Sub topic 14
Decide: go, adjust, or stop
This chapter assumes you have run a pilot and have its data in hand. You should know the pilot's hypothesis, success criterion, guardrail metrics, and baseline. You should also be comfortable with means, variation, and the idea that a difference can come from chance. The earlier chapters on hypotheses, guardrails, and analysis cover these.
What the decision is
At the end of a pilot you choose one of three outcomes:
- Go: the change met its success criterion, stayed within its guardrails, and the evidence is strong enough to roll it out.
- Adjust: the change is safe and promising but did not clearly meet the criterion, or the evidence is too thin. You modify the change or extend the pilot, then decide again.
- Stop: a guardrail was breached, or the change cannot plausibly deliver a worthwhile benefit. You roll back and record what you learned.
The decision should be mostly mechanical, because the hard thinking happened before the pilot. If the team argues about what "success" means after seeing the numbers, the pilot's criteria were not specific enough. People also tend to read results in the way that favors the change they proposed. A rule written in advance removes that pull.
Agree the decision rule before the pilot
Write the rule down, and get the sponsor and process owner to sign it before data collection starts. A usable rule has three parts.
- A success criterion. For example, "mean cycle time falls by at least 10% versus the baseline."
- One or more guardrails with hard limits. For example, "defect rate stays at or below 3%."
- An evidence standard. For example, "the 95% interval for the improvement excludes zero" or "the lower bound of the interval meets the target."
The table maps the common result patterns to outcomes.
| Guardrails | Target metric | Evidence | Decision |
|---|---|---|---|
| Breached | Any | Any | Stop and roll back |
| Within limits | Meets target | Strong | Go |
| Within limits | Meets target | Weak or noisy | Adjust: extend or repeat the pilot |
| Within limits | Misses target, effect plausible | Any | Adjust: refine the change |
| Within limits | Effect too small to matter, even at best estimate | Strong | Stop |
The order of the rows matters. Guardrails come first because a large gain in speed that raises defects or harms staff is not an improvement. It moves the cost somewhere else.
Encode the rule to remove ambiguity
Writing the rule as code is a good test of whether it is complete. If you cannot write it as a function, it has gaps.
def decide(improvement, target, defect_rate, defect_limit):
"""Return a pilot decision from the success criterion and one guardrail."""
if defect_rate > defect_limit:
return "stop" # guardrail breached, roll back regardless of improvement
if improvement >= target:
return "go"
return "adjust" # safe but did not reach the target
print(decide(improvement=0.15, target=0.10, defect_rate=0.02, defect_limit=0.03)) # go
print(decide(improvement=0.15, target=0.10, defect_rate=0.05, defect_limit=0.03)) # stop
print(decide(improvement=0.04, target=0.10, defect_rate=0.02, defect_limit=0.03)) # adjustThis version uses a single point estimate. Real pilots have noise, so a stronger rule looks at the interval around the improvement. The next version uses the low and high ends of a 95% interval. It adds a floor, the smallest improvement still worth the cost of rollout.
def decide_with_evidence(low, high, target, floor, defect_rate, defect_limit):
"""Decide using the interval (low, high) for the relative improvement."""
if defect_rate > defect_limit:
return "stop" # guardrail first
if high < floor:
return "stop" # even the best plausible effect is not worth it
if low >= target:
return "go" # the whole interval meets the target
return "adjust" # promising but not proven
cases = [
(0.12, 0.18, 0.10, 0.05, 0.02, 0.03), # go
(0.04, 0.26, 0.10, 0.05, 0.02, 0.03), # adjust: wide interval
(-0.02, 0.03, 0.10, 0.05, 0.02, 0.03), # stop: no worthwhile effect
(0.12, 0.18, 0.10, 0.05, 0.05, 0.03), # stop: guardrail breached
]
for case in cases:
print(case, "->", decide_with_evidence(*case))The second case shows why interval width matters. The point estimate there is 15%, which beats the 10% target. But the interval runs from 4% to 26%, so the pilot cannot rule out an effect that is too small. The right response is to collect more data, not to scale.
The decision flow
Interpreting each outcome
Go
A go decision means the change worked here, under pilot conditions. It does not mean it will work everywhere. Before approving, check three things:
- Representativeness. Was the pilot site typical, or did it have an unusually strong team, light workload, or extra attention from the project team?
- Durability. Did the gain hold through the last weeks, or did it fade? A gain that shrinks over time suggests a novelty effect, where people perform better simply because they are being watched or are trying something new.
- Support needs. Did the result depend on resources, such as a dedicated coach, that will not exist at scale?
If any answer is doubtful, a go can still be conditional. Name the conditions, such as "roll out only with the training package used in the pilot."
Adjust
Adjust is the outcome most often misused. It can become a way to avoid deciding, with the team keeping a favored idea alive through endless small changes. Keep it disciplined:
- State what you will change and why, tied to evidence from the pilot. For example, "step 4 handoffs caused most of the delays, so we will redesign that step."
- Set a new success criterion only if the original was clearly wrong, and write down the reason. Do not lower the target to fit the result.
- Limit the number of adjust cycles. Two is a common cap. After that, the decision should be go or stop.
- Treat the adjusted pilot as a new pilot, with its own baseline check and guardrails. Mixing data from before and after the modification hides what each version did.
An adjust is also correct when the evidence is simply too thin. In that case the change stays the same and you extend the pilot to gather more data, with the same rules.
Stop
Stop is a successful outcome for the pilot, since the pilot exists to find failures cheaply. Roll back using the plan prepared in advance, confirm the metrics return to the baseline, and record why you stopped. Resist the sunk cost argument, which says the team has put in so much effort that it should continue. The effort is spent either way. The question is only whether more investment will pay off.
Edge cases
- Mixed results across sub-groups. The change may help one shift or product type and hurt another. Do not hunt through many sub-groups until one looks good, because with enough slices some will show a difference by chance. Examine only sub-groups named in advance, and treat unplanned findings as ideas for a new pilot.
- Statistically significant but trivial. With a large sample, a 1% improvement can be statistically clear and still not worth the cost of training and change. That is why the rule includes a floor.
- Large but uncertain. A big improvement from a small sample gives a wide interval. This is the adjust-by-extending case.
- Guardrail close to its limit. If defects sit at 2.9% against a 3% limit, the rule says go, but think about trend and variation. Check whether the guardrail was rising through the pilot. Document the concern, and set tighter monitoring after rollout.
- External events. A supplier outage or seasonal peak during the pilot can distort results. Use your comparison group to separate these effects from the change. If they cannot be separated, extend the pilot.
- Disagreement with the rule. If stakeholders want to override the rule, require a written reason and sponsor sign-off. An undocumented override makes the pilot's evidence worthless.
Document the decision
A short decision record keeps the reasoning available to people who join later. Include:
- The hypothesis, success criterion, guardrails, and evidence standard as agreed before the pilot.
- The pilot's scope, dates, and comparison method.
- The results: baseline, pilot values, interval, guardrail readings.
- The decision (go, adjust, or stop) and the rule branch that produced it.
- Known limits: site differences, novelty effects, unresolved concerns.
- Next actions and owners: rollout plan, adjustment plan, or rollback confirmation.
For a go, this record becomes the handover to standardization. It tells the rollout team what training, documentation, and control measures the change needs.
Common errors
- Deciding on the point estimate alone and ignoring the interval.
- Checking the target metric first and treating guardrails as an afterthought.
- Rewriting the success criterion after seeing the data.
- Using adjust as an open-ended holding state.
- Calling a stopped pilot a failure and not recording what it taught.
Exercise
A pilot's success criterion was a 10% cut in mean cycle time, with a defect limit of 3% and a worthwhile floor of 5%. The results show a 95% interval for the improvement of 3% to 19%, with a point estimate of 11% and a defect rate of 2%. Using the rule in this chapter, what is the decision, and what would you do next?
Show answer
Adjust. Guardrails are within limits and the best plausible effect (19%) is above the floor, so it is not a stop. But the lower bound (3%) does not meet the 10% target, so the evidence is not strong enough for a go. The point estimate of 11% looks good, but the interval is wide. Extend the pilot to collect more data under the same rules, or refine the change if the data point to a specific weak step, then decide again.
Exercise
A pilot cuts cycle time by 20%, comfortably beating the target, but the defect rate is 4.5% against a limit of 3%. A sponsor says the speed gain is so large that the guardrail should be relaxed. What should you do?
Show answer
Stop and roll back, as the rule requires. A guardrail breach overrides any improvement in the target metric. If the sponsor believes the limit was set wrongly, they can sign a written override with a reason, but the better path is to treat the result as input for a redesigned change that keeps the speed gain without the defects, tested in a new pilot.