Sub topic 6
Assessing Power, Influence and Impact
This chapter assumes you can already name the stakeholders on a project and have a draft stakeholder register with a row for each one. It also assumes you know what a sponsor, a project manager and a team member do. Here you will learn to rate how much each stakeholder can affect the project and how much the project affects them. The next chapter uses those ratings to place stakeholders on a power/interest grid.
Three Words That Are Easy to Confuse
Project teams often use "power", "influence" and "impact" as if they meant the same thing. They are different measurements, and mixing them up produces bad ratings.
| Term | What it measures | Direction | Example |
|---|---|---|---|
| Power | The ability to make or block a decision, or to control resources | Stakeholder over project | A sponsor who can cancel funding |
| Influence | The ability to shape opinions and decisions without formal authority | Stakeholder over project, often informal | A senior engineer whom the architect always consults |
| Impact | How much the project's outcome changes the stakeholder's work or life | Project over stakeholder | Call-center staff whose workflow is replaced by a new tool |
Power is usually granted by the organization or by law. Influence is earned through trust, expertise or relationships. Impact does not depend on either. A group can be heavily affected and have no say at all.
Interest is a related idea, and the next chapter covers it. Interest is how much a stakeholder cares about the project. Impact is how much the project changes their situation. They usually move together, but not always. A person can be heavily affected and not know it yet.
Where Power Comes From
Ask what could this person do to the project, not what their title is. Power usually comes from one or more of these sources:
- Formal authority: approving the budget, signing off on scope, or firing the project manager.
- Control of resources: owning the people, servers, money or office space the project needs.
- Legal or regulatory standing: being able to stop a launch, impose fines or require an audit.
- Expertise: knowing something the project cannot do without, such as how a legacy system works.
- Control of information: deciding what reaches executives or customers.
- Relationships: having the ear of someone who holds formal authority.
- Ability to disrupt: being able to refuse to adopt the product, strike or complain publicly.
The last item matters most for intermediate practitioners. A stakeholder with no formal authority can still sink a project by refusing to use what you deliver. Rating only formal authority is the most common reason users end up with a power rating of 1 when their real effect on success is large.
A Rating Scale You Can Defend
The register in this tutorial rates power and interest from 1 (low) to 5 (high). Use the same scale for impact and influence. A scale is only useful if two people would give the same stakeholder the same number, so write down what each level means.
| Rating | Power (can decide or block) | Impact (is changed by the outcome) |
|---|---|---|
| 1 | Cannot affect decisions | Barely notices the outcome |
| 2 | Can complain or delay informally | Small change to routine tasks |
| 3 | Can slow the project or change a part of it | Noticeable change to part of their work |
| 4 | Can change scope, schedule or budget | Major change to their daily work |
| 5 | Can approve, cancel or legally block the project | Role, livelihood or compliance status changes |
Keep the table with the register and cite it when someone disputes a rating. Disputes then become a conversation about the anchors rather than about opinions.
Rate Using Evidence
A rating is a claim about the world, and you should be able to say what supports it. Useful evidence includes:
- The organization chart and approval documents. These show who signs off on what. Check the project charter, the budget approval path and the change-control process.
- Past projects. Ask who stopped or delayed similar work before.
- Interviews. Ask "Who else would need to agree to this?" and "Whose objection would worry you?". The answers often reveal informal influencers.
- Contracts and regulations. These show where legal power sits, which is often outside the organization.
- Observed behavior. Notice whose opinion changes the room when it is spoken in meetings.
Record the evidence next to the number, in a notes column. When the rating changes later, you can see why it was set.
Adding Impact to the Register
The register from the stakeholder-register chapter has power and interest columns. A practical extension adds influence and impact columns, because power alone hides informal control and affected groups. The script below stores the ratings and flags rows that deserve a closer look.
import csv
import io
REGISTER = """name,role,power,influence,impact
Dana Lee,Executive sponsor,5,4,4
Sam Ortiz,Customer support lead,2,4,4
Acme Regulators,Compliance authority,5,2,3
End users,Daily users of the product,1,2,5
"""
def review(row):
power = int(row["power"])
influence = int(row["influence"])
impact = int(row["impact"])
notes = []
if impact - power >= 3:
notes.append("heavily affected with little formal power: add a feedback channel")
if power - influence >= 3:
notes.append("holds authority but rarely uses it: learn what would trigger it")
return notes
for row in csv.DictReader(io.StringIO(REGISTER)):
notes = review(row)
print(f"{row['name']}: {'; '.join(notes) if notes else 'no flags'}")Running it prints:
Dana Lee: no flags
Sam Ortiz: no flags
Acme Regulators: holds authority but rarely uses it: learn what would trigger it
End users: heavily affected with little formal power: add a feedback channelThe two rules encode patterns that experienced project managers watch for.
- High impact, low power. These people carry the consequences of decisions they cannot shape. Ignoring them leads to resistance at rollout. End users in the example fit this pattern.
- High power, low influence in practice. A regulator may do nothing for months and then halt a launch in one letter. Dormant power is still power. You need to know the conditions that wake it, such as a missing audit trail.
The thresholds of 3 are a starting point. If your scale or organization differs, change them and keep the rule readable.
The Assessment Flow
The following diagram shows how the pieces fit together for one stakeholder.
Edge Cases and Judgment Calls
Groups Are Not Individuals
"End users" is one row in the example, but a group can contain people with very different positions. A power user who trains colleagues has more influence than a casual user. When a group's members differ a lot, split the row, for example into "Power users" and "Occasional users". Rate a group by its most important members only if you are sure they speak for the others, and say so in the notes.
Power Differs by Decision
Someone can hold high power over one kind of decision and none over another. A finance manager may decide the budget and have no say on the design. Where it matters, note which decision the rating applies to. If you must give one number, rate the decision that most threatens the project's success.
Power Changes With Project Phase
During planning, the sponsor and architects hold most of the power. During testing, the quality team may gain it. At launch, operations and support can delay go-live. A rating assigned in month one will be out of date by month six. Treat each rating as a snapshot, and review it at phase boundaries.
Proxies and Gatekeepers
Sometimes the real decision-maker is hidden behind an assistant, a committee or a vendor contact. The gatekeeper's power over access is real even when the formal authority sits elsewhere. Rate both, and add the link between them in the notes.
Positive and Negative Direction
A rating of power says how much someone can affect the project, not whether they will help or hinder. A supportive executive and a hostile one can both have power 5. Record their attitude separately, in the expectations or notes columns, because it changes the strategy later.
Ratings Are Sensitive
A register that says "low influence" next to a named colleague can cause harm if it leaks. Store the register where only the project team can read it, and write notes in neutral, factual language.
Common Errors
- Treating power as a stand-in for importance. A low-power group such as end users can still determine whether the project succeeds. Use impact and the ability to disrupt to catch this.
- Using different scales. If one reviewer treats 3 as "average" and another treats it as "serious", the grid in the next chapter will mislead. Share the anchor table.
- Rating once and filing it away. Ratings go stale as people move, budgets change and the project advances.
- Rating what you hope instead of what you know. Wishful low ratings for difficult stakeholders hide real risks. Back every rating with a piece of evidence.
- Confusing attitude with power. A friendly stakeholder with no authority does not outrank a neutral one who controls the budget.
- Skipping the people affected. Teams that ask only "Who can stop us?" miss those who will live with the result. Always ask both questions: "Who can affect us?" and "Who do we affect?"
Summary of the Method
- Define the scale with written anchors for power and impact.
- For each register row, list the sources of power and rate power from 1 to 5.
- Rate influence from interviews and observation, including informal channels.
- Rate impact by asking how much the outcome changes the stakeholder's work.
- Record evidence and the decision the rating applies to.
- Check for mismatches and add actions to the register.
- Schedule a re-rating at each phase boundary.
Exercise
A hospital is replacing its patient scheduling software. The nurses who book appointments have no budget authority and no formal say in vendor selection. They will, however, use the system for six hours a day, and past tool changes failed when nurses kept using paper. Rate the nurses' power, influence and impact on a 1 to 5 scale, and say what action the mismatch calls for.
Show answer
A reasonable rating is power 2, influence 3 and impact 5. Power is low because they cannot approve or cancel the project, but they can disrupt it by refusing to adopt the tool, which is why it is not 1. Influence is moderate because senior nurses are listened to by managers and shape how colleagues feel about the tool. Impact is 5 because their daily work changes completely. Impact minus power is 3, so the mismatch rule fires. The action is to add a feedback channel, such as nurse representatives in design reviews and usability testing, and to involve them before rollout.
Exercise
A regulator has power 5 on your project but has not contacted you in eight months. A teammate suggests lowering the power rating to 2 because "they never do anything." Do you agree? What should you do instead?
Show answer
No. Power is the ability to decide or block, not how often it is used. The regulator can still halt the launch, so the rating stays at 5. Influence in practice may be low, which the register can show in the influence column. The useful action is to find out what would trigger the regulator, such as missing documentation or an audit deadline, and to plan to meet those conditions. Record the trigger and the evidence in the notes.