Defects: Rework, Scrap, and Errors
Assume you understand that a process turns inputs into outputs and can read simple quantities and times. This chapter focuses on defects as a Lean waste category. It shows how to separate the defect from its cost and from the cause that created it.
What counts as a defect?
A defect is an output that does not meet a stated requirement. The requirement may concern size, function, accuracy, delivery information, security, or any other condition the customer or the next process needs.
Defects create waste in several forms:
- Scrap: The output cannot be used and must be discarded or replaced.
- Rework: The output can be corrected, inspected again, or completed through extra work.
- Errors: A mistake in data, code, paperwork, or a transaction produces an incorrect result.
- Defect escape: A defect passes the normal check and reaches a customer or later process.
The defect itself is only part of the problem. The organization also loses time finding it, explaining it, correcting it, retesting it, and handling its effects.
| Setting | Example defect | Typical consequence |
|---|---|---|
| Manufacturing | A drilled hole is in the wrong position | Scrap or rework |
| Office | An invoice contains the wrong tax rate | Correction and delayed payment |
| Software | A release loses customer data during an update | Rollback, investigation, and customer impact |
A defect is not defined by how hard it is to fix. A small data-entry error is still a defect if it produces an incorrect result.
A working model for defects
Defects usually arise when a process allows variation, ambiguity, or a mistake to produce an unacceptable output. Inspection can find the problem, but inspection alone does not prevent it. A stronger design makes the error difficult to make or immediately visible.
Track defects at three points:
- Created: Where did the condition first occur?
- Detected: Where did someone or something discover it?
- Escaped: How far did it travel before detection?
For example, a developer may introduce an incorrect calculation, a test may detect it before release, or a customer may find it in production. The defect was created during development, even if testing found it later.
Common errors when analyzing defects
Do not count only customer complaints. Internal defects discovered before delivery still consume capacity and hide process weakness.
Do not blame the person who made the mistake before examining the system. The work may lack clear instructions, usable tools, training, feedback, or a way to prevent incorrect input.
Do not treat rework as normal production. Record the original work and the extra work separately. Otherwise, reported capacity looks higher than the process can reliably deliver.
Countermeasures
Choose a countermeasure that matches the failure mode:
- Use standard work when steps or acceptance criteria vary.
- Use poka-yoke, or mistake-proofing, when a design can prevent an incorrect action or make it immediately obvious.
- Add automated tests or validation at the point where an error can be created.
- Use a small, targeted check when full inspection is expensive and prevention is not yet practical.
- Review recurring defects with the people who perform the work.
A useful measure is first-pass yield: the percentage of outputs accepted without rework. Improve the process so this measure rises because fewer defects are created, not because checks are skipped.
Exercise
A report is rejected because one field uses an old customer address. The clerk corrects it after a reviewer finds the problem. Is this scrap, rework, or a defect escape?
Show answer
It is a defect that caused rework. It is not a defect escape if the reviewer found it before the report reached the customer.