Sub topic 1
Work, rate and time: the one relation behind everything
Almost every question in this tutorial reduces to one relation: work equals rate times time. Workers, machines, pipes, leaks and wages all follow from it. This chapter builds that relation carefully, because the later chapters on combining workers, efficiency and cisterns reuse it unchanged.
Prerequisites
This chapter assumes you are comfortable with the following:
- Fractions and reciprocals: you can add fractions, and you know that the reciprocal of 4/7 is 7/4.
- Ratio and proportion, including the difference between direct and inverse proportion.
- Solving a simple linear equation such as 5t = 35.
- LCM of two numbers. It is used only lightly here and gets its own chapter next.
The relation
Work is the amount of a job that gets done. Rate is how much work is done per unit of time. Time is how long the work takes. They are linked by:
work = rate × time
Rearranged, this gives the two forms you will use constantly:
- rate = work ÷ time
- time = work ÷ rate
Nothing here is special to "work". It is the same structure as distance = speed × time. If you are comfortable with speed problems, you already know this relation. A worker's rate is a speed measured in "jobs per day" instead of "kilometres per hour".
The whole job counts as 1
Most CAT problems do not tell you how big the job is. They say "A can finish the job in 12 days". When the amount of work is not given, define the whole job as 1 unit of work. Then:
- A finishes 1 job in 12 days, so A's rate is 1/12 of the job per day.
- In general, someone who finishes a job in n days has rate 1/n per day.
- Conversely, a rate of 1/n per day means the job takes n days. Rate and time for the same whole job are reciprocals.
This reciprocal link is the most useful fact in the chapter. It lets you go from a time to a rate and back without thinking.
| Statement | Rate | Work done in 5 days |
|---|---|---|
| Finishes the job in 10 days | 1/10 per day | 5/10 = 1/2 of the job |
| Finishes the job in 12 days | 1/12 per day | 5/12 of the job |
| Finishes the job in 4 days | 1/4 per day | 5/4 of the job (more than the job, so the job ends at day 4) |
| Finishes the job in 20 days | 1/20 per day | 5/20 = 1/4 of the job |
The third row shows an edge case. A formula can return a value above 1, but a job cannot be more than 100% done. Work stops when the job is finished, so cap the work at 1 and find the finishing time from time = work ÷ rate.
Worked example: partial work
A can complete a job in 12 days. A works alone for 5 days. How long will A need to finish the remaining job?
- Rate of A = 1/12 per day.
- Work done in 5 days = (1/12) × 5 = 5/12.
- Work left = 1 − 5/12 = 7/12.
- Time for the rest = (7/12) ÷ (1/12) = 7 days.
The answer is 7 days. You could also see this directly: 5 days of a 12-day job leaves 12 − 5 = 7 days. That shortcut works only because the rate stays constant, which is the standing assumption in this chapter.
The same steps in code, using Python's Fraction type so you see exact fractions instead of rounded decimals:
from fractions import Fraction
def rate(work, time):
return Fraction(work) / Fraction(time)
def work_done(r, time):
return r * time
def time_needed(work, r):
return Fraction(work) / r
a = rate(1, 12)
print(a) # 1/12
done = work_done(a, 5)
print(done) # 5/12
print(time_needed(1 - done, a)) # 7When the work has a real size
Sometimes the job is measurable, such as bricks, pages or litres. Then work has actual units and the rate carries them.
Example: a bricklayer lays 150 bricks in 3 hours. How long does it take to lay 1,000 bricks at the same pace?
- Rate = 150 ÷ 3 = 50 bricks per hour.
- Time = 1,000 ÷ 50 = 20 hours.
Both styles use the same relation. "Whole job = 1" is just the special case where the unit of work is "one job". Choose whichever makes the arithmetic easier. If a problem mixes both (for example, "the job is 600 units and A finishes in 15 days"), use real units, since you then have a rate of 40 units per day with no fractions.
Direct and inverse proportion hiding in the relation
The relation gives you two proportionalities. Which one applies depends on what you hold fixed.
- Fixed rate: work is directly proportional to time. Double the time and you double the work done.
- Fixed work: time is inversely proportional to rate. Double the rate and the time halves.
The second is the one CAT leans on. Consider two workers, A and B, doing the same job. If A's rate is 3 times B's rate, A's time is one third of B's time. When comparing workers on the same job, ratios of rate are the reverse of ratios of time.
from fractions import Fraction
# Same job. A takes 6 days, B takes 18 days.
time_a, time_b = 6, 18
rate_a, rate_b = Fraction(1, time_a), Fraction(1, time_b)
print(rate_a / rate_b) # 3 -> A is 3 times as fast
print(Fraction(time_a, time_b)) # 1/3 -> A needs one third of B's timeReading "faster by" statements correctly
The phrase "A is 25% faster than B" compares rates, not times. This is a common source of lost marks.
Suppose B takes 20 days for a job and A is 25% faster than B.
- B's rate = 1/20 per day.
- A's rate = 1.25 × (1/20) = 1/16 per day.
- A's time = 16 days, not 15 days.
The time falls by 4 days, which is 20% of B's time. So "A is 25% faster" corresponds to "A takes 20% less time". The percentages differ because rate and time are reciprocals. The reverse trap works the same way: if A is 25% faster than B, then B is 20% slower than A, not 25% slower.
Units must match
Rate is only meaningful with a consistent unit of time. If A's rate is given per day and B's per hour, convert one before comparing or adding. A typical case:
- A paints a wall in 2 days. B paints the same wall in 10 hours.
- B's rate is 1/10 per hour. A's rate is 1/2 per day, which is 1/(2 × 24) = 1/48 per hour if A works around the clock.
Check whether the problem states a working day (for example, 8 hours a day). If it does, then "2 days" means 16 working hours, and A's rate is 1/16 per hour. Read the working-day statement before converting.
Assumptions behind the model
Every formula in this tutorial rests on assumptions. When a problem breaks one, you must adjust.
- Constant rate: a worker works at the same pace throughout. If a worker slows down or speeds up, split the job into stages with a constant rate in each.
- Same job: rates only compare when the work is the same. "A digs a trench in 6 days" and "B digs a longer trench in 6 days" are not equal rates.
- Work is additive: parts of the job add up. Half the job done and half the job done make the whole job.
- No wasted effort: when two people work, their output is simply the sum of what each would do alone. Real teams may not follow this, but exam problems do.
Common errors
- Writing the rate as n instead of 1/n. A person who takes 8 days does 1/8 of the job per day, not 8.
- Adding times instead of rates. If A takes 10 days and B takes 15 days, they do not take 25 days together, and they do not take 12.5 days either. Rates add, and times do not. The next chapters build this fully.
- Forgetting to subtract the work already done before computing the remaining time.
- Treating a result above 1 as meaningful instead of capping the work at the whole job.
- Mixing units, such as days and hours, or ignoring a stated working-day length.
A short checking routine
Use this checklist on every problem in this tutorial:
- Identify the work. Is it 1 whole job, or a measured quantity?
- Write each rate as work ÷ time, in one consistent time unit.
- Compute work done in each stage as rate × time.
- Subtract the work done from the total to get what remains.
- Estimate the answer before and after. A single worker who takes 12 days must take more than 12 days alone for any task of the full job, and any team that includes that worker must take less.
Summary
- Work = rate × time. Rate = work ÷ time. Time = work ÷ rate.
- If the job size is not given, call it 1. A worker who finishes in n days has rate 1/n.
- Rate and time for the same job are reciprocals, so faster workers take proportionally less time.
- "X% faster" refers to rate. The matching change in time is smaller.
- Keep units consistent, and check the assumptions of constant rate and identical work.
Exercise
A can paint a fence in 18 days. A works alone for 7 days. What fraction of the fence is painted, and how many more days does A need to finish?
Show answer
A's rate is 1/18 of the fence per day. In 7 days A paints 7/18. The remainder is 11/18, which takes (11/18) ÷ (1/18) = 11 more days.
Exercise
A machine fills 450 bottles in 9 hours at a constant rate. How many hours does it need to fill 1,000 bottles?
Show answer
The rate is 450 ÷ 9 = 50 bottles per hour. Time = 1,000 ÷ 50 = 20 hours.
Exercise
A is 25% more efficient than B. B alone needs 30 days to finish a job. How many days does A need?
Show answer
B's rate is 1/30. A's rate is 1.25 × (1/30) = 1/24. So A needs 24 days, which is 20% less time than B.