Sub topic 3
TIMWOODS: the Eight Wastes at a Glance
Assume you understand that a process turns inputs into outputs and can read simple time and quantity figures. This chapter gives you a working map of the eight Lean wastes before examining each one in detail.
In Lean, waste, or muda, is activity that uses resources without adding value the customer needs. Value-added work changes the product or service in a way the customer would pay for. Some work is necessary non-value-added, such as a legally required check. Pure waste adds no value and can usually be removed.
The TIMWOODS framework
TIMWOODS is a memory aid:
- T — Transportation: unnecessary movement of materials, information, or products.
- I — Inventory: excess raw materials, work in progress, finished goods, or queued information.
- M — Motion: unnecessary movement by people.
- W — Waiting: idle time for people, machines, materials, decisions, or information.
- O — Overproduction: making or processing more than needed, or earlier than needed.
- O — Over-processing: doing more work, or using a more complex method, than the customer requires.
- D — Defects: errors that cause scrap, rework, complaints, or repeated service.
- S — Skills: failing to use people's knowledge, ideas, or abilities.
| Waste | Manufacturing example | Office example | Software example |
|---|---|---|---|
| Transportation | Moving parts between distant areas | Sending a paper file between offices | Moving data between unnecessary services |
| Inventory | Piles of unfinished units | A large backlog of requests | Unstarted features in a long queue |
| Motion | Walking to a distant tool | Searching through filing cabinets | Repeatedly switching tools or windows |
| Waiting | A machine idle for material | Waiting for an approval | Waiting for a build or code review |
| Overproduction | Making units before an order | Creating reports nobody reads | Building features before validated demand |
| Over-processing | Polishing a hidden surface | Entering the same data twice | Adding unnecessary architecture |
| Defects | A part outside specification | An incorrect invoice | A bug that requires rework |
| Skills | Ignoring an operator's improvement idea | Excluding staff from process design | Not using a developer's testing expertise |
These wastes rarely occur alone. Overproduction creates inventory. Inventory hides defects and increases waiting. Waiting encourages people to start more work, which increases work in progress. Over-processing and defects consume capacity that could address the actual customer need.
Applying the framework
During observation, record what happens rather than what should happen. Note queues, handoffs, repeated work, movement, and unused knowledge. One activity may show several wastes. For example, a batch of unrequested reports is overproduction, creates information inventory, and may later become a defect if its data becomes outdated.
The categories help you describe symptoms consistently. Later analysis must still identify the cause and select a suitable countermeasure.
Exercise
A team prepares 100 support reports each week, but customers request only 20. The reports sit in a shared folder and some contain outdated data. Which wastes are visible?
Show answer
Overproduction is visible because the team creates more reports than requested. The unused reports are information inventory, and outdated data creates defects or rework.