Sub topic 12
Writing and prioritizing delta requirements
This chapter assumes you know the Explore phase of SAP Activate, the clean core principle, and how workshop findings are classified as fit, configuration, or delta. It covers what to do once a finding is classified as a delta: how to write it so it can be estimated, how to challenge it, and how to rank it.
What counts as a delta requirement
A delta requirement is a business need that the standard scope item cannot meet, even after configuration. The term comes from the difference ("delta") between the standard process and what the business asks for.
Classify carefully before writing one. Many requests that sound like gaps turn out to be configuration:
- A second approval step above a threshold is often handled by standard workflow settings.
- A different field label or default value is usually configuration or key user adaptation.
- A new document layout that standard output management does not provide may be a real delta.
Each delta has a cost: build effort, testing, upgrade risk, and long-term maintenance. Write it down only after the team has checked the standard options.
From workshop remark to written requirement
A remark such as "we need a special invoice layout" is not a requirement. A usable delta requirement answers these questions:
- Which scope item and process step does it affect?
- What does the standard process do today, and what is missing?
- Why does the business need it? Name the driver, such as a contract, a regulation, or a measurable cost.
- Who owns the requirement and can confirm it later?
- What is the proposed approach, and which extensibility option does it use?
- How important is it, and what is its status?
The following record shows these fields in a tool-neutral format.
{
"id": "F2S-SD-007",
"scopeItem": "Sales Order Processing",
"processStep": "Create sales order",
"finding": "A customer-specific document layout is required that standard output management does not provide",
"classification": "delta",
"businessJustification": "Contractual requirement from a key customer",
"proposedApproach": "Review extensibility options in order of preference, starting with in-app and key user extensibility",
"priority": "must-have",
"status": "to be estimated"
}Notice that proposedApproach does not say "build a custom program". It records that the team will review options in order of preference. The approach is a proposal until the gap review confirms it.
Write the gap, not the solution
Business users often describe a solution ("add a Z-field to the order screen"). Rewrite it as the underlying need ("the warehouse must see the customer's delivery window when picking"). A need leaves room for a standard or lighter answer. A prescribed solution closes that door early.
Make requirements testable
Add an acceptance statement that a tester could check. "The layout must include the customer's contract number in the header" can be verified. "The layout must look professional" cannot.
The gap review: challenge before you accept
Between the workshop and the backlog, run a short review of each delta. A typical order of questions:
- Is it really a gap? Re-check the scope item and the available configuration options.
- Can the process change instead? Ask whether the business could adopt the standard way. This is the adopt-before-adapt question.
- Is the justification strong enough? A preference is not a justification. A contract clause, a legal rule, or a quantified loss is.
- Which extensibility option fits? Prefer in-app (key user) extensibility, then side-by-side extensibility on SAP Business Technology Platform, then developer extensibility, which means custom code on the stack, using released interfaces.
- What are the consequences? Consider upgrade effort, support ownership, and impact on other scope items.
The diagram shows this as a decision path.
Keep the outcome of every branch in the record, including rejections. A rejected delta with a reason stops the same request returning in the next workshop.
Prioritizing deltas
Prioritization decides what enters the first release and what waits. A common scheme is MoSCoW: must-have, should-have, could-have, won't-have (for now). Define each level in project terms so people apply them consistently.
| Priority | Meaning in the project | Typical test |
|---|---|---|
| Must-have | Go-live is not possible or not legal without it | Legal duty, contract, or a process that stops entirely |
| Should-have | Important, with a workable manual workaround | Workaround exists but costs measurable effort |
| Could-have | Improves convenience | No material business loss if absent |
| Won't-have (now) | Out of scope for this release | Defer to a later phase |
Add a second view beside priority: effort and risk. A must-have with a small in-app extension is simple to plan. A must-have that needs a large custom development is a project risk and may deserve escalation, for example a request to revisit the business process.
Watch for priority inflation. If most deltas are marked must-have, the label carries no information. Ask the owner what happens on go-live day if the item is missing. If the answer is "we use the standard process and a spreadsheet for a few weeks", it is probably a should-have.
Common errors
- Logging solutions instead of needs. This leads to custom code where a configuration would do.
- No business justification. Without one, you cannot defend the item during scope discussions.
- No owner. Unowned deltas stay open until the end of the phase and then become a dispute.
- Estimating before review. Effort spent estimating a gap that is later reclassified is wasted.
- Hiding rejected items. Keep them in the log, marked rejected, with the reason.
- Ignoring dependencies. A delta in one scope item can affect another, such as a new field that must flow into billing.
Handing deltas to the backlog
Once a delta has a reviewed approach, owner, and priority, it moves to the backlog as a work item. Keep the original ID, such as F2S-SD-007, on that item. This preserves traceability from workshop finding to build, test, and sign-off. The next chapters cover backlog tracking and scope change control in more detail.
Exercise
A workshop participant says, "Add a custom field to the purchase requisition so buyers can enter the requester's favorite supplier." The finance lead says it is a must-have. What do you do before this becomes a delta requirement?
Show answer
First rewrite the request as a need: what decision does the "favorite supplier" support? Then check whether standard options already cover it, such as source lists, supplier assignment, or an existing field. Ask for a business justification, because a preference is not one. If the need is real and not covered, review extensibility options starting with in-app (key user) extensibility, record the owner, and confirm priority with the requirement owner and process lead instead of accepting must-have on one person's word. If the justification is only convenience, the priority is likely could-have or the item is rejected, and the reason is recorded.