Shortcuts, traps and sanity checks for CAT
This chapter assumes you have worked through the earlier chapters. You should be comfortable with work = rate × time, the LCM method for choosing total work, adding rates, efficiency ratios, and the pipes-as-rates model. Here we collect the fast methods, the mistakes that cost marks, and checks that catch an error in a few seconds.
A routine that prevents most errors
Most wrong answers come from skipping setup, not from weak arithmetic. Use the same five steps every time.
- Choose the total work. Use the LCM of the given times, or 1 if the numbers are awkward.
- Convert each worker or pipe into a rate in units per day (or per hour). Use a negative rate for anything that removes work, such as an outlet pipe or a leak.
- Write the time each person or pipe is active. Active time is often not the same as the elapsed time.
- Add up rate × active time and set it equal to the total work.
- Run a sanity check before you pick an option.
Shortcuts worth memorising
Two workers: product over sum
If A alone takes a days and B alone takes b days, together they take ab/(a+b) days. For 10 and 15 days this gives 150/25 = 6. This is the quickest route when the numbers are small. The LCM method is better when there are three or more workers, or when joining and leaving is involved.
One worker k times as fast
If B is k times as fast as A, and A alone takes a days, then B alone takes a/k days and together they take a/(k+1) days. For example, A takes 12 days and B is 3 times as fast. Together they take 12/4 = 3 days.
Pair times for three workers
You may be told how long A+B, B+C and C+A take. Add the three pair rates. The total counts each worker twice, so the rate of all three together is half of that sum. Then subtract a pair rate to get the third worker's rate.
Efficiency ratio gives time ratio directly
Rates are in the ratio 3 : 2 when times are in the ratio 2 : 3. You do not need the total work for this. If a worker is 25% more efficient, the rate ratio is 5 : 4 and the time ratio is 4 : 5. A worker with a 4-day time per 5 of the other takes 20% less time, not 25%.
Wages follow work, not days present
Wages are split in proportion to the work done, which is rate × active time. For A (10 days) and B (15 days) working together on a job paying 600, the rates are 3 and 2 units per day. Work done is in the ratio 3 : 2, so A gets 360 and B gets 240. Because they work the same number of days, this is the same as splitting by rate. If one worker leaves early, you must use rate × active time instead.
Man-days and man-hours
When the work is the same and efficiency is equal, men × days × hours per day is constant. Take 12 men working 8 hours a day for 10 days, which is 960 man-hours. With 16 men working 6 hours a day, the time is 960 / 96 = 10 days. If men and women have different efficiencies, convert everyone to one unit first. Do not add head counts.
Traps that cost marks
| Trap | What goes wrong | Correct move |
|---|---|---|
| Adding times | Treating 10 days and 15 days as 25 days together | Add rates, never times |
| "Leaves 2 days before the end" | Subtracting 2 from the wrong total | Let the total elapsed time be T. The leaver is active for T − 2 days |
| "Twice as good as" | Reading it as twice the time | Twice as good means twice the rate and half the time |
| Percent efficiency | Mixing "25% more efficient" with "25% less time" | Efficiency up 25% means rate ratio 5 : 4. Time is then 20% less |
| Alternating days | Rounding the last partial day up | Find full cycles, then the fraction of the final day |
| Leak problems | Using the filling time with the leak as the pipe time | Use leak rate = fill rate − net rate |
| Units | Mixing hours, minutes and days | Convert everything to one unit before finding rates |
| Wages | Splitting by days present or by head count | Split by rate × active time |
| Pipes that "fill or empty" | Missing that a negative net rate means the tank empties | Check the sign of the net rate |
Joining and leaving: a worked example
A (10 days alone) and B (15 days alone) start together. A leaves 2 days before the job finishes. Take total work 30, so A does 3 per day and B does 2 per day. Let T be the elapsed time. B works for T days and A works for T − 2 days.
3(T − 2) + 2T = 30, so 5T = 36 and T = 7.2 days.
A did 3 × 5.2 = 15.6 units and B did 2 × 7.2 = 14.4 units, which add to 30. The same method applies to pipes closed before the end.
Alternating days: the partial last day
Let A take 12 days and B take 18 days. Total work is 36 units, with A at 3 units per day and B at 2. Starting with A, one two-day cycle does 5 units. Seven cycles take 14 days and do 35 units. One unit remains, and it is A's turn, so A needs 1/3 of a day. The answer is 14 1/3 days. Answers like 14 or 15 are the usual wrong options. Stopping the count at the end of a whole day is exact only when the work happens to end on a day boundary.
Leaks: working backwards
A tank fills in 6 hours with the inlet alone. With a leak it takes 8 hours. The net rate is 1/8 and the inlet rate is 1/6, so the leak rate is 1/6 − 1/8 = 1/24 of the tank per hour. The leak empties a full tank in 24 hours. A common error is to say the leak takes 8 − 6 = 2 hours. Hours do not subtract; rates do.
Checking in code
You can use a short script to verify exam answers while practising. Exact fractions avoid rounding. Treat a negative time as an outlet or leak.
from fractions import Fraction
def net_time(*times):
"""Times are positive for fillers or workers, negative for outlets or leaks.
Returns the time to finish (positive) or to empty (negative)."""
rate = sum(Fraction(1) / Fraction(t) for t in times)
if rate == 0:
raise ValueError("net rate is zero, the job never finishes")
return 1 / rate
print(net_time(10, 15)) # 6
print(net_time(6, -10)) # 15
print(net_time(6, -4)) # -12, so the full tank empties in 12 hoursThe alternating-schedule function below handles the partial last day exactly.
from fractions import Fraction
def alternate_time(total, rate_first, rate_second):
total = Fraction(total)
cycle = Fraction(rate_first) + Fraction(rate_second)
full_cycles = int(total // cycle)
done = full_cycles * cycle
days = Fraction(2 * full_cycles)
for rate in (Fraction(rate_first), Fraction(rate_second)):
if done >= total:
break
if done + rate >= total:
days += (total - done) / rate
done = total
else:
done += rate
days += 1
return days
print(alternate_time(30, 3, 2)) # 12
print(alternate_time(36, 3, 2)) # 43/3, which is 14 1/3 days
print(alternate_time(31, 3, 2)) # 37/3The second result, 43/3, equals 14 1/3 days, which matches the hand calculation above.
Sanity checks in under ten seconds
Run at least two of these before you mark an option.
- Together is faster than the fastest. If all workers help, the time must be less than the smallest individual time. If it is not, you added times by mistake.
- A leak makes things slower. With a leak or outlet, the net filling time must be longer than the inlet-only time.
- The work sums to the total. Add up rate × active time for each worker. It must equal the total work, as in the 15.6 + 14.4 = 30 check above.
- Bound the answer. If A alone takes 10 days and B alone takes 15, any together time must lie between 5 and 10 days. Here, 6 fits.
- Check units and rounding. An answer of 12 days when the question asks for hours is wrong however clean it looks.
- Use the options. CAT options often include the traps above. If your answer matches an option exactly, check that it is not the "added times" or "rounded up" version.
Practice
Exercise
A and B can finish a job in 12 days and 18 days. They start together, but A leaves 3 days before the job is finished. How many days does the job take in total?
Show answer
Take total work 36. A does 3 per day and B does 2 per day. Let T be the elapsed time. A works T − 3 days and B works T days, so 3(T − 3) + 2T = 36. This gives 5T = 45, so T = 9 days. Check: A does 3 × 6 = 18 and B does 2 × 9 = 18, which add to 36.
Exercise
An inlet pipe fills a tank in 5 hours. With a leak at the bottom, the tank takes 6 hours to fill. How long does the leak take to empty a full tank, and how long would the inlet and leak together take if the tank were already half full?
Show answer
The leak rate is 1/5 − 1/6 = 1/30 of the tank per hour, so a full tank empties in 30 hours. With the leak open, the net rate is 1/6 per hour. The other half of the tank needs 0.5 ÷ (1/6) = 3 hours.