Sub topic 8
Work as a Rate: Job per Unit Time
Assume you can work with fractions, ratios, and one-variable equations. This chapter uses those skills to solve problems in which people or machines complete a job at different speeds.
The Core Idea
A work rate is the fraction of a job completed in one unit of time. If a worker completes one job in 6 hours, the worker's rate is:
\[ \frac{1\text{ job}}{6\text{ hours}}=\frac{1}{6}\text{ job per hour} \]
The general relationship is:
\[ \text{work}=\text{rate}\times\text{time} \]
For a complete job, work equals 1. Therefore:
\[ 1=\text{rate}\times\text{time} \]
If you know the time, calculate the rate as:
\[ \text{rate}=\frac{1}{\text{time}} \]
If you know the rate, calculate the time as:
\[ \text{time}=\frac{1}{\text{rate}} \]
Use the same unit of time for every rate in a problem.
| Completion time | Work rate |
|---|---|
| 4 hours | \(1/4\) job per hour |
| 8 hours | \(1/8\) job per hour |
| 3 days | \(1/3\) job per day |
Setting Up a Work Problem
Suppose Worker A finishes a job in 6 hours, and Worker B finishes the same job in 12 hours. In one hour, they complete:
\[ \frac{1}{6}+\frac{1}{12} \]
Use a common denominator:
\[ \frac{1}{6}+\frac{1}{12}=\frac{2}{12}+\frac{1}{12}=\frac{3}{12}=\frac{1}{4} \]
Together, they complete one-fourth of the job per hour. Their completion time is therefore:
\[ \frac{1}{1/4}=4\text{ hours} \]
The combined time is less than either individual time because both workers contribute during every hour.
from fractions import Fraction
def combined_time(*times):
combined_rate = sum(Fraction(1, t) for t in times)
return 1 / combined_rate
print(combined_time(6, 12)) # 4A useful equation for several workers is:
\[ \left(\frac{1}{t1}+\frac{1}{t2}+\cdots\right)T=1 \]
Here, \(t1,t2,\ldots\) are individual completion times, and \(T\) is the time working together.
Partial Jobs
Some problems state that a worker completes only part of a job. Multiply the worker's rate by the time worked.
For example, a machine completes a job in 10 hours. In 3 hours, it completes:
\[ 3\left(\frac{1}{10}\right)=\frac{3}{10} \]
The remaining work is:
\[ 1-\frac{3}{10}=\frac{7}{10} \]
If a second machine completes a full job in 14 hours, its rate is \(1/14\) job per hour. The time needed to finish the remaining work is:
\[ \frac{7/10}{1/14}=\frac{7}{10}\times14=9.8\text{ hours} \]
The key is to track completed work and remaining work separately.
A Reliable Diagram
Common Errors and Checks
- Add rates, not times.
- Make sure all rates use hours, days, or another single unit.
- For a partial job, subtract completed work from 1.
- A combined time must be shorter than the fastest individual completion time when all workers work together.
- If one worker is much slower than another, the combined time should be close to the faster worker's time, but still smaller.
For GRE problems, fractions often make the arithmetic clearer than decimals. Choose a total job of 1 unless the problem gives a convenient number of units.
Exercise
Worker A completes a job in 8 hours, and Worker B completes it in 24 hours. How long do they take together?
Show answer
Their combined rate is 1/8 + 1/24 = 3/24 + 1/24 = 1/6 job per hour. They take 6 hours.