Sub topic 14
When IRR misleads: multiple IRRs and reinvestment
This chapter assumes you can already compute NPV and IRR in Excel, including the t=0 handling covered earlier. It also assumes you know what an NPV profile is, meaning NPV plotted against the discount rate. Here you will see two ways a reported IRR can mislead you, and what to do about each.
Problem 1: more than one IRR
IRR is the rate where NPV equals zero. NPV is a polynomial in the discount factor, so the equation can have several solutions. A project with only one sign change (outflows first, inflows afterward) has at most one positive IRR. A project whose cash flows change sign more than once can have several.
Consider a project with a cleanup cost at the end:
| Period | Cash flow |
|---|---|
| 0 | -100 |
| 1 | 230 |
| 2 | -132 |
B3: -100
B4: 230
B5: -132
IRR with the default guess:
=IRR(B3:B5)
IRR with a higher guess:
=IRR(B3:B5, 0.25)Both 10% and 20% are valid IRRs. Check 10%: -100 + 230/1.1 - 132/1.21 = 0. Check 20%: -100 + 230/1.2 - 132/1.44 = 0. Excel returns only one root per call. Which one you get depends on the guess. With the default guess of 10% you will probably get 10%. A guess near 25% will probably land on 20%. The function does not warn you that another root exists.
The NPV profile shows why:
NPV is positive only between 10% and 20%. Neither rate says "accept if the cost of capital is below this number." At an 8% cost of capital the NPV is negative, so the project should be rejected, even though both IRRs exceed 8%.
Detecting sign changes
Count the sign changes before trusting an IRR. The number of positive IRRs cannot exceed the number of sign changes.
B3:B5 hold the cash flows
Sign changes (assumes no zero cash flows):
=SUMPRODUCT(--(SIGN(B3:B4)*SIGN(B4:B5)<0))This returns 2 for the example. A zero cash flow gives SIGN of 0 and hides a change, so remove or bridge zeros before relying on this check. If the count is 2 or more, build the NPV profile and use NPV for the decision.
A3:A13 hold trial rates: 0%, 2%, 4%, ... 20%
B3:B5 hold the cash flows
In C3, fill down to C13:
=NPV($A3, $B$4:$B$5) + $B$3Look for every place the column changes sign. Each change brackets an IRR.
Problem 2: the reinvestment assumption
The IRR calculation implicitly assumes that every interim inflow is reinvested at the IRR itself. This follows from the algebra. Discounting at the IRR is equivalent to compounding each inflow forward at that rate until the end of the project. A project with a 30% IRR is treated as if its early cash could keep earning 30%. For high-IRR projects that is rarely true. The money usually earns something close to the firm's cost of capital.
This matters most when you rank mutually exclusive projects. Take two projects:
| Period | Project A | Project B |
|---|---|---|
| 0 | -1000 | -1000 |
| 1 | 1300 | 0 |
| 2 | 0 | 0 |
| 3 | 0 | 2000 |
Project A cash flows in B3:B6, Project B in C3:C6
D1: Discount rate = 8%
IRR of A:
=IRR(B3:B6)
IRR of B:
=IRR(C3:C6)
NPV of A:
=NPV($D$1, B4:B6) + B3
NPV of B:
=NPV($D$1, C4:C6) + C3The results are:
| Measure | Project A | Project B |
|---|---|---|
| IRR | 30.0% | 26.0% |
| NPV at 8% | 203.70 | 587.66 |
IRR prefers A. NPV prefers B. They disagree because A returns its cash early and B keeps the money working for three years. The NPV profiles cross where 1300/(1+r) = 2000/(1+r)^3, which gives (1+r)^2 = 1.5385, so r is about 24.0%. Below 24.0%, B has the higher NPV. Above it, A does.
If the firm's cost of capital is 8%, the cash from A comes back after one year and can only be reinvested at about 8%, not 30%. NPV uses the firm's own rate for that reinvestment, so it gives the right ranking. IRR does not.
Scale also distorts IRR
IRR is a percentage and ignores project size. A 50% IRR on 1,000 creates less value than a 25% IRR on 100,000 when both are available and only one can be chosen. NPV is in currency units, so it reflects size directly.
MIRR as a repair
MIRR makes the reinvestment assumption explicit. It discounts negative flows at a finance rate and compounds positive flows at a reinvestment rate. It then solves for the single rate that links the two.
B3:B6 hold Project A, C3:C6 hold Project B
D1: Finance rate = 8%
D2: Reinvestment rate = 8%
MIRR of A:
=MIRR(B3:B6, D1, D2)
MIRR of B:
=MIRR(C3:C6, D1, D2)Project A's single inflow of 1300 grows to 1300 × 1.08^2 = 1516.32 by period 3. The rate is then (1516.32/1000)^(1/3) - 1, which is about 14.9%. Project B's MIRR stays at about 26.0%, because it has no interim cash to reinvest. MIRR now ranks B above A, which matches NPV.
MIRR also resolves the multiple-root problem. For the -100, 230, -132 project with both rates at 8%, MIRR is a single number, about 7.9%. That is below the 8% hurdle, which agrees with the negative NPV at 8%.
MIRR is not free of problems. Its answer depends on the reinvestment rate you choose, and it still ignores project size. Treat it as a way to express NPV as a rate, not as a replacement for NPV.
Decision rules
- Use NPV at the firm's cost of capital as the primary criterion. It is additive, handles size, and does not depend on a root-finding algorithm.
- Report IRR as supporting information, for a single conventional project, and only after checking sign changes.
- When ranking mutually exclusive projects, compare NPV. If you need a rate, compare MIRR with an explicit reinvestment rate.
- For projects with unusual cash flows, plot the NPV profile. The profile shows the crossover point, every IRR, and the range where the project adds value.
Exercise
A project has cash flows of -500 at t=0, +1,400 at t=1, and -920 at t=2. The IRR function returns 10% with the default guess. (a) How many sign changes are there, and what does that imply about the IRR? (b) What check would you perform before reporting 10% as the project's return?
Show answer
(a) There are two sign changes (negative to positive, positive to negative), so the project can have up to two positive IRRs. Here 10% and 20% both work: -500 + 1400/1.1 - 920/1.21 = 0 and -500 + 1400/1.2 - 920/1.44 = 0. (b) Build an NPV profile by computing =NPV(rate, B4:B5) + B3 across a column of rates, or call IRR with a higher guess such as 0.25. Either check shows the second root and the range of rates where NPV is positive, so you can compare the cost of capital with that range instead of a single IRR.
Exercise
Project A has an IRR of 30% and an NPV of 203.70 at 8%. Project B has an IRR of 26% and an NPV of 587.66 at 8%. Only one can be chosen. Which should you pick, and which assumption makes IRR give the wrong ranking?
Show answer
Pick B, which has the higher NPV at the 8% cost of capital. IRR ranks A first because it assumes A's early inflow is reinvested at 30%. In practice the cash earns about 8%, the rate NPV uses. MIRR with an 8% reinvestment rate gives A about 14.9% and B about 26.0%, which agrees with the NPV ranking.