Sub topic 12
Auditing and Sustaining the Gains
This chapter assumes you know the DMAIC phases, the difference between common-cause and special-cause variation, and how to read a control chart. It also assumes the handover to the process owner is done: the control plan is approved, staff are trained, and the owner has signed acceptance. Handover transfers accountability, but it does not guarantee the gains last. Audits and sustainment reviews check that they do.
Why monitoring alone is not enough
A control chart tells you whether the output is stable. It does not tell you whether people still follow the method that produces that output. Three things can go wrong while the chart looks fine:
- The chart is still plotted, but nobody acts on the signals.
- The standard work has been quietly changed, and the process runs differently from the documents.
- The measure still looks good because the measurement method has changed, not because the process is better.
An audit looks at the process itself, not only at its numbers. It asks whether what people do matches what the control plan says. A sustainment review looks at results over time and asks whether the control system is still fit for purpose.
Audits and reviews compared
The two activities have different questions, different people, and different frequencies.
| Activity | Question it answers | Typical performer | Typical frequency |
|---|---|---|---|
| Process audit | Do people follow the standard work and the control plan? | Someone independent of the daily work, such as a quality or peer auditor | First audit within 1 to 3 months, then quarterly or semi-annually |
| Layered check | Are the critical steps being done today? | Team lead or supervisor | Daily or weekly, a few minutes each |
| Results review | Is the metric stable and still meeting the specification? | Process owner | Monthly |
| Sustainment review | Is the control system still the right one? Has the process, demand, or equipment changed? | Process owner with a sponsor or quality lead | Quarterly in the first year, then annually |
The first audit date should already be on the handover checklist. If it is not scheduled before the project team leaves, it often never happens.
Who audits
The process owner is accountable for sustainment, but an owner who audits their own process has a conflict of interest. A good arrangement uses two levels:
- The team lead runs short layered checks, because they are close to the work and can fix small problems on the spot.
- A person outside the process runs the formal audit. This can be a quality function, a peer from another area, or a former project team member in the first audit only.
Keep the project's Black Belt or Green Belt involved in the first audit, but not as the owner of the follow-up. If the belt stays responsible, the process never becomes the owner's own.
What a process audit checks
Build the audit checklist directly from the control plan. Each controlled characteristic gives you several checks, and each check has evidence you can look at.
- The standard is available. The current version of the standard work is at the point of use, and old versions are removed.
- The work matches the standard. Observe the work at the process, not only in the documents. Ask staff to show you how they do the step.
- Monitoring happens. Charts are updated at the planned frequency, by the named person, with the planned sample.
- Signals get a response. For every out-of-control signal since the last audit, there is a log entry showing the reaction plan was followed and the cause was recorded.
- Mistake-proofing still works. Test the device or check. Does the system still block the wrong input? Has anyone bypassed it?
- Training is current. New staff have been trained, and the training records match who actually works on the process.
- The measurement system is unchanged. The measuring tool, definitions, and data source are the same as in the control plan, or any change was approved.
You can record the schedule and scope in the same style as the control plan:
sustainment_plan:
process: Invoice approval
owner: Accounts Payable Manager
audits:
- type: Layered check
performer: Team lead
frequency: Weekly
scope: Workflow timestamps captured, chart updated, open signals logged
- type: Process audit
performer: Quality lead (independent)
frequency: Quarterly
scope: Standard work followed, reaction log reviewed, mistake-proofing tested, training records current
- type: Sustainment review
performer: Accounts Payable Manager with sponsor
frequency: Quarterly in year 1, annually after
scope: Trend of cycle time, changes in volume or system, control plan still adequate
first_audit_due: 60 days after handover
findings_log: Shared action tracker, reviewed at each sustainment reviewReading the chart over the long term
At sustainment time you read the chart differently than during monitoring. A single point outside the limits is a signal for the reaction plan. A slow drift is a signal for the sustainment review. Two rules help you spot drift before points leave the limits:
- Eight or more consecutive points on the same side of the center line indicate a shift in the process mean.
- A steady run of points trending in one direction suggests gradual wear or decay.
Compute the limits from the stable baseline, and keep them fixed. Do not recalculate them every month from all current data. Doing that lets the limits follow a slow drift, so the drift never shows up as a signal. Recalculate limits only when you have evidence that the process has genuinely changed, such as a deliberate improvement or a new system, and record why.
The following code applies the individuals chart limits from the spine's baseline and checks new points for both rules:
def individuals_limits(values):
"""Return (lower, center, upper) control limits for an individuals (I) chart."""
moving_ranges = [abs(b - a) for a, b in zip(values, values[1:])]
mr_bar = sum(moving_ranges) / len(moving_ranges)
center = sum(values) / len(values)
# 2.66 = 3 / d2, where d2 = 1.128 for moving ranges of size 2
return center - 2.66 * mr_bar, center, center + 2.66 * mr_bar
def find_signals(points, lower, center, upper, run_length=8):
"""Return (index, reason) pairs for points that need attention."""
found = []
for i, x in enumerate(points):
if x > upper or x < lower:
found.append((i, "beyond control limits"))
side = [1 if x > center else -1 if x < center else 0 for x in points]
for i in range(run_length - 1, len(points)):
window = side[i - run_length + 1 : i + 1]
if all(s == 1 for s in window) or all(s == -1 for s in window):
found.append((i, f"{run_length} points in a row on one side of the center"))
return found
baseline = [2.8, 3.1, 2.9, 3.0, 3.2, 2.7, 3.0, 2.9]
lower, center, upper = individuals_limits(baseline)
# Nine months after handover: no point is outside the limits, but the mean has moved up.
recent = [3.1, 3.0, 3.1, 3.2, 3.1, 3.3, 3.2, 3.1, 3.4]
print(f"Limits: {lower:.2f} to {upper:.2f}, center {center:.2f}")
for index, reason in find_signals(recent, lower, center, upper):
print(f"Point {index}: {reason}")No recent point crosses the upper limit of about 3.60 days, so a purely limit-based check stays silent. The run rule fires at points 7 and 8 because every point sits above the center of 2.95. The cycle time is still within the 3-day-or-less specification only in some weeks, so this is the kind of slow erosion a sustainment review exists to catch.
The audit cycle
Audit findings are only useful if they end in action. The loop below shows how each audit feeds back into the control system.
Classifying findings
Not every finding deserves the same response. Sort them so the owner puts effort where it matters.
- Critical: the control is not working, for example a signal with no reaction, or a bypassed mistake-proofing device. Act immediately and tell the sponsor.
- Major: the standard is not followed or the documents are out of date, but output is still within specification. Fix within an agreed period, such as 30 days.
- Minor or improvement: small gaps in records or wording. Fix at the next convenient point.
Close each finding with evidence, and then check effectiveness later. A finding closed by "reminded the team" will probably reappear. Prefer fixes that change the system, such as a revised form, a system block, or a changed role, over fixes that depend on memory.
When the process legitimately changes
Processes change after handover: a new software version, different volumes, a reorganization. The control plan must change with them. Treat this as a managed change, not as a failure.
- The owner records the change and its reason.
- The team checks whether the controlled characteristics, specification, measurement method, or reaction plan are still valid.
- If so, nothing changes except a note in the log. If not, update the plan and the standard work, retrain, and recalculate control limits from new stable data.
- The sustainment review confirms the revised plan.
Without this step, the control plan slowly describes a process that no longer exists, and people stop trusting it.
Common audit failures
- Box-ticking audits. The auditor checks documents and never watches the work. Always include direct observation.
- No consequences. Findings are logged but nobody follows them up. Review open findings at every sustainment review.
- Audit by the project team forever. The owner never builds the habit. Hand audit responsibility over after the first audit.
- Too many checks. A long checklist is skipped under pressure. Limit routine checks to the critical characteristics and keep layered checks to a few minutes.
- Audits stop when results look good. Good results lower the urgency, which is exactly when discipline slips. Reduce frequency only after several clean audits, and never to zero.
Exercise
Six months after handover, an individuals chart for approval cycle time shows no points outside the control limits, but the last ten points are all above the center line. The team lead says the process is fine because nothing is out of control. What do you tell them, and what do you do next?
Show answer
The process is not fine. Ten consecutive points on one side of the center line indicates a shift in the mean, even though no point has crossed a limit. Treat it as a signal: have the owner investigate what changed (volume, system, staffing, a skipped step in the standard work), check the reaction log and the measurement method for changes, and bring it to the next sustainment review. Do not recalculate the limits to absorb the shift. If the investigation shows a lasting legitimate change, update the control plan and standard work and recalculate limits from new stable data, with the reason recorded.
Exercise
Why should the formal process audit be run by someone other than the process owner, and what is the one thing the project's Black Belt should not keep doing after the first audit?
Show answer
The owner is accountable for the process and has an interest in it looking good, so an independent auditor gives a more honest view and can observe the work without bias. The Black Belt should not keep ownership of audits or follow-up actions after the first audit, because the process only becomes sustainable when the owner and their team run the control system themselves.