Sub topic 12
Putting the Plan into One Document
What this chapter assumes
You should already know the inputs this chapter pulls together: the price tiers and margin targets, the breadth and depth numbers, the delivery windows, and the size and fit range. You should also be comfortable reading a spreadsheet and working with percentages. The chapter shows how to combine those decisions into a single line plan document. That document is the artifact the balance checks and the range review will work on.
Why a single document
Early line planning produces decisions in separate places: a price ladder in one file, a color grid in a deck, a delivery calendar in an email thread. Each is correct on its own, but no one can tell whether they agree with each other. When design, merchandising, sourcing, and finance each work from a different copy, you get predictable errors. A style is priced in one file and costed in another. A delivery is dropped from the calendar but still appears in the unit budget.
The line plan document fixes this by being the single source of truth for what the collection contains. Anything the team needs to ask about a style should be answerable from one row of this document. Anything it needs to ask about the whole collection should be answerable from the summary of those rows.
The three layers
A usable line plan has three layers. Keep them visibly separate, either as separate sheets or as clearly labeled blocks.
- Assumptions. The fixed inputs for the season: unit budget, target margin, price tiers, delivery windows, size range, and sizing curve. Everything else is calculated from these.
- Style rows. One row per style, holding the decisions made for that style.
- Roll-ups. Totals and shares calculated from the style rows: styles by category, by role, by price tier, and by delivery, plus units, retail value, and margin.
The rule that holds the layers together is that roll-ups are always calculated, never typed. If a total is typed in by hand, it will drift from the rows beneath it within a week.
Assumptions block
Put these at the top of the document, with an owner and a date for each.
| Assumption | Example value | Source chapter |
|---|---|---|
| Total unit budget | 12,000 units | Sales, margin, and unit budgets |
| Target average gross margin | 65% at full retail | Price tiers and margin targets |
| Price tiers | Entry, better, best | Price tiers and margin targets |
| Delivery windows | D1 (early), D2 (mid) | Delivery scheduling |
| Size range | 5 sizes per style | Size and fit range |
| Minimum units per SKU | 18 | Breadth and depth |
The minimum units per SKU is a planning rule, not a law. Set it with sourcing, because it reflects the factory's minimum order and how small a size run the business can accept.
The style row
Each row must contain enough information that nobody has to open another file to understand the style. The table below lists the columns most plans need.
| Column | Purpose | Notes |
|---|---|---|
| Style ID | Stable key | Never reuse an ID after a style is cut |
| Name | Working description | Short and unambiguous |
| Category | Roll-up key | From the category architecture |
| Silhouette | Shape or fit family | Lets you check duplication |
| Role | Core, fashion, or statement | From the product roles |
| Price tier | Position on the price ladder | Must match the retail price |
| Retail price | Planned full price | In the plan's currency |
| Target cost | Landed cost goal | Not the quoted cost |
| Colors | Number and names of color-ways | Count drives SKU math |
| Fabric | Main fabric reference | Needed for fabric roll-ups |
| Sizes | Size range or count | Differs for extended or petite lines |
| Units | Total planned units | Split across color-ways later |
| Delivery | Delivery window | One value per style, or one row per delivery |
| Status | Proposed, confirmed, cut | Used during review |
Two choices deserve explicit decisions.
- One row per style or one row per color-way. A row per style is easier to read. A row per color-way supports unit planning, but the row count triples. A common compromise is one row per style, with the color count and names held in the row, and a separate color-way sheet generated from it.
- Delivery per style. If a style ships in two windows, split it into two rows with the same style ID and a suffix. Otherwise the delivery roll-up cannot be calculated correctly.
Building the rows in code
Code is a good way to see how the layers relate. The script below holds a small plan as style rows, checks each row, and calculates the roll-ups. Spreadsheet formulas follow the same logic.
from collections import defaultdict
REQUIRED = ["id", "category", "role", "price_tier", "retail", "cost",
"colors", "sizes", "units", "delivery"]
MIN_UNITS_PER_SKU = 18
rows = [
{"id": "D01", "category": "dress", "role": "core", "price_tier": "better",
"retail": 120.0, "cost": 40.0, "colors": 3, "sizes": 5, "units": 450, "delivery": "D1"},
{"id": "D02", "category": "dress", "role": "fashion", "price_tier": "best",
"retail": 150.0, "cost": 55.0, "colors": 3, "sizes": 5, "units": 300, "delivery": "D2"},
{"id": "T01", "category": "top", "role": "core", "price_tier": "entry",
"retail": 60.0, "cost": 18.0, "colors": 4, "sizes": 5, "units": 600, "delivery": "D1"},
{"id": "T02", "category": "top", "role": "fashion", "price_tier": "entry",
"retail": 75.0, "cost": 24.0, "colors": 3, "sizes": 5, "units": 240, "delivery": "D2"},
{"id": "K01", "category": "knitwear", "role": "core", "price_tier": "better",
"retail": 110.0, "cost": 36.0, "colors": 2, "sizes": 5, "units": 300, "delivery": "D2"},
{"id": "B01", "category": "bottom", "role": "core", "price_tier": "better",
"retail": 90.0, "cost": 28.0, "colors": 3, "sizes": 5, "units": 450, "delivery": "D1"},
]
def check_row(r):
problems = [f"missing {k}" for k in REQUIRED if k not in r]
if problems:
return problems
if r["cost"] >= r["retail"]:
problems.append("cost is not below retail")
per_sku = r["units"] / (r["colors"] * r["sizes"])
if per_sku < MIN_UNITS_PER_SKU:
problems.append(f"{per_sku:.0f} units per SKU is below {MIN_UNITS_PER_SKU}")
return problems
def rollup(rows):
by_delivery = defaultdict(int)
for r in rows:
by_delivery[r["delivery"]] += r["units"]
units = sum(r["units"] for r in rows)
retail_value = sum(r["units"] * r["retail"] for r in rows)
cost_value = sum(r["units"] * r["cost"] for r in rows)
return {
"styles": len(rows),
"units": units,
"retail_value": retail_value,
"margin": round((retail_value - cost_value) / retail_value, 3),
"by_delivery": dict(sorted(by_delivery.items())),
}
for r in rows:
for problem in check_row(r):
print(r["id"], problem)
summary = rollup(rows)
for key, value in summary.items():
print(key, value)Running it prints:
T02 16 units per SKU is below 18
styles 6
units 2340
retail_value 226500.0
margin 0.671
by_delivery {'D1': 1500, 'D2': 840}Three points are worth noting in this output.
- The row check found a real planning problem: T02 has 16 units per SKU, below the floor. The document surfaced this without anyone reading every row.
- The margin of 0.671 is weighted by units. The simple average of the six style margins would be different, because the high-volume styles carry more weight. Always roll margin up from value, not by averaging percentages.
- The margin here is the margin at full retail. It ignores markdowns and any wholesale discount, so it is a planning ceiling and not a forecast of what the business will earn.
Where each input comes from
The document gathers decisions made in earlier chapters, and each one maps to a specific part of the plan.
Each arrow is a place where the document can contradict its source. When you assemble the plan, confirm each input once against the chapter or file it came from. A common example is a price tier column that says "entry" for a style whose retail price falls in the "better" band.
Common errors
- Typed totals. A hand-entered total no longer matches the rows after the first edit. Use formulas for every roll-up.
- Units without a color-way split. A style row with 450 units hides the fact that one color might hold 300 of them. Check that unit totals split sensibly across color-ways.
- Mixed cost definitions. Some rows carry a quoted cost and others a target cost. The margin roll-up then mixes two different things. Pick one definition and label the column.
- Reused style IDs. If a cut style's ID goes to a new style, old notes and approvals attach to the wrong product. Retire IDs permanently.
- Missing delivery on a row. A blank delivery drops the style from the delivery roll-up, so the totals look smaller than the plan really is. Make the check fail on blanks.
- Silent edits. Changing a price or unit count without recording it makes the review impossible to reconstruct.
Ownership and versions
A line plan changes weekly in the early phase. Treat it like a controlled document.
- Name one owner, usually the merchandiser or product manager, who accepts changes.
- Save a dated version at each gate: first draft, after balance checks, after range review, and at development release.
- Add a change log sheet with the date, style ID, what changed, and why.
- Lock the assumptions block once finance signs it off. Changes to it should be rare and visible.
The change log pays off during the range review. When someone asks why a style was cut or why a price rose, the answer is already written down.
A short assembly checklist
Before you hand the document to the balance checks, confirm each of these.
- Every row passes the required-field check.
- Every roll-up is a formula, and the style count matches the number of rows.
- Retail price and price tier agree on every row.
- Units sum to the budget, or the gap is explained.
- Each delivery window has styles in it.
- The assumptions block has an owner and a date.
Exercise
A line plan has 40 styles, an average of 3 colors per style, 5 sizes per style, and a 12,000-unit budget. The plan's minimum is 18 units per SKU. Does the plan pass the check, and what would you change in the document if it did not?
Show answer
There are 40 × 3 = 120 color-ways, so each gets 12,000 / 120 = 100 units. Each SKU gets 100 / 5 = 20 units, which is above the floor of 18, so the plan passes on average. The average can hide problems, though. The row check should still run on every style, because a style with 4 colors and a low unit share can fall below 18 even when the average passes. If a row failed, you would raise its units, cut a color, or merge it with a similar style, and record the change in the change log.
Exercise
Why should the margin roll-up be calculated from retail value and cost value instead of by averaging each style's margin percentage?
Show answer
A simple average gives every style the same weight, so a low-volume style counts as much as a high-volume one. Calculating from units times retail and units times cost weights each style by how much of it is planned, which gives the margin the plan will actually carry.