Sub topic 9
Combining Workers: Adding Rates
Assume you can work with fractions, solve a one-variable equation, and use the relationship rate × time = amount of work. In this chapter, a job means one complete task, such as painting a room or assembling a machine.
Expressing Work as a Rate
A worker’s rate is the fraction of the job completed in one unit of time. If a worker finishes a job in 6 hours, the worker’s rate is:
1/6 job per hour
If another worker finishes the same job in 12 hours, that worker’s rate is:
1/12 job per hour
When workers work at the same time, their rates add:
1/6 + 1/12 = 2/12 + 1/12 = 3/12 = 1/4
Together, the workers complete 1/4 of the job per hour. Therefore, they need 4 hours to complete one job.
The key equation is:
combined rate × time = total work
For one complete job:
time = 1 / combined rate
| Worker | Time alone | Rate |
|---|---|---|
| A | 6 hours | 1/6 job per hour |
| B | 12 hours | 1/12 job per hour |
| A and B together | ? | 1/4 job per hour |
A Reliable Setup
For each worker, convert the individual completion time into a rate. Then add the rates and solve for the required time.
Suppose Worker A can complete a job in 8 hours, and Worker B can complete it in 12 hours. How long will they take together?
Worker A’s rate is 1/8 job per hour. Worker B’s rate is 1/12 job per hour.
1/8 + 1/12 = 3/24 + 2/24 = 5/24
Together, they complete 5/24 of the job per hour. Let t be their combined time:
(5/24)t = 1
t = 24/5 = 4.8 hours
The answer is 4.8 hours, or 4 hours 48 minutes.
The combined time must be less than 8 hours, because both workers together must be faster than Worker A alone.
Avoiding Direct-Time Addition
Do not add completion times. If one worker takes 8 hours and another takes 12 hours, 8 + 12 = 20 hours does not describe their combined work. The workers are completing parts of the same job simultaneously, so their rates, not their times, are added.
Do not average the times either. The workers contribute different amounts of work per hour, so an arithmetic average does not represent their combined performance.
from fractions import Fraction
def combined_time(*completion_times):
combined_rate = sum(Fraction(1, hours) for hours in completion_times)
return 1 / combined_rate
print(combined_time(8, 12)) # 24/5More Than Two Workers
The same method works for any number of workers. If three workers finish a job alone in 4, 6, and 12 hours, their combined rate is:
1/4 + 1/6 + 1/12 = 3/12 + 2/12 + 1/12 = 6/12 = 1/2
They complete half the job per hour, so they finish the entire job in 2 hours.
GRE Checking Strategy
After finding a combined time, check these facts:
- The combined time is less than the fastest worker’s individual time.
- Adding another worker should reduce the time.
- If the combined rate is about 1/3 job per hour, the time should be about 3 hours.
- Keep the time unit consistent. If rates are measured in jobs per hour, the answer is in hours.
Exercise
Worker A completes a job in 10 hours, and Worker B completes it in 15 hours. How long do they take together?
Show answer
Their combined rate is 1/10 + 1/15 = 1/6 job per hour, so they take 6 hours.