Sub topic 11
Staggered Starts and Partial Jobs
This chapter assumes you can add and subtract fractions, solve a linear equation in one variable, and treat work as a rate (job per unit time). Earlier chapters showed that rates add when workers cooperate. Here the workers do not all run for the same length of time. Someone starts early, someone leaves early, or the job is only partly done when a question is asked.
The Core Idea: Work Done = Rate × Time
For a single worker, the amount of work done is rate multiplied by the time that worker actually works:
work done = rate × time worked
A whole job counts as 1. A worker who finishes a job alone in 10 hours has a rate of 1/10 job per hour. After 3 hours, that worker has done 3/10 of the job.
For several workers, you add up each worker's contribution. Each worker gets their own time:
total work = (rate A × time A) + (rate B × time B) + ...
The total must equal 1 when the job is finished. This one equation handles almost every staggered-start problem. The difficulty is in deciding what time belongs to each worker.
Setting Up Staggered Starts
A staggered start means workers begin or stop at different moments. The reliable method is to pick one clock, usually the total elapsed time from the first moment anyone works, and express every worker's time in terms of it.
Suppose Ana can finish a job alone in 6 hours and Ben can finish it alone in 12 hours. Ana starts at 9:00. Ben joins at 10:00. They work together until the job is done. When is it finished?
- Rates: Ana is 1/6 per hour, Ben is 1/12 per hour.
- Let t be the hours since 9:00. Ana works t hours. Ben works t − 1 hours.
- Equation: (1/6)t + (1/12)(t − 1) = 1.
- Multiply by 12: 2t + (t − 1) = 12, so 3t = 13 and t = 13/3 hours, which is 4 hours 20 minutes.
- The job finishes at 1:20 p.m.
An alternative is to split the timeline into phases. In the first hour only Ana works, so she completes 1/6. The remaining work is 5/6. Together they work at 1/6 + 1/12 = 1/4 job per hour, so the rest takes (5/6) ÷ (1/4) = 10/3 hours, or 3 hours 20 minutes. Total time is 1 + 10/3 = 13/3 hours, matching the first method.
Both methods are valid. The single-equation method is shorter when you are comfortable with algebra. The phase method is easier to check and is less likely to produce a sign error when a worker leaves.
Workers Who Leave Early
The same structure applies when someone stops before the job is done. The leaving worker's time is shorter than the total.
Example: Two machines can each finish an order alone in 8 hours and 24 hours. Both start together, but the faster machine breaks down after 3 hours. How long does the slower one need to finish alone?
- Rates: 1/8 and 1/24 job per hour. Together: 3/24 + 1/24 = 4/24 = 1/6 per hour.
- In 3 hours together: 3 × 1/6 = 1/2 of the job.
- Remaining: 1/2. The slower machine alone does 1/24 per hour, so it needs (1/2) ÷ (1/24) = 12 hours.
The total elapsed time is 3 + 12 = 15 hours. Read the question carefully. It asks about the time the slower machine needs after the breakdown, which is 12 hours, not 15.
Partial Jobs: Fractions Done and Fractions Left
Many questions ask what fraction of a job is complete or remaining after some time. Work in fractions of the whole job.
- Fraction done = rate × time.
- Fraction remaining = 1 − fraction done.
- Time to finish the remainder = fraction remaining ÷ current rate.
You can run this logic in code to confirm a setup. The function below handles any list of workers, each with a solo completion time and a start offset, and finds when the job is complete.
from fractions import Fraction
def finish_time(workers):
"""workers: list of (solo_hours, start_hour). Returns the clock time
(hours from time zero) at which the combined work reaches 1 job."""
events = sorted(set(start for _, start in workers))
done = Fraction(0)
for i, start in enumerate(events):
active_rate = sum(Fraction(1, t) for t, s in workers if s <= start)
needed = 1 - done
if i + 1 < len(events):
window = events[i + 1] - start
if active_rate * window < needed:
done += active_rate * window
continue
return Fraction(start) + needed / active_rate
# Ana (6 hours) starts at 0, Ben (12 hours) starts at 1
print(finish_time([(6, 0), (12, 1)])) # 13/3The output 13/3 matches the hand calculation above. Using Fraction avoids rounding, so you can compare the result to an exact answer.
Working Backward from a Partial Result
Sometimes the partial result is given and a rate is unknown. Then the equation has a variable in place of one rate or time.
Example: Pat can paint a fence alone in 10 hours. Pat works alone for 4 hours, then Quinn joins and they finish the remaining part in 2 more hours. How long would Quinn take alone?
- Pat's work alone: 4 × 1/10 = 2/5. Remaining: 3/5.
- Together they work 2 hours. Pat contributes 2 × 1/10 = 1/5.
- Quinn must supply 3/5 − 1/5 = 2/5 in 2 hours, so Quinn's rate is 1/5 job per hour.
- Quinn alone takes 5 hours.
Notice that you never needed to know a combined rate. Subtracting each known contribution from 1 isolates the unknown.
Common Errors
- Giving every worker the full time. If Ben starts an hour late, his time is t − 1, not t. This is the most frequent mistake.
- Mixing up elapsed time and a worker's time. Decide at the start which quantity the variable represents and write it down.
- Answering the wrong question. The problem may ask for the finish time of the day, the total elapsed time, or the time one worker spends. These are different numbers.
- Adding times instead of rates. Ana's 6 hours and Ben's 12 hours do not add to 18 hours of anything useful. Rates add, times do not.
- Forgetting that the job is capped at 1. If your equation gives total work above 1 at a given time, the job finished earlier.
- Unit slips. If rates are per hour and a start is stated in minutes, convert before substituting. A 30-minute delay is 1/2 hour.
Sanity Checks
Before choosing an answer, run quick checks.
- Bounds. Working together should be faster than the fastest worker alone, if both work the whole time. In the Ana and Ben example, the answer (13/3 hours) is above 4 hours, which is the time with both from the start. It is below 6 hours, which is Ana alone. A staggered start has to land between those two.
- Substitution. Plug your time back in. Ana: (1/6)(13/3) = 13/18. Ben: (1/12)(10/3) = 10/36 = 5/18. The sum is 13/18 + 5/18 = 18/18 = 1.
- Direction. A later start for one worker must make the total time longer, not shorter.
Quick Reference
| Situation | Setup |
|---|---|
| One worker starts late by d | Late worker's time = t − d |
| One worker leaves after s hours | Leaving worker's time = s, others use t |
| Fraction remaining after some work | 1 − (sum of rate × time) |
| Time to finish the rest | Remaining fraction ÷ current combined rate |
| Unknown worker rate | Subtract known contributions from 1, divide by that worker's time |
Practice
Exercise
Dev can complete a report alone in 8 hours. Mia can complete it alone in 4 hours. Dev starts at 1:00 p.m. and Mia joins at 3:00 p.m. At what time is the report finished?
Show answer
Dev's rate is 1/8 and Mia's is 1/4. In the first 2 hours Dev completes 2/8 = 1/4, leaving 3/4. Together their rate is 1/8 + 2/8 = 3/8 per hour. The remaining time is (3/4) ÷ (3/8) = 2 hours. The report is finished at 5:00 p.m.
Exercise
A pool can be filled by Pipe A alone in 6 hours. Pipe B alone fills it in 3 hours. Both start together, but Pipe B is shut off after 1 hour. How long in total, from the start, does it take to fill the pool?
Show answer
Together the rate is 1/6 + 1/3 = 1/2 per hour, so in 1 hour they fill 1/2. The remaining 1/2 is filled by Pipe A alone at 1/6 per hour, which takes (1/2) ÷ (1/6) = 3 hours. The total is 1 + 3 = 4 hours.
Exercise
Sam can mow a lawn alone in 9 hours. Sam works alone for 3 hours. Then Tia joins, and together they finish the rest in 2 hours. How long would Tia take to mow the whole lawn alone?
Show answer
Sam does 3/9 = 1/3 alone, leaving 2/3. In the next 2 hours Sam does 2/9. Tia must do 2/3 − 2/9 = 4/9 in 2 hours, so Tia's rate is 2/9 per hour. Tia alone takes 9/2 = 4.5 hours.