | A single image or card |
A common pattern is one SOP for the process, with a few work instructions beneath it for the tasks where errors matter most. Do not write a work instruction for a task that is obvious and low risk.
Linking documents to the control plan
Documents should connect to the control plan, so a reader can move from one to the other without guessing. Each controlled characteristic in the control plan should point to the document that explains how to do the related work.
You can add a reference field to the control plan row. This extends the example from the control plan chapter.
control_plan:
process: Invoice approval
owner: Accounts Payable Manager
items:
- characteristic: Approval cycle time (days)
specification: "<= 3 days"
measurement_method: Workflow system timestamp report
sample: All invoices
frequency: Weekly
control_method: Individuals control chart
reaction_plan: "If a point is outside the limits, the owner reviews the cause within 2 working days and logs the action."
responsible: Team lead
standard_work_ref: SOP-AP-014 v3, section 4 (Routing and approval)The reference includes a version number. That detail matters, as the next section explains.
Document control
A document that cannot be trusted is worse than no document. Document control is the set of rules that keep every copy current, approved, and easy to find.
At a minimum, each controlled document needs:
- A unique identifier, such as SOP-AP-014.
- A version number and an effective date.
- A named author and a named approver. The approver is normally the process owner.
- A single storage location that everyone uses.
- A change history showing what changed, when, and why.
- A review date, so the document is checked on a schedule.
The most common failure is several copies in circulation: a printed version at the desk, an old one in an email, and a newer one on a shared drive. When the team publishes a new version, remove or clearly mark the old ones as obsolete.
Writing documents people will use
Documents fail because people do not read them, not because they are missing. Write for the person doing the work, at the moment they do it.
- Use short sentences and active verbs. Write "Check the amount," not "The amount should be checked."
- Use the words the team uses. Take terms from the people who do the work, not from the project team.
- Show, do not only tell. A screenshot with the correct field highlighted removes more errors than a paragraph.
- Place the document where the work happens. A procedure in a folder nobody opens does not control anything.
- Keep it short. If a work instruction runs past one page, split the task or cut the detail that does not affect the result.
Involve the operators in writing and testing. They know the exceptions that a project team may miss. They are also more likely to follow a method they helped shape.
Testing the document before release
Before you publish, test the document. Ask someone who did not help write it, and who has the right basic skills, to perform the task using only the document. Watch without helping.
Record every place where they hesitate, ask a question, or do something different from what you intended. Each one is a defect in the document. Fix these, then test again with a different person.
This test also checks that the standard work reproduces the improved result. If a new person follows the document and the cycle time returns to its old level, the document is missing something that the experienced team members do without thinking.
Handling exceptions
No procedure covers every case. Decide in advance what happens when the situation does not fit the standard.
- List the known exceptions in the document, with the action for each. For example, "If the purchase order is missing, route to Procurement and flag the invoice."
- State who can authorize a deviation, and how it is recorded.
- Treat repeated exceptions as a signal. If the same exception happens often, it is part of the process and belongs in the standard, or it points to a cause worth fixing.
How standard work changes over time
Standard work is stable but not frozen. When someone finds a better method, the change goes through a controlled path, so that improvement does not turn back into drift.
The key rule is that a change takes effect for everyone at the same time, after training. An individual who quietly changes their own method creates the variation that standard work is meant to remove.
Common errors
- Documenting the intended process instead of the real one. Observe the work, then write down what happens.
- Writing documents after the project ends, when the team has moved on. Finish drafts before handover.
- Writing at the wrong level of detail. Too little leaves gaps. Too much makes the document too long to read.
- Skipping the approval and version details. Without them, nobody knows which copy is current.
- Treating the document as the control. A document only helps if people are trained on it and audits check that they follow it. These are covered in the next chapters.
Exercises
Exercise
A team publishes a new version of an invoice-routing procedure. Two weeks later an audit finds that one desk still follows the old method, using a printed copy. Name two document-control failures that likely caused this and one fix for each.
Show answer
First, the old version was not retired when the new one took effect, so a printed copy stayed in use. The fix is to collect or mark obsolete all old copies on the effective date. Second, there was no single storage location or clear version marking, so staff could not tell which copy was current. The fix is to keep one controlled location and show the version number and effective date on every page. A training gap is also possible: the desk may not have been included in the training on the new method.
Exercise
Rewrite this step so that it contains one action and includes a key point: "Review and approve the invoice."
Show answer
Split it into two steps. Step 1: "Review the invoice against the purchase order. Key point: confirm that the purchase order number and amount match." Step 2: "Approve or reject the invoice in the workflow system. Key point: record the reason for any rejection." Each step now has a single action, and the decision point is visible.
Exercise
A new employee follows the written procedure exactly, yet the approval cycle time is 5 days instead of the target 3 days. What does this tell you about the document, and what should you do?
Show answer
The document is missing something that experienced staff do without thinking, or the documented method does not match the improved method. Observe an experienced operator, compare what they do with the written steps, and add the missing steps or key points. Then test the revised document with another new person and check that the cycle time meets the 3-day target.