Sub topic 5
Measuring reliably over time
A control plan is only as good as the numbers behind it. If the measurement method changes, drifts, or varies from person to person, a control chart will signal problems that are not in the process. It will also hide real ones. This chapter covers how to make sure the measurement in your control plan stays trustworthy after the project team leaves.
This chapter assumes you know the DMAIC phases, the difference between common and special cause variation, and how to read a basic run chart or control chart. You should also have seen a control plan row like the one in the previous chapter.
Why measurement matters in the Control phase
During Measure, the team usually checks the measurement system once, to confirm that the baseline data can be trusted. In Control, the same question returns in a harder form: will the measurement still be trustworthy in six months, when different people take the readings and nobody on the project team is watching?
Every observed value contains two sources of variation:
- Process variation: the real differences in what the process produces.
- Measurement variation: the noise added by the way you measure.
A control chart cannot tell these apart. If measurement noise is large, the chart's limits widen to include it, and small real shifts disappear inside the noise. If the measurement method changes without notice, the chart shows a step change that looks like a process shift.
Choosing the measurement method for each item
Each controlled characteristic in the control plan needs a measurement method written precisely enough that two people would take the same reading. A good method entry names:
- The instrument or data source, such as a workflow system report, a caliper, or a survey form.
- The exact definition of the value, including start and stop points.
- Who takes the measurement and when.
- Where the result is recorded.
- The sample: how many items, chosen how.
Consider the invoice approval example from the control plan. "Approval cycle time" is ambiguous. It could start when the invoice arrives in the mailbox, when it is scanned, or when it is entered in the workflow system. It could end at approval, at payment scheduling, or at payment. Each choice gives a different number. The control plan should say: "From the workflow system timestamp Received to the timestamp Approved, in calendar days." Without that sentence, two analysts can report different cycle times for the same invoices.
Prefer automatic data over manual data
Data collected by a system, such as timestamps and machine counters, is usually more consistent than data recorded by hand. It also costs less to collect, so you can often measure every item instead of a sample. When manual measurement is unavoidable, add a clear procedure and training, and check the readings periodically as described below.
Operational definitions
An operational definition states how a characteristic is judged, so that the judgment does not depend on who makes it. This matters most for attribute data (pass/fail, defect/no defect). "Label is correctly placed" is vague. "Label edge is within 2 mm of the marked line" can be checked by anyone with a ruler.
Kinds of measurement error
Measurement system analysis (MSA) breaks measurement error into parts. These are the terms you need for the control plan.
| Property | Question it answers | Typical symptom when it fails |
|---|---|---|
| Accuracy (bias) | Is the average reading close to the true value? | All readings are consistently high or low |
| Stability | Does the measurement stay the same over time? | Readings drift between months with no process change |
| Repeatability | Does one person get the same reading from the same item? | Repeat readings of one item differ |
| Reproducibility | Do different people get the same reading from the same item? | Results depend on who measured |
| Resolution | Is the instrument fine enough for the process spread? | Readings cluster on a few values |
For the Control phase, stability is the property that gets the most attention. A gauge or a manual method can pass a study in Measure and then degrade through wear, recalibration lapses, staff turnover, or a software update that changes how a timestamp is recorded.
Checking the measurement system
Two checks are common. The choice depends on the type of data.
Continuous data: gauge R&R
A gauge repeatability and reproducibility study (gauge R&R) has several operators measure the same set of parts more than once, then splits the variation into repeatability, reproducibility, and part-to-part variation. A common guideline from the Automotive Industry Action Group (AIAG) reads the result as the share of total variation that comes from the measurement system:
| Measurement system share of total variation | Usual interpretation |
|---|---|
| Under 10% | Acceptable |
| 10% to 30% | May be acceptable depending on the use and cost of improving it |
| Over 30% | Not acceptable; fix the measurement system |
Treat these as guidelines, not laws. A characteristic that is cheap to recheck can tolerate more measurement error than one that triggers an expensive shutdown.
Attribute data: agreement analysis
For pass/fail or category judgments, use an attribute agreement analysis. Several appraisers classify the same set of samples, and you compare each appraiser with themselves, with each other, and with a known correct answer. A kappa statistic is commonly reported. Values above about 0.9 indicate very good agreement, and values below about 0.7 indicate that the method needs work.
Keeping the system reliable after handover
A one-time study is not enough. The control plan should include ongoing checks of the measurement system itself. Typical ones:
- Calibration schedule: instruments are calibrated against a reference at set intervals, with records kept.
- Reference sample checks: a known item is measured regularly. If the readings drift, the gauge or method has changed.
- Periodic repeat of the study: a smaller R&R or agreement check is run on a schedule, and after any change of instrument, software, or operator group.
- Change control: any change to how a value is captured, such as a new report format or a different tool, is reviewed by the process owner before it takes effect.
The following YAML shows how these checks can sit beside a control plan item.
measurement_system_checks:
characteristic: Approval cycle time (days)
data_source: Workflow system timestamps (Received, Approved)
definition: "Calendar days from Received to Approved"
checks:
- name: Timestamp field audit
frequency: Quarterly
method: Compare 20 invoices against the paper approval stamp
acceptance: "At least 19 of 20 within 1 day"
owner: Accounts Payable Manager
- name: Re-validation after system change
trigger: Any workflow software update
method: Re-run the timestamp field audit before using new data
owner: Accounts Payable ManagerSample size and frequency
The control plan also fixes how much to measure and how often. Two rules help.
- Measure often enough that a shift is caught before it causes serious harm. A process that can produce bad output within an hour should not be checked weekly.
- Measure enough items that the result is meaningful, but not so many that people stop doing it. A check that is too burdensome will be skipped.
When measurement is expensive, rational subgrouping helps: take small samples at set intervals, so that variation inside a subgroup reflects short-term noise and variation between subgroups reflects drift. When data arrives one value at a time, as with the weekly cycle time, an individuals chart is the usual choice.
Spotting measurement problems in a chart
Some chart patterns point to the measurement system instead of the process:
- A sudden step change that coincides with a new tool, form, or person.
- Unusually erratic points around a flat line, which suggests poor repeatability.
- Different levels for different operators or shifts, which suggests poor reproducibility.
- A slow trend with no process cause, which suggests the gauge is drifting.
Before the owner launches a root-cause investigation of the process, the reaction plan should ask: did anything change in how we measure?
A worked example
A team improves an order-entry process and wants to monitor the daily error rate. Two clerks check a sample of orders for errors. After the handover, the monthly chart shows a jump from 2% to 5%.
The process owner follows the reaction plan. The first question is whether the measurement changed. The owner finds that a new clerk joined and counts a missing phone number as an error. The previous clerks did not. The process did not change. The operational definition was incomplete.
The fix is to add a one-line definition of "error" to the control plan, retrain both clerks with a set of 20 example orders, and recalculate the baseline. The owner records the incident in the change log.
Common errors
- Validating the measurement system once and never again.
- Writing a definition that depends on the judgment of the person measuring.
- Changing a report or tool without telling the process owner.
- Using a measurement with too little resolution, so the chart shows the same few values.
- Treating a gauge R&R result as pass/fail without considering how the data is used.
- Mixing data from different measurement methods in one chart.
Exercise
A weekly individuals chart of "cycle time" shows a sustained jump of about one day starting the same week IT updated the workflow software. The process steps and staffing did not change. What should the process owner check first, and what should happen to the control limits if the cause is confirmed?
Show answer
The owner should first check whether the software update changed how the timestamps are recorded, for example by comparing a sample of invoices against the paper approval stamps. If the update changed the measurement, the process itself has not shifted. The owner should correct or revalidate the method, mark the change on the chart, and recalculate the baseline and control limits from data collected under the new method.
Exercise
Why is "label is correctly placed" a weak entry in the measurement method column of a control plan, and how would you improve it?
Show answer
It depends on each inspector's judgment, so reproducibility will be poor. Replace it with an operational definition that anyone can check the same way, such as "label edge is within 2 mm of the marked line, checked with a ruler," and train inspectors on example items.