Sub topic 8
Greenfield: a new implementation
What greenfield means and what this chapter assumes
This chapter assumes you know the basics of SAP ERP modules (finance, logistics, procurement), the usual three-system landscape (development, quality, production), and the difference between master data and transactional data. It also assumes you have read the overview of the three paths and the chapters on fit-to-standard and data migration basics.
A greenfield transition is a new implementation of SAP S/4HANA. You install a fresh system, configure it, and load selected data from the old ECC system. Nothing is converted in place. The ECC system stays untouched until you retire it.
Three things define the path:
- New configuration. You build the S/4HANA configuration from the SAP best-practice content or from scratch. You do not carry over the ECC customizing.
- New code. Custom ABAP code is not carried over by default. You bring forward only the objects you still need, after checking them against S/4HANA.
- Selected data. You migrate master data and open items, plus whatever history you decide to keep. Everything else stays in ECC or an archive.
How greenfield differs from the other paths
| Aspect | Greenfield | Brownfield | Selective data transition |
|---|---|---|---|
| Starting point | New, empty S/4HANA system | Copy of the existing ECC system | Copy or new system, with data chosen by scope |
| Configuration | Rebuilt | Converted in place | Depends on the variant |
| Custom code | Re-evaluated and re-built | Adapted | Adapted or re-built |
| Historical data | Only what you choose to load | All data is kept | Chosen by company code, time range, or similar |
| Process change | High | Low | Medium |
Why choose greenfield
Companies pick greenfield when the existing system holds them back more than it helps. Typical reasons are:
- Years of accumulated customizing. Many ECC systems contain settings and workarounds that nobody fully understands. Converting them carries the problem forward.
- A planned process redesign. If the business wants to change how it works, such as new finance structures, a new chart of accounts, or harmonized processes across plants, a fresh start fits better.
- Heavy custom code. If most custom code is obsolete or conflicts with the S/4HANA data model, rewriting can cost less than adapting.
- Data quality problems. Duplicate customers, unused materials, and inconsistent hierarchies are easier to leave behind than to clean in place.
- Landscape consolidation. Several ECC systems can be merged into one S/4HANA system, which a conversion cannot do.
- A clean-core goal. A new system lets you apply extensibility rules from the start instead of removing modifications later.
The greenfield project flow
A greenfield project follows the same broad phases as any SAP Activate project, with these emphases:
- Discover and prepare. Define scope, set up the project, and obtain the sandbox system.
- Explore (fit-to-standard). Walk business users through the delivered best-practice processes. Record gaps as backlog items, not as immediate custom development.
- Realize. Configure the system in iterative cycles. Build extensions, interfaces, and reports. Build and test the data migration.
- Deploy. Run mock migrations, user acceptance tests, and cutover rehearsals. Then go live.
- Run. Stabilize, hand over to support, and decommission or archive ECC.
Data migration in a greenfield project
Because the target system is empty, data migration is the largest technical workstream. You migrate by business object, such as material, business partner, GL account balance, open purchase order, or fixed asset.
Tools
SAP offers the SAP S/4HANA Migration Cockpit. It has two common modes:
- Migrate Your Data (file or staging tables). You fill in XML or CSV templates, or load into staging tables, and the cockpit validates and posts the data. This works for any source system.
- Direct transfer. The cockpit reads directly from the ECC system through an RFC connection. This reduces manual file handling, but it still needs mapping and cleansing.
Which migration objects and modes are available depends on your S/4HANA release and deployment option. Check the current object list before you plan scope.
Business partner
In S/4HANA, customers and vendors are maintained as business partners. In a greenfield load, you create business partners with the customer and vendor roles directly. This avoids the customer-vendor integration (CVI) conversion step that a brownfield project needs.
Finance data
Do not load every historical posting. Typical greenfield finance scope is:
- GL account balances at a cutover date, per period or in total.
- Open items for accounts payable and accounts receivable.
- Fixed asset balances and, where needed, their depreciation history.
- Optionally, a limited number of prior periods for reporting comparison.
Migration quality checks
Each mock run should reconcile the loaded data against the source. At a minimum, check:
- Record counts per object.
- GL balances against the trial balance.
- Open item totals per vendor and customer.
- Inventory quantity and value per material and plant.
Custom code in greenfield
Greenfield does not remove the need to look at custom code. It changes the question from "how do we adapt this?" to "do we need this at all?" A practical approach is:
- Run usage analysis on the ECC system to find which custom objects are executed.
- Drop unused objects.
- For used objects, check whether standard S/4HANA or a best-practice process now covers the need.
- For the rest, rebuild in the new system using the extensibility options that fit the clean-core approach. Prefer key user extensibility and side-by-side extensions on SAP Business Technology Platform where they can do the job, and use developer extensibility for what remains.
Costs and risks
Greenfield trades low technical conversion risk for high business change risk.
- Effort is front-loaded. Process design, configuration, testing, and training take more time than in a conversion. Plan on a longer project and a larger business team.
- Change management matters most. Users get new screens, new processes, and sometimes a new organization structure. Training and acceptance carry more weight than in other paths.
- Data scope decisions are hard to reverse. If you leave history behind, you need a plan for access: keep ECC read-only, archive the data, or copy it into a reporting system.
- Parallel running costs. ECC licenses and infrastructure continue until the old system is retired.
- Scope creep. A fresh start invites every department to request improvements. Hold the line with a documented scope and the fit-to-standard backlog.
Cutover considerations
Greenfield cutover is often easier on downtime than a conversion, because the new system is built and tested ahead of time. The downtime window covers the final extraction, load, reconciliation, and switch of interfaces. It usually does not cover the technical conversion of the database.
Points to plan:
- Freeze master data changes in ECC shortly before the final load.
- Load master data first, then balances and open items.
- Redirect interfaces, such as banks, EDI partners, and connected systems, to the new system.
- Define a rollback decision point. After business transactions post in S/4HANA, going back to ECC is difficult.
Decision criteria: when greenfield fits
Greenfield tends to fit when most of the following are true:
- The business wants significant process change.
- The ECC system is heavily modified or poorly documented.
- The company only needs recent data in the new system.
- The project has capacity for a large business involvement and training effort.
- Several source systems will be merged.
It tends to fit poorly when the processes are stable, the custom code is mostly relevant, the business needs full history in the live system, or the organization cannot support extensive change.
Exercise
A company runs one ECC system with 15 years of heavy customizing, and it plans to harmonize processes across three plants. It needs only the last two years of financial data in the new system and must keep older data available for audits. Which path suits it, and how should it handle the older data?
Show answer
Greenfield suits it. The process harmonization and the heavy customizing favor a fresh configuration, and the limited data need matches a greenfield load of balances, open items, and two years of history. The older data should stay accessible by keeping ECC read-only for a defined period, or by archiving it or copying it into a separate reporting system, so audit requirements are met.
Exercise
Why does a greenfield project not need the customer-vendor integration (CVI) conversion step that a brownfield project needs?
Show answer
In greenfield, customers and vendors are created directly as business partners with the relevant roles in the empty S/4HANA system. CVI is needed in a conversion to turn existing customer and vendor master records into business partners.