Sub topic 5
The three paths at a glance
Prerequisites and scope
This chapter assumes you know the main SAP ERP modules (finance, logistics, procurement) and the usual landscape of development, quality and production systems. It also assumes you know what custom ABAP code is and how master data differs from transactional data. Later chapters cover each path in depth. This chapter gives you the shared vocabulary and a side-by-side comparison, so the later detail has somewhere to attach.
The starting question
Every move from SAP ECC to SAP S/4HANA answers two questions:
- How much of the existing system do you carry forward? This covers configuration, custom code, master data and transactional history.
- How much do you change the business processes while you do it?
The three paths are three different combinations of answers.
- Greenfield (new implementation) builds a new S/4HANA system and carries forward very little.
- Brownfield (system conversion) converts the existing ECC system in place and carries forward everything.
- Selective data transition carries forward what you choose. It starts from either a new system or a converted copy and filters by company code, ledger, time period or similar criteria.
SAP's own terminology uses "new implementation" and "system conversion" for the first two. "Selective data transition" is a service-led approach, often delivered by SAP or by partners using specialist tools. It is not a single SAP product, so scope and tooling differ between providers.
Path 1: Greenfield
In a greenfield project you install a fresh S/4HANA system. You configure it from the standard, usually following the fit-to-standard workshops, and then load data into it with migration tools.
What moves across:
- Configuration: not copied. You re-create only what the workshops show you need.
- Custom code: not copied automatically. You review each object and rebuild only what is still justified, ideally as side-by-side or in-app extensions that respect the clean core.
- Master data: migrated, after cleansing and mapping.
- Transactional data: usually only open items and balances, plus a limited history if the business requires it.
The typical data tooling is the SAP S/4HANA Migration Cockpit. It loads business objects such as customers, materials and open purchase orders from staging tables or files.
The result is a clean system with no inherited configuration debt. The cost is that you redesign and retest processes, you do a lot of data work, and users see the most change.
Path 2: Brownfield
In a brownfield project you convert the existing ECC system. The tool is the Software Update Manager (SUM) with the Database Migration Option (DMO). SUM runs the technical conversion, and DMO migrates the database to SAP HANA in the same run if you are not already on HANA.
What moves across:
- Configuration: kept, then adjusted where simplification items require it.
- Custom code: kept, but you must analyze and adapt it. Code that touches changed tables or removed functions will break or give wrong results.
- Master data: converted in place. Customer and vendor records become business partners through a mandatory synchronization step.
- Transactional data: kept in full, including all history.
Before the conversion you run the Readiness Check and the Simplification Item Check, and you analyze custom code with the ABAP Test Cockpit. These tell you what must change. The conversion itself usually runs as a single downtime window on production, so you rehearse it on copies of the system first.
The result is a faster and lower-redesign route with full history. You also keep the old design, including years of accumulated configuration and data quality problems.
Path 3: Selective data transition
Selective data transition sits between the other two. You want to keep some history or some parts of the landscape, but you do not want to carry all of ECC forward. Common patterns are:
- Company code or entity transfer: move one or more company codes from an ECC system into a new or existing S/4HANA system. This is useful after acquisitions or divestitures.
- Landscape consolidation: merge several ECC systems into one S/4HANA system.
- Shell conversion: copy the ECC system, strip out transactional data, and convert the empty "shell" with master data and configuration intact. You then load history selectively.
- Mix and match: take the configuration of a brownfield and the data scope of a greenfield, or the reverse.
What moves across depends entirely on the scope you define. Because the tooling and service model differ by provider, you should ask each provider exactly which objects, which years and which data checks are covered.
The result is flexibility, at the price of the highest project complexity. You must define the scope precisely and prove that financial data stays consistent after the cut. Reconciliation takes particular effort.
Side-by-side comparison
| Dimension | Greenfield | Brownfield | Selective data transition |
|---|---|---|---|
| SAP term | New implementation | System conversion | Selective data transition (service-led) |
| Starting point | New empty S/4HANA system | Existing ECC system | New system, shell copy or existing target |
| Configuration | Rebuilt as needed | Inherited | Depends on the scenario |
| Custom code | Rebuilt or retired | Adapted in place | Depends on the scenario |
| Historical data | Minimal by default | Complete | Chosen by scope |
| Main tools | Migration Cockpit, fit-to-standard | SUM with DMO, readiness checks, ATC | Specialist tools, often partner-led |
| Process redesign | High | Low by default | Variable |
| Downtime profile | Cutover from old to new system | One conversion window | Depends on the design |
| Main risk | Scope growth and change fatigue | Carrying over old problems | Complexity and reconciliation |
How the paths relate
The paths are not strictly separate. Many real projects blend them. A company might convert its main system by brownfield and use selective transition to carve out a divested business unit. Another might do a greenfield for finance redesign and bring three years of history over using selective tools.
This flow is a simplification. The full decision criteria, including cost, risk and downtime tolerance, come in the final chapter of this tutorial.
Where the shared activities fit
Several activities appear on more than one path, though with different weight:
| Activity | Greenfield | Brownfield | Selective |
|---|---|---|---|
| Fit-to-standard workshops | Central | Optional, for targeted redesign | Depends on scope |
| Simplification item review | Informs design | Mandatory and technical | Mandatory where converted |
| Custom code analysis | To decide what to rebuild | To decide what to adapt | Depends on scope |
| Data migration and cleansing | Central | Limited, but business partner conversion needs care | Central for the selected scope |
| Cutover rehearsal | Required | Required, repeated | Required, often more cycles |
Common errors when comparing paths
- Treating brownfield as "no redesign." Conversion does not stop you from improving processes. It just does not require it. Many projects convert first and then redesign in later phases.
- Treating greenfield as "no legacy." You still need to bring master data and open items. Poor data quality travels with you unless you cleanse it.
- Assuming selective transition is a standard product. It is a family of approaches. Ask for the scope, the tools and the reconciliation method in writing.
- Deciding on technology alone. The choice is driven by business goals, data requirements and risk tolerance. The tools follow from that choice.
Summary
- Greenfield builds new and migrates data. Brownfield converts everything in place. Selective data transition carries forward a chosen scope.
- The main differences are how much configuration, code and history move, and how much process change you accept.
- The paths overlap in practice, and the analysis tools and cutover rehearsals appear in all of them.
Exercise
A company wants to keep ten years of financial history, has a mostly standard configuration, and sees no need to redesign processes. Which path fits best, and which two checks would you run first?
Show answer
Brownfield (system conversion) fits best, because it keeps all history and the existing design. Run the Readiness Check and the Simplification Item Check first, and also start the custom code analysis with the ABAP Test Cockpit, since those results define the adaptation work.
Exercise
A group has just sold one of its five company codes and must move the remaining four into a cleaner S/4HANA system while keeping three years of history. Why is neither pure greenfield nor pure brownfield an obvious fit?
Show answer
Greenfield would bring little history, so the three-year requirement forces extra migration work. Brownfield would convert the whole system, including the sold company code and all older data. A selective data transition lets the team choose the four company codes and the three-year range.