Sub topic 12
Notation and Tool Choices for Swimlane Diagrams
This chapter assumes you can already draw a basic swimlane map. You know the symbols (start/end, activity, decision, flow), you have chosen lanes, and you have mapped a normal path with a few rework loops. The question here is which notation and which tool to use, and what each choice costs you later.
Why the notation choice matters
The notation decides who can read your map and how easily it can be changed. A map that only its author can read, or one that nobody dares to edit, stops being used. A map drawn in the wrong tool can also hide the facts you need: lane ownership, waiting time, and the point where work crosses from one actor to another.
There are three common choices:
- Informal flowchart-style swimlanes, with the few symbols from earlier chapters.
- BPMN (Business Process Model and Notation), a formal standard maintained by the Object Management Group.
- Text-based diagrams, where you write a description and a program draws the picture.
None of these is the correct one. Choose by the purpose of the map, the audience, and how often the map will change.
Informal swimlanes
Informal swimlanes use rectangles for activities, diamonds for decisions, rounded shapes for start and end, and arrows for flow. Lanes are horizontal or vertical bands labelled with the actor.
Strengths:
- A workshop group can read it in a minute without training.
- You can draw it on a whiteboard or with sticky notes on a wall.
- It focuses attention on the improvement question instead of on notation rules.
Weaknesses:
- Different authors use symbols differently, so two maps of the same process may not be comparable.
- There is no rule for how to show waiting, messages between teams, or parallel work, so each author invents a convention.
- The map cannot be run through a simulator or a process engine.
For a first current-state map in an improvement project, informal swimlanes are usually the right choice. You are trying to see the process, not to specify it.
BPMN lanes
BPMN is a standard with a large symbol set. You do not need all of it. A small subset covers most improvement work.
Pools and lanes
BPMN has two nested containers. A pool represents a participant, usually an organisation or a major role. A lane is a subdivision inside a pool, usually a team or role. Swimlane diagrams in BPMN are therefore pools divided into lanes.
The difference matters when a process crosses an organisational boundary. Inside one pool, work moves by sequence flow (a solid arrow). Between two pools, work moves by message flow (a dashed arrow), because the two parties do not share one controlled process. If your customer is a separate pool, the request they send is a message, not a step in your sequence.
The useful subset
| BPMN element | Looks like | Use it for |
|---|---|---|
| Start event | Thin circle | The trigger of the process |
| End event | Thick circle | The outcome, including failed outcomes |
| Task | Rounded rectangle | One unit of work by one actor |
| Exclusive gateway | Diamond with an X (or empty) | A decision with one path taken |
| Parallel gateway | Diamond with a plus | Work that happens at the same time |
| Sequence flow | Solid arrow | Order of work inside a pool |
| Message flow | Dashed arrow with open circle | Communication across pools |
| Timer event | Circle with a clock | A deliberate wait or deadline |
| Data object | Page with folded corner | A document or record passed along |
Events are the main addition compared with an informal map. A start event can be a message arriving, a timer firing, or a plain trigger. An intermediate timer event gives you a standard way to show a wait, which is exactly what you need when you annotate delay.
When BPMN is worth it
Use BPMN when:
- The map will become the specification for automation or a workflow engine.
- Several teams or an external audit need an unambiguous reading.
- You model interactions between organisations, where message flow matters.
- Your organisation already uses BPMN, so people can read it.
Avoid it for a one-off workshop with operators who have never seen it. If half the room is asking what the X in the diamond means, the notation is costing more than it gives.
Common BPMN errors
- Using sequence flow between pools. Across a pool boundary, use message flow.
- Several arrows leaving a task without a gateway. In BPMN this means all of them run in parallel. If you meant a choice, add an exclusive gateway.
- Missing end events. Every path, including the rejection path, should finish at an end event.
- Tasks named as nouns. Write "Review request", not "Request review step".
- One huge pool with fifteen lanes. Split the map or raise the level of detail.
Text-based diagrams
A text-based diagram is a plain text file that a tool renders into a picture. Two common languages are PlantUML and Mermaid. Both can express swimlanes, though in different ways.
PlantUML activity diagrams
PlantUML has real swimlane support. A line such as |Support| switches to that lane, so every step after it sits in that lane until the next switch.
@startuml
|Customer|
start
:Submit request;
|Support|
:Review request;
if (Information complete?) then (yes)
|Fulfillment|
:Process request;
|Customer|
:Receive result;
stop
else (no)
|Support|
:Request missing information;
stop
endif
@endumlEach time the lane marker changes between two steps, the arrow crosses a lane boundary. These crossings are your handoffs, so you can count them straight from the source text by counting lane switches along a path.
Mermaid flowcharts with subgraphs
Mermaid does not have a native swimlane type. You approximate lanes with one subgraph per actor. The layout engine decides where the boxes go, so the groups may not form clean parallel bands. The grouping still shows who owns each step.
flowchart TB
subgraph Customer
A([Submit request])
F([Receive result])
end
subgraph Support
B[Review request]
C{Information complete?}
end
subgraph Fulfillment
D[Process request]
end
A --> B
B --> C
C -- Yes --> D
C -- No --> A
D --> FHere the "No" branch returns to the customer so the rework loop is visible. Compare it with the PlantUML version, which ends the "No" path at the support lane. They describe slightly different processes. This is a reminder that the diagram records a modelling decision, and you should make that decision on purpose.
Why use text at all
Text diagrams have practical advantages for improvement work:
- Version control. A text file can be stored in Git. A diff shows exactly which step or lane changed between the current state and the future state.
- Fast edits. Moving a step between lanes is a one-line change, with no dragging of boxes and no redrawing of arrows.
- Consistency. The renderer applies the same shapes and spacing every time.
- Review. People can comment on changes the same way they comment on code.
The costs are real too:
- Layout control is limited. A dense map may render with crossing arrows that you cannot easily fix.
- Non-technical participants may be unwilling to edit the source.
- Annotations such as times and volumes can be awkward to place.
- Rendering features differ between tools and versions, so check that your viewer supports the syntax you use.
Comparing the options
| Criterion | Whiteboard or sticky notes | Drawing tool (visual editor) | BPMN modelling tool | Text-based |
|---|---|---|---|---|
| Speed in a workshop | Highest | Medium | Low | Low to medium |
| Easy for non-experts to edit | Yes | Yes | Needs training | Usually no |
| Precise notation rules | None | None | Strict | Depends on language |
| Change history | Photos only | File versions | Model versions | Full diff history |
| Executable or simulatable | No | No | Often yes | Rarely |
| Layout control | Total | High | Medium | Low |
A common pattern combines them. Draw the current state on a wall with the people who do the work. Photograph it and redraw it in a drawing tool for the project report. If the improved process will be automated, convert the future-state map to BPMN.
Choosing: decision criteria
Ask these questions in order:
- Who must read it? If operators and managers with no training, use informal swimlanes.
- Will it drive automation? If yes, use BPMN so the model can map to an engine.
- Does it cross organisations? If yes, use BPMN pools and message flow, or at least separate groups clearly.
- How often will it change? If often, and your team is comfortable with text, store a text-based diagram in version control.
- Do you need to compare current and future state? Use the same notation and the same lane names for both, so the differences are real changes and not drawing differences.
The last point applies whatever tool you pick. Keep the same lane names, step wording, and level of detail across versions.
Showing measures in each notation
Earlier chapters added processing time, wait time, and error rate to steps. Each notation has a different place for them:
- Informal: write the numbers under or beside each box, for example "PT 10 min, WT 2 days".
- BPMN: put the numbers in task documentation or properties, and use a timer event for waits. Many tools can also read these properties for simulation.
- PlantUML: add text to the activity label with a line break, or use a
note rightafter the step. - Mermaid: add the numbers inside the node label. Keep them short, because long labels distort the layout.
Whichever you choose, apply the same format to every step. A map where only some steps carry numbers invites wrong conclusions.
Keeping the notation proportionate
A more formal notation does not make a map more accurate. Accuracy comes from walking through the process with the people who do it. A well-validated informal map beats an unvalidated BPMN model. Pick the lightest notation that your audience can read and that supports what you will do with the map next.
Exercise
A PlantUML swimlane diagram has this path: |Customer| Submit request, |Support| Review request, |Fulfillment| Process request, |Support| Approve result, |Customer| Receive result. How many handoffs does this path contain, and which notation feature in BPMN would you use if the Customer were an external company rather than a lane in your own organisation?
Show answer
There are four handoffs, one at each lane switch: Customer to Support, Support to Fulfillment, Fulfillment to Support, and Support to Customer. If the customer were an external company, you would model the customer as a separate pool and show the request and the result as message flow (dashed arrows) instead of sequence flow.
Exercise
Your team will run a two-hour workshop with warehouse operators to map the current state of a returns process. Afterwards, the improvement team wants to keep the future-state map in the same repository as other project documents and review changes. Which notations or tools would you use for each stage, and why?
Show answer
For the workshop, use informal swimlanes on a whiteboard or with sticky notes, because the operators can read and edit them immediately with no training. For the future-state map, a text-based diagram (PlantUML or Mermaid) stored in the repository fits the review need, because a diff shows exactly which steps or lane assignments changed. Keep the lane names and step wording the same as in the current-state map so that the comparison shows real process changes.