Sub topic 5
Choose a representative scope
This chapter assumes you can already compute a mean and read a spread, and that you have worked on a team with a defined process. It also assumes you have written a hypothesis and success criteria, and that you know when a pilot is a better choice than a phased or full rollout. Here you decide where the pilot runs: which site, team, product types, shifts, and time window. Later chapters cover the comparison design and sample size.
Why scope decides what the pilot can prove
A pilot succeeds or fails on one question: will the result still hold when the change reaches everyone? The scope you choose limits that answer. If you pilot in the best-run team on the quietest line, a good result tells you the change works there, and little else.
A representative scope is a slice of the process whose conditions resemble the conditions of the full rollout. It is not a random slice, and it is not the most convenient one. It is a slice you can defend as a fair stand-in for the whole.
Two risks pull in opposite directions:
- Too easy: the pilot passes, then the full rollout fails on conditions the pilot never met.
- Too hard: the pilot fails on a problem that affects only one unusual site, and you reject a change that would have worked almost everywhere.
Your job is to reduce both risks, and to write down which one you are still carrying.
Define the boundaries first
Before you compare candidate sites, write the scope as a precise boundary. A vague scope such as "the Dallas team" lets work leak in and out, which damages the data later.
State each of these:
- Process steps in scope. Which start and end points does the change touch?
- Work types in scope. Which products, request types, or customer segments?
- People in scope. Which roles, shifts, and named teams?
- Systems in scope. Which tools, forms, or equipment carry the changed process?
- Time window. Which start date, and what calendar events fall inside it?
- Exclusions. What is deliberately left out, and why?
Also decide how work is assigned to the pilot. If a new order type can be routed to either the old or the new process, you need a rule for who decides. Without a rule, people send the easy cases to the new process.
The dimensions that make a scope representative
Most processes vary along a few dimensions that change cycle time, defects, or both. List the ones that matter for your process, then check that the pilot covers the main values of each.
| Dimension | What to check | What goes wrong if ignored |
|---|---|---|
| Work mix | Share of standard, rush, and custom work | A pilot on standard work hides trouble with exceptions |
| Volume and load | Typical and peak demand | A change that works at low load can collapse at peak |
| Staffing and experience | Mix of new and senior people | A team of experts masks training needs |
| Shift or time of day | Day, night, weekend coverage | Night shift may have less support and different habits |
| Equipment and systems | Versions, locations, integrations | A tool difference can break the changed steps |
| Upstream and downstream | Who feeds and receives the work | The change moves a delay to the next team |
| Local rules | Regulation, customer contracts | A rule may block the change elsewhere |
You will not cover every dimension with one site. Rank them by how strongly they affect the metric in your success criteria, and cover the top few. Your baseline data helps here. If cycle time differs sharply by shift, shift must be in the scope.
Check representativeness with data
Do not judge representativeness by impression. Compare each candidate's profile with the whole organization's profile, using the baseline data you collected.
The script below measures how far each site's work mix is from the overall mix. The distance is half the sum of the absolute differences in share, which ranges from 0 (identical) to 1 (completely different).
overall_mix = {"standard": 0.60, "rush": 0.25, "custom": 0.15}
sites = {
"Site A": {"standard": 0.62, "rush": 0.23, "custom": 0.15},
"Site B": {"standard": 0.90, "rush": 0.08, "custom": 0.02},
"Site C": {"standard": 0.45, "rush": 0.30, "custom": 0.25},
}
def mix_distance(site_mix, overall):
"""Half the sum of absolute share differences: 0 is identical, 1 is disjoint."""
return 0.5 * sum(abs(site_mix.get(k, 0.0) - share) for k, share in overall.items())
ranked = sorted(sites.items(), key=lambda item: mix_distance(item[1], overall_mix))
for name, mix in ranked:
print(f"{name}: distance {mix_distance(mix, overall_mix):.2f}")The output is:
Site A: distance 0.02
Site C: distance 0.15
Site B: distance 0.30Site A mirrors the whole. Site B is mostly standard work, so it would flatter a change that struggles with rush or custom orders. Site C leans toward harder work and could understate the benefit.
Work mix is only one dimension. Repeat the check for others, such as shift pattern or staffing level, then look at the results together. A site that is close on mix but far on staffing is still a weak choice.
Choose among the options
The realistic choices are a single typical site, a deliberately varied small set of sites, or a slice of work types across one site.
- One typical site. Cheapest and easiest to control. It is the right choice when the process is uniform across the organization and one site matches the average.
- Two or three contrasting sites. Choose one typical site and one that is harder in a way you named, such as a high-exception site. You learn how far the result transfers. Cost and coordination rise.
- A slice within one site. Use this when sites differ little but work types differ a lot. Pilot the change on selected work types or shifts, and keep the others on the old process.
The diagram shows one way to move from the hypothesis to a scope decision.
Containment and support
A scope must also be practical. Check these before you commit:
- Containment. Can the pilot process run without disturbing work outside the scope? If pilot orders share a queue or a machine with other orders, define how they are separated.
- Handoffs. If the pilot team passes work to a team outside the pilot, agree on how that team will receive it. A changed output format can cause errors downstream that you wrongly blame on the change.
- Local leadership. A supervisor who supports the change and will follow the plan matters more than a perfect statistical match. A site with a hostile supervisor will produce noisy data and poor adherence.
- Support capacity. Someone must be available to answer questions, fix tooling, and watch the metrics.
Selection bias and how it enters
Selection bias happens when the way you choose the scope makes the result look better or worse than it should. It usually enters through good intentions.
- Volunteer bias. Teams that volunteer are usually more motivated and better organized. Their results will not transfer to a team that was told to adopt the change.
- Showcase bias. Managers offer their strongest team. The baseline is already high and the room for gain is small, or the team succeeds with any change.
- Convenience bias. The site nearest the project team is chosen because it is easy to visit.
- Timing bias. The pilot runs in a quiet month, or one with an unusual event, and the result reflects the season.
- Cherry-picked work. People route easy cases to the new process.
You cannot remove these biases entirely, but you can reduce them. Pick the scope with a written rule, such as "closest to the organization average on work mix and staffing", rather than by who asks. If you must use a volunteer site, record that fact and treat the result as an upper bound.
Size the scope to the question
A scope that is too small gives too few observations to separate a real change from noise. A scope that is too large exposes too much of the business if the change goes wrong and is slow to stop. Use these rules of thumb:
- Make it large enough to collect the sample you will plan in the sizing chapter within a reasonable time.
- Make it small enough that the rollback plan, set later, can restore the old process within a shift or a day.
- Prefer scope you can add to over scope you must remove. You can widen a safe pilot, but you cannot take back a bad change that has already spread.
Document the decision
Record the scope in a short note that the team, the sponsor, and the analyst all see. Include the boundary, the dimensions you checked, the candidates you rejected and why, the known biases, and the sentence about what the result will apply to. When results arrive, this note tells you how far to trust them.
Exercise
Your company has three distribution centers. Center 1 handles 85% standard orders and has the most experienced staff, and its manager has volunteered for the pilot. Center 2 matches the company-wide order mix and staffing level but is 200 km from the project team. Center 3 handles mostly custom orders. You want a reading that predicts the full rollout. Which center would you choose as the main pilot site, and what is one risk you would record?
Show answer
Choose Center 2 as the main site, because it matches the company-wide mix and staffing, which is what makes a result transferable. Distance is a cost you can manage with remote support or a visit schedule. Center 1 is a volunteer site with an easy mix and experienced staff, so its results would likely overstate the benefit. Record risks such as that Center 2 may lack the local support the project team can give nearby, or that the result may not transfer to the custom-heavy Center 3. If the budget allows, add Center 3 as a contrasting second site.