Sub topic 10
Training the People Who Run the Process
This chapter assumes you understand the DMAIC phases, process variation, critical-to-quality (CTQ) characteristics, and basic run or control charts. The Control phase does not succeed when only the project team understands the improved process. The people who perform and supervise the work must be able to follow the new method, detect abnormal results, and act according to the reaction plan.
Training Is Part of Process Control
Training is a control because it reduces variation caused by differences in how people perform the work. It also transfers practical knowledge from the project team to the process owner and operators.
Training should answer four questions:
- What is the new standard method?
- Which characteristics must be monitored?
- What does an abnormal signal look like?
- What action must the employee take, and who must be informed?
A document alone is not proof of competence. A person may have received a presentation without being able to perform the task correctly. Use demonstration, supervised practice, and a recorded check of understanding.
Convert Improvements into Standard Work
Standard work is the current agreed method for completing a process task. It should describe the sequence, important conditions, quality checks, and response to problems.
For each changed step, identify:
- The purpose of the step.
- The required inputs and equipment.
- The correct sequence of actions.
- The CTQ characteristic or metric affected.
- The allowable range or specification.
- The action required when the result is outside the expected condition.
- The role responsible for escalation.
Training material should match the released standard work. If the work instruction, control plan, and training slides disagree, employees receive conflicting instructions and the process can quickly regress.
A useful training session combines explanation with practice:
- The trainer explains why the change was made and demonstrates the standard.
- The learner performs the task using a realistic case or sample.
- The learner identifies the relevant control and describes the reaction plan.
- The trainer observes performance against a checklist.
- The process owner records qualification or assigns follow-up coaching.
training_records = [
{"name": "Amina", "standard_work": True, "reaction_plan": True},
{"name": "Luis", "standard_work": True, "reaction_plan": False},
{"name": "Mei", "standard_work": True, "reaction_plan": True},
]
for record in training_records:
qualified = record["standard_work"] and record["reaction_plan"]
status = "qualified" if qualified else "follow-up required"
print(f"{record['name']}: {status}")Transfer Knowledge to the Process Owner
The process owner accepts accountability for maintaining the improved condition after project closure. Training must therefore include supervisors, backup owners, new employees, and anyone who responds to an out-of-control signal.
The project team should provide:
- The approved standard work.
- The control plan and current monitoring method.
- The reaction plan, including escalation contacts.
- Training records and qualification criteria.
- A schedule for refresher training.
- A list of open risks or temporary controls.
The process owner should demonstrate that they can explain the controls, review the records, and initiate the reaction plan. This demonstration is stronger evidence than a signature alone.
Use a Training-to-Handover Check
Training is complete when the process owner can sustain the control without relying on the project team. A handover review can follow this sequence:
flowchart TD
A[Release standard work] --> B[Explain process changes]
B --> C[Demonstrate the task]
C --> D[Operator practices]
D --> E[Verify competence]
E --> F[Owner reviews reaction plan]
F --> G[Record acceptance and schedule follow-up]The follow-up review should check whether employees follow the standard, records are complete, and reaction actions occur within the stated time. Use early audits to find gaps before they become process regression.
Exercise
A new approval workflow is live, but supervisors have only received the updated procedure by email. What additional evidence is needed before handover?
Show answer
Supervisors should demonstrate the workflow, identify the controlled metric, explain the reaction plan, and have their competence recorded. The process owner should also confirm that backup staff are trained and that follow-up audits are scheduled.