Sub topic 6
Linking the plan to sales and unit budgets
This chapter assumes you know basic fashion vocabulary (category, silhouette, season, SKU), the seasonal design and buying calendar, and how to read a simple spreadsheet with percentages. It sits after price architecture and before breadth and depth. You already have price tiers and target margins. Now you tie them to the money and units the company expects from the season.
Why the plan needs a financial anchor
A line plan with no financial anchor is a wish list. Designers can fill it with attractive styles, but nobody can tell whether the range is too big, too small, or too expensive to make. The sales and unit budget supplies the limits the plan must fit inside.
Three numbers drive most of the work:
- Net sales target. The revenue the season is expected to produce after returns and markdowns.
- Gross margin target. The share of retail revenue left after the cost of goods, usually shown as a percentage.
- Unit budget. The number of units the company expects to buy and sell. It is the number that sets how deep each style can go.
Finance or merchandising usually provides these numbers. The line planner's job is to translate them into a range that can deliver them, and to push back when the range and the budget cannot both be true.
From sales target to unit budget
Units are the sales target divided by the average revenue per unit. The step that causes the most errors is deciding which price to divide by. Use the average realized price, not the ticket (full) price.
- Start with the net sales target for the season.
- Estimate the average ticket price from the price architecture, weighted by how many units you expect in each tier.
- Adjust for the markdown you expect. If you expect to sell some units at a discount, the average realized price is lower than the average ticket price.
- Divide the net sales target by the average realized price. The result is the unit budget.
Here is a small worked example in Python. The tier mix and markdown rate are assumptions you would replace with your own.
net_sales_target = 900_000.0
tiers = [
# (tier name, ticket price, share of units)
("entry", 60.0, 0.35),
("core", 100.0, 0.45),
("premium", 150.0, 0.20),
]
expected_markdown_rate = 0.12 # average discount across all units
avg_ticket = sum(price * share for _, price, share in tiers)
avg_realized = avg_ticket * (1 - expected_markdown_rate)
unit_budget = net_sales_target / avg_realized
print(round(avg_ticket, 2))
print(round(avg_realized, 2))
print(round(unit_budget))The weighted ticket price is 96.00, the realized price is 84.48, and the unit budget is about 10,653 units. If you had divided by the ticket price instead, you would have planned about 9,375 units. You would have missed the sales target by roughly 12 percent.
The relationship between margin and cost
The price architecture gave each tier a target margin. The financial target now checks that those tier margins add up to the company margin. Margins do not average simply, because tiers sell in different volumes. Weight each tier's margin by its share of revenue, not by its share of styles.
A common error is to average the margin of each style. A style that sells 50 units counts the same as one that sells 5,000. The plan then reports a margin the company will never earn.
The first code example in this tutorial's plan computes a simple average across styles. That is a good first screen when you are choosing styles, but it is not the figure to compare with the budget. Once you have unit estimates, use the revenue-weighted version below.
styles = [
# (id, ticket price, unit cost, planned units)
("D01", 120.0, 40.0, 900),
("T01", 60.0, 18.0, 2200),
("K01", 110.0, 36.0, 700),
("B01", 90.0, 28.0, 1100),
]
revenue = sum(price * units for _, price, _, units in styles)
cost = sum(cost * units for _, _, cost, units in styles)
weighted_margin = (revenue - cost) / revenue
simple_margin = sum((p - c) / p for _, p, c, _ in styles) / len(styles)
print(round(weighted_margin, 3))
print(round(simple_margin, 3))The weighted margin is about 0.69 and the simple margin is about 0.70. The gap is small here. It grows when the lowest-margin styles carry the most units, which is common for entry-priced basics.
Splitting the budget across categories
The unit budget is allocated to categories before it is allocated to styles. Start from the category structure you built earlier. Then assign each category a share of units and a share of sales. These two shares are usually different. Knitwear may be 15 percent of units but 22 percent of sales because the price is higher.
Sources for the split, in rough order of reliability:
- Last year's sell-through by category, adjusted for stock that was left over.
- The brand's customer profile and positioning from the first chapters.
- Category growth or decline signals from the sales team or wholesale buyers.
- Opportunity: a category the brand wants to build and is willing to under-deliver in.
The table shows a plan for a 10,650-unit season. Check that the shares of units and sales each total 100 percent before you move on.
| Category | Unit share | Units | Avg. realized price | Sales share |
|---|---|---|---|---|
| Dress | 20% | 2,130 | 105.00 | 26% |
| Top | 35% | 3,728 | 60.00 | 26% |
| Knitwear | 15% | 1,598 | 110.00 | 20% |
| Bottom | 30% | 3,195 | 85.00 | 28% |
The table shows why a category cannot be judged by unit share alone. Tops are the largest block of units but account for the same sales share as dresses with far fewer units.
Constraints that cap the unit budget
The unit budget is not only a sales calculation. Three constraints can lower it.
- Minimums. Mills and factories set minimum order quantities per fabric, color, or style. A style planned below the minimum either costs more per unit or has to be cut.
- Open-to-buy. The company may limit the money spent on inventory. Units multiplied by unit cost must fit inside it.
- Capacity. Design, sampling, and production teams can only develop a certain number of styles in the window the calendar allows.
Check the cash limit directly. Total cost is the sum of unit cost times planned units. In the example above, cost is the sum of the cost lines, and it must be less than or equal to the inventory budget for the season.
Testing the range against the budget
Once the budget is allocated, you can test whether the number of styles you have in mind is sensible. Divide the unit budget by the number of styles. This gives the average units per style, a figure to compare with the minimums.
The second code example in the plan applies this idea at a finer level of detail. With 40 styles, 3 colors per style, and 5 sizes, there are 120 color-ways and 600 SKUs. A 12,000-unit budget gives 100 units per color-way and 20 units per SKU.
styles = 40
avg_colors_per_style = 3
sizes_per_style = 5
unit_budget = 12000
color_ways = styles * avg_colors_per_style
units_per_color_way = unit_budget / color_ways
units_per_sku = units_per_color_way / sizes_per_style
print(color_ways)
print(units_per_color_way)
print(units_per_sku)Twenty units per SKU is thin. Sizes at the ends of the range will sell in ones and twos, and any size that sells out has no replacement. If the factory minimum is 300 units per color-way, this plan fails by a wide margin. The next chapter covers how to adjust breadth and depth. For now, remember that the financial budget is what reveals the problem.
What to do when the numbers do not fit
When the range and budget disagree, you have four levers.
- Cut styles. Fewer styles raise units per style. This is usually the cleanest fix.
- Cut colors. Fewer color-ways raise depth without losing silhouettes.
- Raise the budget. Argue for more units only with evidence, such as a strong previous sell-through.
- Change the price mix. Moving units toward higher tiers raises sales per unit, which lowers the unit count needed for the same revenue.
Record which lever you used and why. The review stage depends on these notes.
A diagram of the flow
Common errors
- Dividing by ticket price instead of realized price.
- Averaging style margins without weighting by units or revenue.
- Allocating units to styles before allocating them to categories.
- Treating the unit budget as fixed when minimums make it impossible.
- Forgetting that sales and unit shares differ by category.
Exercises
Exercise
A season has a net sales target of 600,000. The average ticket price is 80.00 and the expected average markdown is 10 percent. How many units should you plan, rounded to the nearest whole unit? What would you have planned if you had used the ticket price?
Show answer
The realized price is 80.00 x 0.90 = 72.00. The unit budget is 600,000 / 72.00 = 8,333 units. Using the ticket price gives 600,000 / 80.00 = 7,500 units, which is 833 units short.
Exercise
A plan has 30 styles, 2 colors per style, and 4 sizes per style. The unit budget is 7,200 and the factory minimum is 150 units per color-way. Does the plan meet the minimum? If not, what is the largest number of styles that does, keeping 2 colors per style?
Show answer
Color-ways are 30 x 2 = 60, so each gets 7,200 / 60 = 120 units, below 150. The plan fails. The maximum number of color-ways is 7,200 / 150 = 48, which is 24 styles with 2 colors each.
Exercise
Why is a simple average of style margins a poor check against the company margin target, and what should you use instead?
Show answer
A simple average gives every style equal weight, even though styles sell very different numbers of units. High-volume, low-margin basics can pull the real margin below the average. Use the revenue-weighted margin: total revenue minus total cost, divided by total revenue, using planned units.