Sub topic 4
Efficiency ratios and inverse proportion with time
This chapter assumes you know fractions and reciprocals, ratio and proportion, direct and inverse proportion, and how to solve a simple linear equation. It also assumes you have read the earlier chapters on the work-rate-time relation, the LCM method and adding rates.
What efficiency means
Efficiency is the amount of work a worker does in one unit of time. It is the same quantity as the rate in work = rate × time. People use the word "efficiency" when they compare workers and "rate" when they calculate with one worker.
Suppose A finishes a job in 10 days and B finishes the same job in 15 days. Their rates are 1/10 and 1/15 of the job per day. Their efficiencies are in the ratio
(1/10) : (1/15) = 15 : 10 = 3 : 2.
Their times are in the ratio 10 : 15 = 2 : 3. The two ratios are reciprocals of each other, so for the same work:
- Efficiency is inversely proportional to time.
- If A's efficiency is 3 parts and B's is 2 parts, A's time is 2 parts and B's time is 3 parts.
The rule that follows from this:
> Ratio of efficiencies = reverse of ratio of times (for the same amount of work).
Reversing a ratio is quick, and it removes the need to write fractions in many problems.
A method that works every time
Most efficiency problems fit these steps.
The units you assign are not real quantities. The ratio 3 : 2 can be read as 3 and 2 units per day, or 6 and 4. The answer does not change. Choose the smallest whole numbers that fit.
Worked example 1: a percentage comparison
A is 50% more efficient than B. B alone finishes a job in 30 days. How long do A alone, and A and B together, take?
- A's efficiency is 150% of B's, so A : B = 3 : 2.
- Let A do 3 units per day and B do 2 units per day.
- Total work = B's rate × B's time = 2 × 30 = 60 units.
- A alone takes 60 / 3 = 20 days.
- Together they do 5 units per day, so they take 60 / 5 = 12 days.
Check the ratio of times: A 20, B 30, which is 2 : 3. That is the reverse of 3 : 2, as it should be.
Worked example 2: from a combined time
A is twice as efficient as B. Together they finish a job in 12 days. How long does each take alone?
- A : B = 2 : 1, so together they do 3 units per day.
- Total work = 3 × 12 = 36 units.
- A alone takes 36 / 2 = 18 days.
- B alone takes 36 / 1 = 36 days.
Verify with fractions: 1/18 + 1/36 = 2/36 + 1/36 = 3/36 = 1/12. The pair finishes in 12 days.
Worked example 3: three workers
A, B and C have efficiencies in the ratio 4 : 2 : 1. Working together they finish in 14 days. Find each worker's time alone.
The code below turns a list of efficiency units and a combined time into each worker's solo time.
from fractions import Fraction
def solo_times(efficiencies, together_days):
total_work = sum(efficiencies) * together_days
return [Fraction(total_work, e) for e in efficiencies]
times = solo_times([4, 2, 1], 14)
print([float(t) for t in times]) # [24.5, 49.0, 98.0]The combined rate is 7 units per day, so the total work is 7 × 14 = 98 units. A takes 98/4 = 24.5 days, B takes 49 days, and C takes 98 days. The solo times are in the ratio 24.5 : 49 : 98 = 1 : 2 : 4, which is the reverse of 4 : 2 : 1.
The difference trap: "x days less" or "x days more"
Many CAT problems give a time difference, not a time. Work with the time ratio, find the value of one part, then scale.
Example: A is three times as efficient as B, and A takes 40 days less than B to finish a job. Find the time each takes.
- Efficiency A : B = 3 : 1, so time A : B = 1 : 3.
- The difference in time is 3 − 1 = 2 parts, and this equals 40 days.
- One part is 20 days. A takes 20 days and B takes 60 days.
Check: 60 − 20 = 40, and A's rate is 3 times B's because 1/20 = 3 × (1/60).
Percentages and time: the asymmetry
"x% more efficient" does not mean "x% less time". Efficiency and time are reciprocals, so the percentage changes are different.
Suppose a worker's efficiency goes from 100 to 125, an increase of 25%. The time for a fixed job goes from 1/100 to 1/125 of the work, in proportion, which is 100 → 80. The time falls by 20%, not 25%.
| Change in efficiency | Equivalent change in time |
|---|---|
| Up by p% | Down by 100p / (100 + p) % |
| Down by p% | Up by 100p / (100 − p) % |
| Up 25% | Down 20% |
| Up 50% | Down 33.33% |
| Down 20% | Up 25% |
| Down 50% | Up 100% |
The function below applies these formulas.
def time_change_from_efficiency(p, increase=True):
"""Return the percentage change in time for a p% change in efficiency."""
if increase:
return -100 * p / (100 + p) # negative means time falls
return 100 * p / (100 - p) # positive means time rises
print(time_change_from_efficiency(25, increase=True)) # -20.0
print(time_change_from_efficiency(20, increase=False)) # 25.0The two directions mirror each other. A 25% rise in efficiency cuts time by 20%. A 20% fall in efficiency raises time by 25%. If a problem says "after a 20% drop in efficiency, the job takes 5 days longer", the old time T satisfies 0.25T = 5, so T = 20 days.
Groups: "as efficient as" statements
Some problems relate a worker to a group.
Example: A alone is as efficient as B and C together. A alone takes 12 days. How long do A, B and C take together?
- A's rate equals the rate of B and C combined.
- Take A's rate as 1/12. Then B and C together also do 1/12 per day.
- All three together do 1/12 + 1/12 = 1/6 per day, which takes 6 days.
Adding a ratio: if B : C = 1 : 2, then B and C together are 3 parts. A equals those 3 parts, so A : B : C = 3 : 1 : 2. Then B alone takes 12 × 3 = 36 days, and C alone takes 12 × 3 / 2 = 18 days. Check: 1/36 + 1/18 = 1/36 + 2/36 = 3/36 = 1/12. This equals A's rate, as required.
A common error is to read "A is as efficient as B and C together" as "A = B = C". It means A's rate equals the sum of B's and C's rates.
Edge cases and common errors
- Reversing the wrong ratio. If a problem gives times, reverse them to get efficiencies. If it gives efficiencies, reverse them to get times. Doing the reversal twice, or not at all, is the most common slip. Check that the faster worker has the smaller time.
- Adding times. Times do not add for workers who work together. Add efficiencies, then divide the total work.
- Comparing different jobs. Efficiency ratios hold within one job. If two jobs differ in size, put both on a common total work first.
- Fractional ratios. If the ratio is 1/2 : 1/3, multiply through by 6 to get 3 : 2 before assigning units.
- Ratio given with a changing worker. If B becomes 20% less efficient halfway, B's rate changes. Treat the two stages separately, with the new rate for the second stage.
Quick check on reasonableness
After any solution, ask three questions:
- Is the most efficient worker's time the smallest?
- Is the combined time smaller than the smallest solo time?
- Do the solo times reverse back to the efficiency ratio you started with?
In Worked example 2, the solo times are 18 and 36 and the combined time is 12. The combined time is below 18, and 18 : 36 = 1 : 2 reverses to the efficiencies 2 : 1. All three checks pass.
Exercise
A is 60% more efficient than B, and B takes 24 days more than A to do a job. How long does each take alone, and how long do they take together?
Show answer
A : B efficiency = 160 : 100 = 8 : 5, so the time ratio A : B = 5 : 8. The difference of 3 parts is 24 days, so one part is 8 days. A takes 40 days and B takes 64 days. Together: 1/40 + 1/64 = 8/320 + 5/320 = 13/320 of the job per day, so they take 320/13 ≈ 24.6 days.
Exercise
A machine usually finishes a batch in 40 hours. After a software update its efficiency rises by 25%. How long does the batch take now? What would the time be if its efficiency had instead fallen by 20%?
Show answer
Efficiency up 25% gives an efficiency ratio of 5 : 4 (new : old), so the time ratio is 4 : 5 and the new time is 40 × 4/5 = 32 hours. Efficiency down 20% gives a ratio of 4 : 5 (new : old), so the time ratio is 5 : 4 and the time is 40 × 5/4 = 50 hours.
Exercise
A is as efficient as B and C together. B is twice as efficient as C. A, B and C together finish a job in 8 days. How long does C take alone?
Show answer
A = B + C and B = 2C, so with C = 1 unit, B = 2 units and A = 3 units. Together they do 6 units per day, so the total work is 6 × 8 = 48 units. C alone takes 48 / 1 = 48 days.