Sub topic 10
ECC maintenance deadlines: mainstream and extended
This chapter assumes you know the ECC 6.0 and Business Suite 7 baseline from earlier chapters, and that you know what an enhancement package (EHP) is. It explains what SAP's maintenance terms mean, which dates SAP has published, and where to confirm them.
Two kinds of maintenance
SAP offers support for a release in phases. Two phases matter for ECC.
- Mainstream maintenance is the standard phase. It is included in your normal maintenance fee. You get legal and regulatory changes, support packages, and corrections for defects.
- Extended maintenance comes after mainstream. It costs an additional fee, usually a percentage of the standard maintenance fee. SAP typically limits what it covers, and you must opt in.
Neither phase means ECC stops running on the end date. It means SAP stops delivering fixes and updates under that phase.
The published dates
SAP's Business Suite 7 maintenance covers SAP ERP 6.0, which includes ECC 6.0 enhancement packages 0 to 8. SAP's published position at the time of writing is:
| Phase | End date | Notes |
|---|---|---|
| Mainstream maintenance | 31 December 2027 | Included in standard maintenance |
| Extended maintenance | 31 December 2030 | Optional, additional fee |
SAP announced the 2027 date in 2020, after it had first set an earlier one. That history shows the dates can move.
SAP has also announced transition offers tied to its cloud programs, such as RISE with SAP. Under some of these offers, ECC can be covered past 2030. The terms depend on the contract and the offer, so treat them as a separate commercial topic. Do not assume they apply to your landscape.
Where to verify the dates
Do not rely on a tutorial, a consultant slide, or a forum post for contract-relevant dates. Check SAP's own sources.
- SAP Note 1648480, "Maintenance for SAP Business Suite 7 Software including SAP NetWeaver". This note states the maintenance end dates for the Business Suite 7 releases. You need an S-user ID to read it.
- SAP Product Availability Matrix (PAM). It lists each release and its maintenance status, and it shows component-level dates.
- Your SAP contract and account team. Extended maintenance and any transition offer are commercial terms. Only your contract defines what you are entitled to.
What the dates mean for a landscape
The end of a maintenance phase affects more than ECC itself.
- Compliance changes. After maintenance ends, SAP no longer delivers legal updates such as tax and reporting changes. You must build them yourself or buy them elsewhere.
- Dependent components. Check the maintenance dates of the database, the operating system, and add-ons. A component can leave support before ECC does.
- Third-party support. Some vendors sell support for ECC after SAP's dates. This does not replace SAP's fixes and legal updates. The next chapter discusses it.
Exercise
Your manager says "ECC is supported until 2030, so we have until then." Name two things you would check before agreeing, and one source for each.
Show answer
First, whether 2030 is mainstream or extended maintenance. Only 2027 is mainstream. Extended maintenance to 2030 is optional and costs extra, so check your contract and SAP Note 1648480. Second, whether the dates are still current and whether other components (database, operating system, add-ons) stay supported until then. Check the SAP Product Availability Matrix.