What this chapter assumes
You should already know the DMAIC phases, the difference between common-cause and special-cause variation, and the meaning of a critical-to-quality characteristic. You should also be able to read a basic run chart or control chart.
The Control phase depends on trustworthy measurements. A control chart cannot distinguish process change from measurement error. If the measurement method changes, the data may show a false shift even when the process stayed the same.
Define the measurement before collecting data
An operational definition states exactly what is measured, where the measurement starts and ends, which units are used, and how exceptions are handled.
For example, “invoice approval time” is not precise enough. A useful definition might be:
- Start time: the timestamp when a complete invoice enters the approval queue.
- End time: the timestamp when the final approval is recorded.
- Unit: elapsed calendar days, rounded to one decimal place.
- Exclusions: test invoices and invoices later cancelled.
- Missing values: reported separately and investigated.
This definition prevents different people from measuring different versions of the same characteristic.
| Measurement element | Example for invoice approval time |
|---|---|
| Characteristic | Approval cycle time |
| Operational definition | Time from queue entry to final approval |
| Unit | Calendar days |
| Data source | Workflow system timestamps |
| Exception rule | Exclude test and cancelled invoices |
| Owner | Accounts Payable team lead |
A good definition also identifies the decision the measurement supports. If the team must react when approval exceeds three days, the method must capture every invoice consistently enough to detect that condition.
Check the measurement system
A measurement system includes the instrument, software, data collection method, people, and rules used to produce a value. Reliability has several dimensions:
- Repeatability is the agreement when the same person measures the same item repeatedly.
- Reproducibility is the agreement when different people measure the same item.
- Bias is the average difference between the measurement and a trusted reference.
- Stability is the consistency of the measurement system over time.
- Resolution is the smallest change the system can meaningfully detect.
For physical measurements, a gage repeatability and reproducibility study may be appropriate. For transactional data, inspect timestamp rules, system configuration, data joins, and manual overrides instead. The method should match the data source.
A measurement system can also be precise but wrong. For example, a report may consistently calculate duration from invoice receipt to payment, while the project metric requires duration from queue entry to approval. Consistency does not correct a wrong definition.
from datetime import datetime
def approval_days(start_text, end_text):
"""Return elapsed calendar days, or raise an error for invalid timestamps."""
start = datetime.fromisoformat(start_text)
end = datetime.fromisoformat(end_text)
if end < start:
raise ValueError("End time cannot precede start time")
return (end - start).total_seconds() / 86400
records = [
("2026-11-01T09:00:00", "2026-11-03T09:00:00"),
("2026-11-02T10:30:00", "2026-11-05T10:30:00"),
]
for start, end in records:
print(f"{approval_days(start, end):.1f} days")The validation rule catches impossible records instead of allowing them to distort the baseline or control limits.
Keep the method stable
Document the measurement method in the control plan. Record who collects the data, how often, which sample is used, and what happens when data are missing or invalid. Recheck the method after software releases, changes to forms, staffing changes, or changes in process ownership.
A practical stability check compares the same known records under the old and new method. If the results differ, determine whether the process changed or the measurement definition changed. Recalculate the baseline only after resolving that distinction.
Trace the measurement into the control plan
For each controlled characteristic, link the operational definition to its data source and reaction plan. The process owner should know how to verify a suspicious value before acting on it. A single outlier may represent a real process failure, a duplicate record, or a timestamp defect.
Exercise
Exercise
A new workflow release changes the recorded start time from invoice receipt to queue entry. What should the process owner do before comparing new approval times with the old baseline?
Show answer
Document the definition change, determine whether the two measures are comparable, and either convert the historical data or establish a new baseline before using control limits.