Sub topic 4
Bias, Linearity, and Stability Studies
Assume you know how to calculate a mean and standard deviation, read a control chart, and identify specification limits. This chapter focuses on three measurement-system properties: bias, linearity, and stability. They answer different questions, so a measurement system can pass one study and fail another.
Bias: Is the average reading correct?
Bias is the difference between the average observed measurement and a trusted reference value:
\[ \text{bias}=\text{average measured value}-\text{reference value} \]
A positive bias means the system reads high. A negative bias means it reads low. The reference should have a value established by a more accurate method, such as a calibrated standard or a laboratory measurement with traceability.
For example, if a reference part is known to measure 50.00 mm and ten readings average 50.08 mm, the estimated bias is +0.08 mm. Whether that is acceptable depends on the required measurement accuracy and the process decision being made.
A useful bias study includes:
- One or more reference artifacts with known values.
- Multiple repeated measurements.
- The same measurement procedure used in production.
- A predefined acceptable bias.
- An uncertainty or statistical test, when the decision requires one.
Do not confuse a small average bias with good measurements. Readings can average correctly while varying widely. Bias describes location, not spread.
Linearity: Does bias change across the range?
Linearity describes how bias changes as the measured value changes. A system may be accurate near the center of its range but read increasingly high or low near its limits.
Measure several reference parts across the operating range. For each part, calculate its average bias. Then plot bias against the reference value or fit a regression line.
- A nearly horizontal line suggests consistent bias.
- A sloped line suggests linearity failure.
- A curved pattern suggests that a straight-line model is incomplete.
- Wide scatter around the line suggests poor repeatability or unstable test conditions.
The intercept estimates bias near zero, while the slope describes how bias changes with the reference value. Use both the practical size of the bias and its uncertainty. A statistically nonzero slope may still be harmless if the resulting error is much smaller than the engineering tolerance.
from statistics import mean
reference = [10.0, 30.0, 50.0, 70.0, 90.0]
readings = [
[10.02, 10.01, 10.03],
[30.03, 30.04, 30.02],
[50.08, 50.07, 50.09],
[70.12, 70.11, 70.13],
[90.16, 90.15, 90.17],
]
bias = [mean(values) - target for target, values in zip(reference, readings)]
x_bar = mean(reference)
y_bar = mean(bias)
slope = sum((x - x_bar) * (y - y_bar)
for x, y in zip(reference, bias)) / sum((x - x_bar) ** 2
for x in reference)
intercept = y_bar - slope * x_bar
print("Bias by reference:", [round(value, 4) for value in bias])
print("Estimated bias at zero:", round(intercept, 4))
print("Linearity slope:", round(slope, 4))Stability: Does performance change over time?
Stability is the ability of a measurement system to keep its statistical properties unchanged over time. Use a stable reference part and measure it at planned intervals, such as once per shift or once per day. Record the result on a control chart.
Look for:
- A shift in the chart center, which may indicate new bias.
- A trend, which may indicate wear, temperature effects, or drift.
- Increasing spread, which may indicate damage or changing technique.
- Isolated outliers, which may indicate handling or recording errors.
Choosing a corrective action
| Finding | Likely cause | Typical action |
|---|---|---|
| Constant bias | Calibration offset or fixture error | Adjust, calibrate, or correct the system |
| Bias changes with size | Scale, geometry, or sensor nonlinearity | Repair, replace, or characterize the instrument |
| Drift over time | Wear, temperature, contamination, or method change | Control conditions and increase monitoring |
| Large scatter | Poor repeatability or operator technique | Continue with gage R&R and improve the method |
These studies should precede process conclusions. If the measurement system drifts or has range-dependent error, apparent process changes may be measurement changes instead.
Exercise
A gage reads 0.10 mm high at 10 mm and 0.10 mm low at 90 mm. Which property is most clearly failing?
Show answer
Linearity is failing because the bias changes across the measurement range. The average bias alone could be near zero and would hide this problem.