Sub topic 4
The few symbols you need
This chapter covers the small set of symbols you need to draw a swimlane diagram for improvement work. It assumes you have read the earlier chapters on scope and lanes. You should already know your process trigger, your end point and which roles, teams or systems get lanes. It also assumes you know basic flowchart ideas such as boxes and arrows, and the difference between processing time and waiting time.
Why a small symbol set matters
Flowchart standards define dozens of shapes. Most of them add nothing to an improvement map. A map is useful when the people who do the work can read it in a minute and spot what is wrong. Each extra symbol is something they must learn first.
Four symbols cover almost every process map:
| Symbol | Shape | Meaning | Label style |
|---|---|---|---|
| Start/end | Rounded box (stadium) | Where the process begins or ends | Event or state, such as "Request received" |
| Activity | Rectangle | A step someone performs | Verb plus object, such as "Review request" |
| Decision | Diamond | A question with two or more exits | A question, such as "Information complete?" |
| Flow | Arrow | The order of steps, and who the work passes to | Usually unlabeled, except on decision exits |
Everything else is optional. Add a symbol only when your audience needs it to understand the map, and define it in a legend on the same page.
Start and end
The start symbol marks the trigger you set in the scope chapter. The end symbol marks the outcome. Both go in the lane of the actor who experiences them. A customer request usually starts in the Customer lane. It often ends there too, when the customer receives the result.
Some rules keep these symbols honest:
- Every map has exactly one start unless the process has several real triggers. If it does, draw one start per trigger and say so in the title or legend.
- Use separate end symbols for different outcomes. "Request fulfilled" and "Request rejected" are different endings, and the difference matters when you count volumes later.
- Name starts and ends as events or states ("Invoice received"), not as actions ("Receive invoice"). That keeps them visually and verbally distinct from activities.
- Do not let arrows leave an end symbol. If you want to show that a process continues somewhere else, end this map and name the next process in the label.
Activities
An activity is one unit of work done by one actor. Put it in that actor's lane. If you cannot tell which lane a step belongs to, you have probably combined two steps, or the step is a handoff in disguise.
Label activities with a verb and an object: "Check stock", "Approve discount", "Enter order". Avoid vague labels such as "Handle request" or "Process". They hide the detail you need for improvement work. Avoid labels that name a department, such as "Finance". The lane already gives you that.
How much detail belongs in one box? A practical test is that one box should be one continuous stretch of work by one person or system, without a wait in the middle. If the person finishes part of a task, puts it in a queue, and returns later, that is two activities with a wait between them. This matters because the wait is usually where the delay is, and it only becomes visible if the boxes are split.
Aim for a consistent level of detail. A map that mixes "Fulfill order" (an hour of work) with "Press Enter" (a second) is hard to measure and hard to read. For a first map, 10 to 25 activities is a typical range. If you need more, consider mapping a sub-process on its own page.
Decisions
A decision is a point where the path splits depending on a condition. Draw it as a diamond in the lane of the actor who decides, and label it as a question that has clear answers.
- Label every exit. "Yes" and "No" are the most common labels. Use named outcomes ("Approved", "Rejected", "Needs changes") when there are more than two.
- Keep the question answerable from the inputs available at that step. "Is the customer happy?" is not a decision a reviewer can make. "Does the request include a signed form?" is.
- Use one entry and several exits. Merge flows into an activity box or a later step, not into the diamond.
- Place decisions in the lane of whoever actually makes the call. If the Support agent asks the manager and waits, that is a handoff to the Manager lane, with a decision there.
Decisions are also where rework loops begin. An arrow that leaves a decision and returns to an earlier step shows that work is repeated. Later chapters count those loops, so draw them explicitly instead of leaving them implied.
Flow arrows
Arrows show sequence. A few conventions make them readable:
- Flow runs left to right or top to bottom, consistently across the page.
- An arrow that stays inside a lane is work continuing with the same actor.
- An arrow that crosses a lane boundary is a handoff. The next chapters on handoffs rely on this, so keep these crossings visible and do not hide them behind routing tricks.
- Avoid crossing arrows where you can. If two arrows must cross, check whether a step is in the wrong lane or the layout needs rearranging.
- Use one line style for the normal flow. If you add dashed lines for information or messages, say so in the legend.
A diagram with the four symbols
The Mermaid flowchart below uses all four symbols. Lanes are drawn as subgraphs, a stadium shape marks starts and ends, rectangles are activities, and the diamond is a decision.
Notice that the "No" arrow leaves Support and returns to the Customer lane. That crossing is a handoff and also a rework loop. Even in this tiny map, the symbols show where the process doubles back.
The same map as text
Text-based tools let you keep the map in version control and edit it quickly. In PlantUML, a line such as |Support| switches the current lane, so the lanes follow from the order of the text.
@startuml
|Customer|
start
:Submit request;
|Support|
:Review request;
if (Information complete?) then (yes)
|Fulfillment|
:Process request;
|Customer|
:Receive result;
stop
else (no)
|Support|
:Request missing information;
stop
endif
@endumlThis version differs in one respect. The "no" branch ends the diagram after a request for missing information, rather than looping to the customer. Neither choice is wrong. The Mermaid version shows rework as a loop. The PlantUML version treats the request for information as a separate ending. Pick the one that matches what actually happens, and be consistent within a single map.
Optional symbols, and when to add them
Some processes need more than the core four. Add these only when the map would mislead without them:
- Wait or queue marker. A triangle or a labeled box such as "Wait: approval queue". Use it once you start measuring wait time. It makes delays visible instead of hiding them in an arrow.
- Document or data store. A page or cylinder shape for forms, files or databases. Use it if the question is where information is kept or re-entered.
- Connector. A small circle with a letter, for continuing a flow on another page. Prefer splitting the process into sub-processes instead.
- Parallel split and join. A bar, or a diamond marked "+" in BPMN, when two activities truly happen at the same time.
- Annotation. A note attached to a step, which later chapters use for time and error data.
If you adopt BPMN, the symbols above map onto its events, tasks and gateways. The four-symbol core still holds: events are the rounded starts and ends, tasks are the activities, and gateways are the decisions.
Common symbol mistakes
| Mistake | Why it hurts | Fix |
|---|---|---|
| A decision with only one exit | Hides the exception path | Add the other exit, even if it ends the process |
| Unlabeled decision exits | Readers guess which branch is normal | Label every exit |
| An activity box spanning two lanes | Obscures who does the work | Split it into one box per actor |
| A box named after a team | Duplicates the lane and says nothing about the work | Use verb plus object |
| Several arrows entering a box with no explanation | Looks like a merge but may hide a missing decision | Check whether the arrows come from different branches |
| Mixing detail levels | Makes measures incomparable | Pick one level per map |
| Decorative colors or icons | Readers assume color carries meaning | Use color only for a stated purpose, such as highlighting rework |
Applying the symbols: a short worked check
Take this sentence from an interview: "The agent looks at the order, and if something's off, calls the customer and waits for a reply, then gets a manager to approve it."
Break it into symbols:
- Activity in the Agent lane: "Review order".
- Decision in the Agent lane: "Order correct?"
- On "No", activity in the Agent lane: "Call customer". A wait follows, which you may mark.
- Handoff to the Manager lane: activity "Approve order".
- On "Yes", the flow continues to the next step in its own lane.
The single sentence contained one decision, two handoff candidates and a wait. Reading text this way, one symbol per phrase, is the fastest way to turn an interview into a draft map.
Exercise
A step in your draft map is labeled "Finance handles invoice" and sits across the Finance and Procurement lanes. List three problems with this box and say how you would redraw it.
Show answer
First, "Finance handles invoice" names a team rather than a verb plus object, and the lane already says Finance. Second, the box spans two lanes, so it hides who does what. Third, "handles" is vague and probably hides several steps and waits. Redraw it as separate activities, each in one lane, such as "Match invoice to purchase order" (Finance) and "Confirm goods received" (Procurement). Draw the arrow between them as a visible handoff.
Exercise
You have a decision diamond labeled "Approved?" with one exit labeled "Yes" that leads to "Ship order". What is missing, and why does it matter for improvement work?
Show answer
The "No" exit is missing. It matters because the rejection path is where rework, delay and extra handoffs occur. Without it you cannot count how often work loops back or measure its cost. Add the exit and show where it goes, such as back to "Revise order" or to an end symbol "Order rejected".