Sub topic 12
Three ways to get to S/4HANA
This chapter assumes you know the ECC 6.0 module landscape (FI, CO, MM, SD), the difference between a database and an application layer, and what custom ABAP code is. It also assumes you have read the earlier chapters on the simplified data model. Here we compare the three routes SAP describes for reaching S/4HANA.
The three approaches
Each route answers one question: how much of your current system do you carry forward?
- New implementation (often called greenfield) builds a fresh S/4HANA system. You configure it from scratch and load only the data you choose to migrate.
- System conversion (often called brownfield) converts your existing ECC system in place. Configuration, custom code, and data all come along.
- Selective data transition moves selected parts of an existing landscape, such as one company code or a set of historical data, into S/4HANA. It is usually delivered through a specialist service or tooling, not a single standard SAP tool.
How they compare
| Aspect | New implementation | System conversion | Selective data transition |
|---|---|---|---|
| Starting point | Empty S/4HANA system | Your ECC system | Existing system, partly moved |
| Process redesign | Full freedom | Limited, mostly after go-live | Depends on scope |
| Custom code | Rebuilt or dropped | Analyzed and adapted | Chosen per scope |
| Historical data | Only what you migrate | Fully kept | Selected portion |
| Typical risk | Long design effort | Legacy complexity carried over | Tooling and scoping complexity |
What a system conversion involves
A conversion runs through SAP's Software Update Manager (SUM) with the Database Migration Option (DMO) when the database also changes to SAP HANA. Before it starts, the Maintenance Planner calculates the target stack. The Simplification Item Catalog lists what changes for each functional area. Later chapters cover these tools in detail.
During conversion, the data model changes you saw earlier are applied to your data. Finance line items are moved into the Universal Journal. Customers and vendors are synchronized into Business Partner records. Material documents are consolidated into MATDOC. This is why conversion preparation includes data checks, such as reconciling ledgers before the run.
After conversion, custom code that reads the old structures may break. Reading finance balances now looks like this:
SELECT SUM( hsl ) AS total_amount
FROM acdoca
WHERE rldnr = '0L'
AND rbukrs = '1000'
AND gjahr = '2024'
AND racct = '0000400000'
INTO @DATA(lv_total).Code that selected from older aggregate tables needs this kind of rewrite, or it relies on compatibility views that SAP provides for reading.
Common errors when choosing
- Treating conversion as a technical upgrade. It changes data and processes, so business owners must test.
- Choosing greenfield only for a clean start. Redesign costs time. Without a clear process benefit, the effort may not pay off.
- Ignoring custom code volume. Large amounts of unused custom code make conversion slower unless you clean it up first.
- Assuming selective transition is a product you buy. It is a project approach that needs scoping, tooling, and testing for data consistency.
Exercise
A company has a heavily customized ECC system with ten years of finance history that auditors need. It wants minimal process change and the shortest path to S/4HANA. Which approach fits best, and why?
Show answer
System conversion. It keeps configuration, custom code (after adaptation), and full history in place, and it changes processes the least. New implementation would force redesign and a separate history migration.