Recording estimates and actuals
This chapter assumes you have a calendar or task list, you already estimate how long your own tasks take, and you know why plans tend to run over. Here you build the record that later chapters use to size buffers: a simple log of what you expected and what happened.
Why a record beats memory
Memory of how long things took is unreliable. You remember the one task that ballooned and forget the five that finished on time. You also tend to recall the work as shorter than it was. A written record replaces that impression with numbers.
The record has one job. It lets you compare estimated time (what you predicted before starting) with actual time (what the work took). The gap between them is the raw material for sizing buffers.
What to record
Keep the log small enough that you will actually fill it in. Four fields cover most needs:
| Field | Example | Why it matters |
|---|---|---|
| Task | Write weekly report | Lets you find similar work later |
| Category | Writing | Different kinds of work overrun differently |
| Estimate (hours) | 2 | Your prediction, written before you start |
| Actual (hours) | 3 | What it took, written when you finish |
Add a short note only when something unusual happened, such as "waited on a reply". Notes help you separate a one-off event from a pattern.
Rules for honest data
The log is only useful if the numbers are honest. Follow these rules:
- Write the estimate before you start. An estimate written afterward is contaminated by what you now know.
- Do not edit estimates after the fact, even when they were clearly wrong. Wrong estimates are the data you want.
- Record elapsed working time, including interruptions that belonged to the task. If you stopped to answer an urgent message about the task, count it.
- Log tasks that went well, too. If you only record overruns, your numbers will look worse than reality.
Turning the log into ratios
Raw differences are hard to compare. A 1-hour overrun means something different on a 2-hour task than on a 10-hour task. A ratio solves this: divide the actual time by the estimate.
- A ratio of 1.0 means the estimate was exact.
- A ratio of 1.5 means the task took 50% longer than planned.
- A ratio below 1.0 means you finished early.
The diagram shows the cycle you repeat for each task.
Computing ratios in code
If you keep the log in a spreadsheet or a plain file, a short script can calculate the ratios for you. This example stores each task as a tuple of estimated and actual hours, then prints the ratio for each one and the average.
# (estimated_hours, actual_hours) for past tasks
history = [(2, 3), (4, 5), (1, 1.5), (3, 3), (5, 8)]
ratios = [actual / estimate for estimate, actual in history]
for (estimate, actual), ratio in zip(history, ratios):
print(f"Estimated {estimate}h, took {actual}h, ratio {ratio:.2f}")
average = sum(ratios) / len(ratios)
print(f"Average ratio: {average:.2f}")For this history the average ratio is about 1.35. Your tasks tend to take roughly a third longer than you predict. The next chapter explains why the average alone is a poor basis for a buffer, and what to use instead.
Common errors
- Logging too late. If you fill in the log at the end of the week, the actual times are guesses. Record the actual when you finish the task.
- Mixing task types. A single ratio for all work hides the fact that, for example, meetings may run close to plan while writing runs long. Use the category field to keep them apart.
- Too few entries. Three or four tasks tell you little. Aim for at least 15 to 20 entries per category before you trust the pattern.
- Tracking everything. Logging every five-minute task creates a chore you will abandon. Track tasks of about 30 minutes or longer.
Exercise
You log three tasks: estimated 2h, actual 3h; estimated 4h, actual 4h; estimated 1h, actual 2h. What are the three ratios, and what do they suggest about your estimates?
Show answer
The ratios are 1.5, 1.0, and 2.0. Two of the three tasks overran, and the shortest task overran the most in relative terms (it took twice as long as predicted). This suggests your estimates run low, especially for small tasks. Three entries are too few to be sure, so keep logging before you act on the pattern.