Sub topic 8
Work as a Rate: Job per Unit Time
This chapter assumes you can do arithmetic with fractions, solve a one-variable linear equation, and set up a basic proportion. You should also know the relationship distance = rate × time from the earlier chapters. Here you apply the same structure to work problems. The next chapter, on combining workers, builds directly on it.
The Core Idea: Work Is a Rate
A work problem describes a worker, a machine, or a pipe that finishes some job over some time. The rate is how much of the job gets done in one unit of time:
rate = job ÷ time
This is the formula for speed, with "job" in place of "distance." The three quantities are tied together the same way:
- work done = rate × time
- time = work done ÷ rate
- rate = work done ÷ time
The table shows the correspondence.
| Distance problems | Work problems |
|---|---|
| distance | amount of work done |
| speed (miles per hour) | work rate (jobs per hour) |
| time (hours) | time (hours) |
| distance = rate × time | work = rate × time |
If you already trust distance = rate × time, you can trust the work version. Only the vocabulary changes.
Treating the Whole Job as 1
Many GRE work problems never say how big the job is. They say "paints a room," "fills a tank," or "writes a report." In that case, define the whole job as 1 unit. The size of the job does not matter, because every worker in the problem is measured against the same job.
If a painter finishes a room in 5 hours, then the painter's rate is 1 room ÷ 5 hours = 1/5 room per hour. After 2 hours the painter has done 2 × 1/5 = 2/5 of the room.
The key habit is this: a time to finish the whole job and a rate are reciprocals.
- Time of 5 hours means rate of 1/5 job per hour.
- Time of t means rate of 1/t.
- Rate of r means time of 1/r.
That reciprocal step is the most common place to slip, so it is worth writing the rate as a fraction every time.
Worked Examples
Example 1: Rate from a time
A machine fills a standard order in 8 hours. Its rate is 1/8 order per hour. In 3 hours it finishes 3 × 1/8 = 3/8 of the order. The remaining work is 1 − 3/8 = 5/8 of the order, which takes (5/8) ÷ (1/8) = 5 more hours.
Example 2: A job with an actual size
A machine makes 240 bolts in 8 hours. Its rate is 240 ÷ 8 = 30 bolts per hour. To make 450 bolts it needs 450 ÷ 30 = 15 hours.
When the job has a real size, you can use real units such as bolts. When it does not, use 1. Both methods give the same answers.
Example 3: Rate to time with a messy fraction
A worker completes 3/20 of a job each hour. The time for the whole job is 1 ÷ (3/20) = 20/3 hours. That is 6 and 2/3 hours, or 6 hours 40 minutes. Converting the leftover 2/3 hour into minutes (2/3 × 60 = 40) is a unit conversion step. Answer choices on the GRE often use either form, so check which one the question asks for.
Example 4: Percent changes in rate
A worker finishes a job in 10 hours. After training, the worker's rate rises by 25%. The old rate is 1/10. The new rate is 1/10 × 1.25 = 1/8. The new time is 8 hours.
Notice that the time did not drop by 25%. It dropped by 20%, from 10 to 8 hours. A percent change applies to the rate, and time moves in the opposite direction by a different percent. Always convert to a rate before applying a percent change.
Keeping Units Consistent
The rate and the time must use the same time unit before you multiply. A worker who paints 1 wall in 45 minutes has a rate of 1/45 wall per minute. If the question asks how many walls the worker paints in 3 hours, you have two safe choices:
- Convert the time: 3 hours = 180 minutes, so the work is 180 × 1/45 = 4 walls.
- Convert the rate: 1/45 wall per minute × 60 minutes per hour = 4/3 walls per hour, so the work is 3 × 4/3 = 4 walls.
Both choices give 4 walls. The mistake is multiplying 1/45 by 3 and getting 3/45, which mixes a per-minute rate with a time in hours.
Checking Your Work in Code
The following program uses Python's Fraction type so the arithmetic stays exact, the way it does on paper. Each function matches one of the three rearrangements.
from fractions import Fraction
def rate_from_time(job, time):
"""Rate = job / time."""
return Fraction(job) / Fraction(time)
def time_to_finish(job, rate):
"""Time = job / rate."""
return Fraction(job) / Fraction(rate)
def work_done(rate, time):
"""Work = rate * time."""
return Fraction(rate) * Fraction(time)
# Example 1: 8-hour machine, whole job = 1
rate = rate_from_time(1, 8)
print(rate) # 1/8
print(work_done(rate, 3)) # 3/8
print(time_to_finish(1 - work_done(rate, 3), rate)) # 5
# Example 2: 240 bolts in 8 hours
bolt_rate = rate_from_time(240, 8)
print(bolt_rate) # 30
print(time_to_finish(450, bolt_rate)) # 15
# Example 3: 3/20 job per hour
print(time_to_finish(1, Fraction(3, 20))) # 20/3
# Example 4: 25% faster worker, 10-hour job
new_rate = rate_from_time(1, 10) * Fraction(5, 4)
print(new_rate, time_to_finish(1, new_rate)) # 1/8 8
# Units: 1 wall per 45 minutes, working 3 hours (180 minutes)
print(work_done(rate_from_time(1, 45), 3 * 60)) # 4The last line converts 3 hours to minutes before multiplying. Removing the * 60 produces 1/15, which is the wrong-units answer.
Inverse Relationship Between Rate and Time
For a fixed job, rate and time are inversely proportional. Doubling the rate halves the time. Tripling the rate cuts the time to one third. This gives a quick check on any answer.
- A worker who is twice as fast as another takes half as long.
- If worker A takes 6 hours and worker B takes 3 hours, B's rate is twice A's.
- If your answer says a faster worker takes longer, you have inverted something.
You can use this for quick estimation. If a worker takes 6 hours, any worker who is faster must take fewer than 6 hours on the same job.
Common Errors
| Error | Why it fails | Fix |
|---|---|---|
| Using the time as the rate (writing 5 instead of 1/5) | A time of 5 hours is 5 hours per job, not 5 jobs per hour | Write the rate as 1/5 before doing anything else |
| Applying a percent increase to time | Rate and time are reciprocals, so a 25% faster rate is not a 25% shorter time | Convert to a rate, apply the percent, then convert back |
| Mixing minutes and hours | The product of a per-minute rate and a time in hours has no meaning | Convert one of them first and label the result |
| Forgetting that "done" and "remaining" differ | A worker who has done 3/8 of a job still has 5/8 to go | Subtract from 1 before dividing by the rate |
| Rounding the rate early | 1/3 written as 0.33 gives answers that drift away from the choices | Keep fractions until the final step |
Reading a Work Problem
A reliable sequence for any single-worker problem:
- Identify the job. Decide whether it is 1 or a stated amount.
- Write the rate with units, such as "1/5 room per hour."
- Check that the time unit in the question matches the time unit in the rate.
- Choose the unknown: work done, time, or rate. Rearrange work = rate × time.
- Compare the result with a quick estimate. A worker who needs 5 hours for the whole job should finish less than half of it in 2 hours.
Following these steps takes about 30 seconds on a typical problem, which fits GRE pacing.
Exercise
A copier prints a full batch of 600 flyers in 25 minutes. (a) What is its rate in flyers per minute? (b) How many flyers does it print in 1.5 hours? (c) How many minutes does it need to print 1,000 flyers?
Show answer
(a) Rate = 600 ÷ 25 = 24 flyers per minute. (b) 1.5 hours = 90 minutes, so 24 × 90 = 2,160 flyers. (c) Time = 1,000 ÷ 24 = 125/3 minutes, which is 41 and 2/3 minutes, or 41 minutes 40 seconds.
Exercise
Maria can paint a fence in 12 hours. After she takes a faster brush, her rate increases by 50%. How long does she now need to paint the same fence, and by what percent did her time fall?
Show answer
Her old rate is 1/12 fence per hour. The new rate is 1/12 × 1.5 = 1/8 fence per hour, so the new time is 8 hours. The time fell by 4 hours out of 12, which is 1/3, or about 33.3%. A 50% increase in rate produces a 33.3% decrease in time, not 50%.
Exercise
A worker completes 2/9 of a job in 4 hours. At that rate, how many hours does the whole job take, and how much of the job remains after 10 hours of work?
Show answer
The rate is (2/9) ÷ 4 = 1/18 job per hour, so the whole job takes 18 hours. After 10 hours the worker has done 10/18 = 5/9 of the job, so 4/9 of the job remains.