Sub topic 10
Measuring Process Cycle Efficiency
Assume you can read a simple process map and distinguish a customer, an internal customer, and an external customer. You should also understand the difference between value-added (VA) work, non-value-added (NVA) work, and business-necessary non-value-added (BNVA) work.
Process cycle efficiency (PCE) measures how much of a process's elapsed time creates value for the customer. It is calculated as:
\[ \text{PCE} = \frac{\text{Value-added time}}{\text{Lead time}} \times 100 \]
A low PCE does not automatically mean that employees work slowly. It usually means that the work spends a large amount of time waiting, moving, being checked, or being reworked.
The time measures
Lead time is the total elapsed time from the customer's request to the completed result. It includes processing time, waiting time, queues, transportation, inspections, and rework.
Value-added time is the time spent on steps that change the product or service in a way the customer wants and would recognize as valuable.
Cycle time can mean the time needed to complete one unit or one process cycle. In a stable, repetitive process, cycle time often means the elapsed time between completed units. Do not assume that cycle time and lead time are identical. A process can have a short working cycle but a long lead time because work waits between steps.
The classification of each step determines which minutes belong in the PCE numerator.
| Step | Time | Class | Reason |
|---|---|---|---|
| Enter order | 5 min | BNVA | Required to start and control the order |
| Wait for credit approval | 120 min | NVA | The order is waiting |
| Credit check | 10 min | BNVA | Required by a risk control |
| Assemble product | 30 min | VA | Changes the product for the customer |
| Rework defects | 15 min | NVA | Corrects an error |
| Regulatory inspection | 10 min | BNVA | Required by a regulation |
| Pack and label | 10 min | VA | Makes the product ready for delivery |
In this example, the total lead time is 200 minutes. Value-added time is 40 minutes: 30 minutes for assembly and 10 minutes for packing.
\[ \text{PCE} = \frac{40}{200} \times 100 = 20\% \]
Only one-fifth of the elapsed time directly creates customer value.
Calculating PCE from classified steps
Keep the time units consistent. If some steps are recorded in hours and others in minutes, convert them before adding them. Include time that occurs inside the process, even when no employee is actively working.
from collections import defaultdict
steps = [
("Enter order", 5, "BNVA"),
("Wait in credit approval queue", 120, "NVA"),
("Credit check", 10, "BNVA"),
("Assemble product", 30, "VA"),
("Rework defects", 15, "NVA"),
("Regulatory inspection", 10, "BNVA"),
("Pack and label", 10, "VA"),
]
totals = defaultdict(int)
for name, minutes, classification in steps:
totals[classification] += minutes
lead_time = sum(totals.values())
value_added_time = totals["VA"]
pce = value_added_time / lead_time
print(dict(totals))
print(f"Lead time: {lead_time} min")
print(f"Value-added time: {value_added_time} min")
print(f"PCE: {pce:.1%}")The result is a dictionary of time by classification, a 200-minute lead time, and a PCE of 20.0%.
Annotating a process map
Record the classification and elapsed time directly on the process map. This makes waiting and control steps visible instead of treating them as blank space between activities.
A map with time data supports improvement decisions. First, verify the times with observation or reliable records. A reported average can hide large differences between urgent and normal orders.
Using the result
Prioritize work with a large time contribution and a weak customer-value case.
- Eliminate pure NVA work, such as avoidable waiting, duplicate entry, and rework caused by preventable defects.
- Reduce unavoidable delays by shortening queues, changing batch sizes, or balancing capacity.
- Simplify BNVA work by automating evidence collection or combining approval steps.
- Keep VA work and BNVA work that has a clear regulatory, contractual, or risk-control purpose.
Recalculate PCE after a change. A higher value is useful only if quality, safety, compliance, and customer outcomes remain acceptable.
Exercise
A process has 300 minutes of lead time. It contains 75 minutes of value-added work, 100 minutes of BNVA work, and 125 minutes of NVA work. What is its PCE, and which time should an improvement team examine first?
Show answer
PCE is 75 / 300 = 25%. Examine the 125 minutes of NVA work first, especially the largest avoidable delay. Review the BNVA time afterward to see whether controls can be simplified without removing the required protection.