Sub topic 3
Deciding what needs to be controlled
The Control phase cannot monitor everything, and a plan that tries to will be ignored within a few months. This chapter covers how to choose the characteristics that go into the control plan, how to justify each choice, and how to avoid the common selection errors.
Prerequisites
This chapter assumes you can do the following:
- You know the DMAIC phases and where Control fits after Improve.
- You can tell common-cause variation from special-cause variation.
- You can name the critical-to-quality (CTQ) characteristics of a process and its main metrics.
- You can read a run chart or control chart.
The selection problem
A controlled characteristic is a measurable feature of the process that someone checks routinely and acts on when it goes wrong. Each one costs effort: someone measures it, someone reviews it, and someone reacts to it. If you control too little, gains erode unnoticed. If you control too much, people stop looking at the data, and the one signal that matters gets lost among many that do not.
The goal is the smallest set of characteristics that protects the improvement and the customer. Every item you keep should be able to answer two questions: "What harm does this prevent?" and "Who will act on it?"
Where candidates come from
Do not start from a blank page. The earlier DMAIC phases have already produced most of the candidates.
- CTQs from Define. Each CTQ the customer cares about is a candidate. These are the outputs, often written as Y.
- Vital few inputs from Analyze. Root causes confirmed by data, such as regression, hypothesis tests or designed experiments, are the inputs (X) that drive the Y. They are the strongest candidates because you have evidence they matter.
- Changes made in Improve. Every new step, setting, rule or tool is a candidate. A change nobody controls is the one most likely to be undone.
- Failure modes from FMEA. A failure mode and effects analysis (FMEA) ranks the ways a process can fail. Items with a high risk priority number (RPN) after the improvement still need controls.
- Process map and cause-and-effect work. Handoffs, approvals and manual entry points often hide risks that the statistical work did not cover.
Output and input characteristics
Controlling only the output tells you that something went wrong after it has already happened. Controlling the input or process characteristic that drives the output lets you act earlier.
| Type | Example | When you learn of a problem | Typical control |
|---|---|---|---|
| Output (Y) | Approval cycle time in days | After the invoice is late | Control chart on cycle time |
| Process (X) | Approver backlog per person | Before invoices become late | Daily count, alert threshold |
| Input (X) | Purchase order number present at entry | At the point of error | Mandatory field, mistake-proofing |
A good control plan usually holds a few outputs, which prove the customer is served, and several inputs, which warn you early. Prefer the input when you have evidence it drives the output. Keep the output as well, because it confirms that the input controls are working.
Screening criteria
For each candidate, ask the following questions. A candidate that fails every one is a poor choice.
- Customer or business impact. If this characteristic drifts, how bad is the effect on a CTQ, on cost, or on safety and compliance?
- Variability or instability. Did this characteristic vary a lot before the improvement? Is it likely to vary again?
- Detectability. If it drifts, would you notice quickly without a specific check? Hard-to-detect problems deserve more control.
- Measurability. Can you measure it reliably and at a reasonable cost? A characteristic with no usable measurement can only be controlled by designing the problem out, for example with mistake-proofing.
- Actionability. Can the owner do something about it? A signal that nobody can act on is noise.
- Evidence. Is there data linking it to the outcome, or is it only a belief?
The first three are the same dimensions that an FMEA scores. That makes a simple scoring approach practical.
A worked scoring example
Suppose the team improved invoice approval. The candidates are listed below, and each one is scored from 1 to 10 for impact, likelihood of variation, and difficulty of detection (10 means hardest to detect). The score is the product of the three numbers, as in an FMEA RPN. The threshold of 100 is a team choice, not a standard.
candidates = [
{"name": "Approval cycle time", "impact": 9, "variation": 6, "detection_difficulty": 3},
{"name": "PO number present at entry", "impact": 8, "variation": 5, "detection_difficulty": 7},
{"name": "Approver backlog per person", "impact": 6, "variation": 6, "detection_difficulty": 4},
{"name": "Vendor bank detail change verified", "impact": 10, "variation": 3, "detection_difficulty": 8},
{"name": "Office temperature", "impact": 2, "variation": 2, "detection_difficulty": 2},
]
THRESHOLD = 100
for c in candidates:
c["score"] = c["impact"] * c["variation"] * c["detection_difficulty"]
for c in sorted(candidates, key=lambda c: c["score"], reverse=True):
decision = "CONTROL" if c["score"] >= THRESHOLD else "skip"
print(f"{c['score']:>4} {decision:<8} {c['name']}")Running it prints:
280 CONTROL PO number present at entry
240 CONTROL Vendor bank detail change verified
162 CONTROL Approval cycle time
144 CONTROL Approver backlog per person
8 skip Office temperatureThe score only supports a decision and does not replace judgment. The bank detail check has a lower score than the PO number, but a failure there means fraud. Many teams therefore apply a rule that any item with severity 9 or 10 is controlled regardless of the total score.
Deciding how to control each item
Once you have chosen what to control, the next decision is the kind of control. This ordering is usually the most durable:
- Eliminate the cause by changing the process so the problem cannot occur.
- Prevent the error with mistake-proofing, such as a mandatory field or a system block.
- Detect the error early with an automatic check or a review at the point of work.
- Monitor the result with a chart or report, and react when it drifts.
Monitoring appears last because it depends on people reading data and acting, which is the weakest link over time. A characteristic that can be mistake-proofed may still appear in the plan, but its control method becomes "system block" instead of "weekly review". The next chapters cover the control plan layout and each of these methods.
Common errors
- Controlling everything the project measured. Measurements used to diagnose the problem in Measure and Analyze are not all worth keeping. Drop the ones that have served their purpose.
- Controlling only the final output. Output-only control finds problems late and gives no clue about the cause.
- Controlling what is easy to measure. A convenient metric that does not link to a CTQ gives false comfort.
- Selecting a characteristic with no owner. If nobody can act on it, remove it or reassign the process step that affects it.
- Skipping the rejected items. Record which candidates you decided not to control and why. If the process changes later, the owner can revisit the decision.
- Ignoring stability. If a characteristic is already unstable, a control chart will signal constantly. Stabilize it first, or the plan will produce alarms nobody trusts.
What goes into the plan
For every characteristic that passes the screen, you will need to record the specification, how it is measured, the sample and frequency, the control method, the responsible person, and the reaction plan. The control plan chapter covers that layout. At this stage, write down one sentence for each item that states the link to the CTQ, for example "PO number missing leads to payment delays and supplier complaints". That sentence is the justification reviewers and future owners will read.
Exercise
A team improved a call-center process and reduced average handling time. Their candidate list is: (a) average handling time, (b) whether agents use the new call script, (c) the number of coffee machines on the floor, (d) the percentage of calls that need a callback within 7 days. Which would you put in the control plan, and which type (output or input) is each?
Show answer
Control (a), (b) and (d). Handling time (a) is an output that confirms the improvement holds. Script use (b) is a process input that explains why handling time changes and gives early warning, so it is the most useful to monitor. The callback rate (d) is an output that guards against reducing handling time by rushing customers and not solving their problem. Skip (c), because it has no link to any CTQ or outcome. Record the reason for skipping it in the plan notes.
Exercise
A candidate has a low total risk score but a severity rating of 10 because failure could breach a legal requirement. Should it enter the control plan? Give your reasoning.
Show answer
Yes. A high-severity characteristic should be controlled regardless of the product score, because a low likelihood or good detectability does not remove the consequence of a failure. Use a rule such as "severity 9 or 10 is always controlled", and prefer a mistake-proofing control so the protection does not depend on someone remembering to check.