Sub topic 1
What a Line Plan Is and What It Decides
Prerequisites
This chapter assumes you already know the following:
- Basic fashion vocabulary: category, silhouette, season, and SKU (stock keeping unit, one sellable combination of style, color, and size).
- The seasonal design and buying calendar, meaning how a collection moves from concept to development to production to the shop floor.
- How to read a simple spreadsheet and work with percentages.
You do not need to know how to build a line plan yet. This chapter defines it and shows what it fixes. Later chapters cover each decision in detail.
What a line plan is
A line plan is the working document that turns a collection brief into a defined set of styles, colors, prices, and deliveries. The brief says what the season should feel like and who it is for. The line plan says how many styles you will make, in which categories, at which prices, in which colors, and when they arrive.
Think of the brief as the intention and the line plan as the commitment. Design, sourcing, merchandising, and sales all work from it. When someone asks "do we have enough knitwear?" or "why is there only one style under $60?", the line plan is where the answer sits.
A line plan is not a design board and not a final product list. It is a structured set of decisions, made early, while changes are still cheap.
Why it exists
Fashion collections go wrong in predictable ways. A range can have six dresses that all do the same job and no basic top. It can have a strong concept that cannot be delivered at the margin the business needs. It can be so wide that each color-way gets too few units to buy fabric at a reasonable minimum.
A line plan makes these problems visible on paper before samples are cut. It has three jobs:
- Align. Design, merchandising, and sales agree on one definition of the range.
- Constrain. Targets for margin, units, and delivery dates limit the range to what the business can fund and sell.
- Control change. Once the plan is approved, any addition or cut is a visible edit against a baseline, not a quiet drift.
What the plan decides
A line plan fixes a set of linked decisions. Each one gets its own chapter later, so this section only names them and shows how they connect.
| Decision | The question it answers | Typical form in the plan |
|---|---|---|
| Customer and brand focus | Who is this range for, and what does the brand promise? | A short profile and positioning statement |
| Product roles | Which styles are core, which are fashion, which are statement? | A role tag on every style |
| Category and silhouette structure | How many styles go in each category, and in which shapes? | Style counts and percentage shares |
| Price tiers and margin targets | At what retail prices, and with what margin? | Price bands with target margin per tier |
| Sales and unit budgets | How much must the range sell, and how many units do we buy? | Season sales, margin, and unit totals |
| Color distribution | Which colors, spread across which styles? | Palette with color-ways per style |
| Fabrics and trims | Which materials carry the range? | Fabric list linked to styles |
| Breadth, depth, and SKU counts | How many styles, and how many units per color and size? | Style, color-way, SKU, and unit counts |
| Size and fit range | Which sizes and fits does each style cover? | Size run per style |
| Delivery windows and milestones | When does each style land, and when must it be developed? | Delivery drops and a development calendar |
The plan does not fix everything. Final fabric prices, exact fit corrections, and final styling come later. The plan sets the frame inside which those details are settled.
How the decisions connect
The decisions are not independent. Category structure depends on the customer and on product roles. Price tiers depend on categories. Financial targets depend on price. Breadth and depth depend on categories, targets, colors, and fabrics. Delivery timing depends on breadth and categories.
Two practical consequences follow from this order.
- A change early in the chain moves everything after it. If you raise the price tier, margin and unit targets change. If you cut a category, breadth and delivery change.
- Work usually loops. You rarely finish one step before touching the next. You set a first pass, test it against the targets, and adjust.
A first look at the numbers
A line plan is a numeric document. Even before you build one, you should be able to read a draft and ask the right questions. This script takes six sample styles and computes the share by category, the share by role, and the average gross margin. Gross margin here is (retail − cost) / retail.
from collections import Counter
styles = [
{'id': 'D01', 'category': 'dress', 'role': 'core', 'retail': 120.0, 'cost': 40.0},
{'id': 'D02', 'category': 'dress', 'role': 'fashion', 'retail': 150.0, 'cost': 55.0},
{'id': 'T01', 'category': 'top', 'role': 'core', 'retail': 60.0, 'cost': 18.0},
{'id': 'T02', 'category': 'top', 'role': 'fashion', 'retail': 75.0, 'cost': 24.0},
{'id': 'K01', 'category': 'knitwear', 'role': 'core', 'retail': 110.0, 'cost': 36.0},
{'id': 'B01', 'category': 'bottom', 'role': 'core', 'retail': 90.0, 'cost': 28.0},
]
def share(items, key):
counts = Counter(s[key] for s in items)
total = len(items)
return {k: round(v / total, 2) for k, v in counts.items()}
print(share(styles, 'category'))
print(share(styles, 'role'))
margins = [(s['retail'] - s['cost']) / s['retail'] for s in styles]
print(round(sum(margins) / len(margins), 3))The output shows dresses and tops at 0.33 each of the styles, with knitwear and bottoms at 0.17. Core styles are 0.67 of the range and fashion styles are 0.33. The average margin is about 0.68.
These are the first numbers you would compare against the plan's targets. If the target says bottoms should be 25% of the range, this draft is short. If the target margin is 70%, it is slightly under. The plan makes those comparisons possible because it states the targets in advance.
Breadth, depth, and the unit budget
One decision shows especially clearly why the plan matters: how wide to make the range.
- Breadth is how many different styles the range has.
- Depth is how many units you buy of each style, color, or SKU.
- A color-way is one style in one color.
For a fixed unit budget, more breadth means less depth. The second script shows this for a range of 40 styles, 3 colors per style on average, 5 sizes, and a budget of 12,000 units.
styles = 40
avg_colors_per_style = 3
sizes_per_style = 5
unit_budget = 12000
color_ways = styles * avg_colors_per_style
units_per_color_way = unit_budget / color_ways
units_per_sku = units_per_color_way / sizes_per_style
print(color_ways)
print(units_per_color_way)
print(units_per_sku)It prints 120 color-ways, 100.0 units per color-way, and 20.0 units per SKU. Twenty units per SKU is thin. Spread across size and store or channel allocations, some sizes will sell out while others sit. Many fabric mills and factories also set minimum order quantities, often per color, so 100 units per color-way may be below what a supplier accepts.
At this point you have three options: cut styles, cut colors, or raise the unit budget. The plan lets you see this trade-off before you commit to any of them.
What a line plan is not
Confusing the line plan with neighboring documents leads to common errors.
- Not the design brief. The brief describes mood, themes, and inspiration. The plan converts that into counts and targets.
- Not the buy plan or open-to-buy. Those allocate money and units to stores and time periods. The line plan feeds them but is built earlier and at style level.
- Not the tech pack. Tech packs specify construction for one style. The line plan only decides that the style exists, its role, its price, and its delivery.
- Not fixed forever. The plan is a baseline. It can change, but changes should be deliberate and recorded.
Common errors at this stage
- Treating the plan as a wish list. A plan with no targets cannot be checked. Every major decision needs a number or a rule behind it.
- Starting with styles instead of structure. If you list styles first and count later, you tend to end up with an unbalanced range. Set the frame first, then fill it.
- Ignoring the unit budget until late. Breadth and color decisions that look fine on a board can fail the depth test.
- Skipping the checks. A plan can look complete and still be lopsided. The later chapters on balance checks and range review exist for this reason.
- Losing the reasons. If styles are cut or added and no one records why, the next season starts from guesses.
How the rest of the tutorial uses this
The chapters that follow build a plan in the order shown in the diagram. You will start from the brand and the customer, assign roles, set categories and price, tie the plan to financial targets, distribute colors and fabrics, decide breadth and depth, plan sizes and deliveries, assemble the document, check it for balance, and edit it. The same small example range appears throughout, so you can watch one plan take shape.
Exercise
A draft plan has 30 styles, an average of 4 colors per style, 6 sizes per style, and a unit budget of 7,200. How many color-ways and units per SKU does that give, and what is one way to fix the result if the supplier minimum is 150 units per color-way?
Show answer
Color-ways = 30 × 4 = 120. Units per color-way = 7,200 / 120 = 60. Units per SKU = 60 / 6 = 10. At 60 units per color-way, the plan falls below a 150-unit minimum. To reach 150 per color-way with the same budget, you need at most 7,200 / 150 = 48 color-ways. You could cut to 12 styles at 4 colors, keep 30 styles at about 1.6 colors, or raise the unit budget. Cutting colors on low-priority styles and merging overlapping styles is usually the least damaging option.
Exercise
Name two things a line plan decides and two things it deliberately leaves for later.
Show answer
It decides, for example, the number of styles per category and the price tier of each style. It leaves for later items such as construction details in the tech pack and final fit corrections, along with exact fabric costs confirmed after sourcing.